Wind power in India
Wind power generation capacity in India has significantly increased in recent years. As of the end of March 2017 the total installed wind power capacity was 32.17 GW, mainly spread across the South, West and North regions.[1][2] By the end of 2015, India had the fourth largest installed wind power capacity in the world.[3][4] The levelised tariff of wind power reached a record low of ₹3.46 (5.4¢ US) per kWh (without any direct or indirect subsidies) during auctions for wind projects in February 2017.[5][6]
The development of wind power in India began in 1986 with the first wind farms being set up in coastal areas of Maharashtra (Ratnagiri), Gujarat (Okha) and Tamil Nadu (Tirunelveli) with 55 kW Vestas wind turbines. These demonstration projects were supported by the Ministry of New and Renewable Energy (MNRE).
The potential for wind farms in the country was first assessed in 2011 to be more than 2,000 GW by Professor Jami Hossain of TERI University, New Delhi. This was subsequently re-validated by Lawrence Berkley National Laboratory, US (LBNL) in an independent study in 2012. As a result, the MNRE set up a committee to reassess the potential[7] and through the National Institute of Wind Energy (NIWE, previously C-WET) has announced a revised estimation of the potential wind resource in India from 49,130 MW to 302,000 MW assessed at 100 m hub height.[8] Wind turbines are now being set up at even 120 m hub height and the wind resource at higher hub heights of around 120 m or more that are prevailing is possibly even more. In 2015, the MNRE set the target for Wind Power generation capacity by the year 2022 at 60,000 MW.[2][9]
East and North east regions have no grid connected wind power plant as of March 2015. No offshore wind farm are under implementation. However, an Offshore Wind Policy was announced in 2015 and presently weather stations and LIDARs are being set up by NIWE at some locations.
Monthly electricity generation
Wind power accounts nearly 9.87% of India's total installed power generation capacity and generated 46,011 million kWh in the fiscal year 2016-17 which is nearly 3% of total electricity generation.[10] The capacity utilisation factor is nearly 19.62% in the fiscal year 2016-17 (14% in 2015-16). 70% of wind generation is during the five months duration from May to September coinciding with Southwest monsoon duration.[11]
Fiscal | Year End Cumulative Capacity (in MW) |
---|---|
2005 | 6,270 |
2006 | 7,850 |
2007 | 9,587 |
2008 | 10,925 |
2009 | 13,064 |
2010 | 16,084 |
2011 | 18,421 |
2012 | 20,149 |
2013 | 21,264 |
2014 | 23,354 |
2015 | 26,769 |
2016 | 32,280 |
Month | North | West | South | East | North East | Total (GWh) |
---|---|---|---|---|---|---|
April 2016 | 389.22 | 1,247.89 | 594.23 | - | - | 2,231.34 |
May 2016 | 835.44 | 2,325.41 | 971.22 | - | - | 4,132.07 |
June 2016 | 748.81 | 2,626.66 | 2,478.78 | - | - | 5,854.25 |
July 2016 | 885.99 | 2,688.32 | 3,403.20 | - | - | 6,977.50 |
August 2016 | 449.42 | 2,844.68 | 3,524.68 | - | - | 6,818.77 |
September 2016 | 631.81 | 1,690.13 | 3,274.02 | - | - | 5,595.97 |
October 2016 | 339.48 | 730.70 | 2,537.50 | - | - | 3,607.68 |
November 2016 | 155.90 | 571.09 | 1,136.98 | - | - | 1,863.98 |
December 2016 | 201.95 | 824.41 | 753.53 | - | - | 1,779.89 |
January 2017 | 392.79 | 1,004.97 | 910.69 | - | - | 2,308.45 |
February 2017 | 365.66 | 1,047.70 | 1,072.61 | - | - | 2,485.97 |
March 2017 | 365.15 | 1,181.97 | 808.53 | - | - | 2,355.65 |
Total (GWh) | 5,761.62 | 18,783.93 | 21,465.97 | - | - | 46,011.52 |
Statistics
The table below shows the India's year on year installed wind power, annual wind power generation and annual growth in wind power generation since 2007.
Financial Year | 06-07 | 07-08 | 08-09 | 09-10 | 10-11 | 11-12 | 12-13 | 13-14 | 14-15 | 15-16 | 16-17 | 17-18 | 18-19 | 19-20 | 20-21 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Installed Capacity (MW) | 7,850 | 9,587 | 10,925 | 13,064 | 16,084 | 18,421 | 20,150 | 22,465 | 23,447 | 26,777 | 32,280 | ||||
Generation (GWh) | 28,214 | 28,604 | 46,011 | ||||||||||||
Growth % | 2 | 60 | |||||||||||||
Wind power by state
There is a growing number of wind energy installations in states across India.
State | Total Capacity (MW) |
---|---|
Tamil Nadu | 7,684.31 |
Maharashtra | 4,664.08 |
Gujarat | 4,227.31 |
Rajasthan | 4,123.35 |
Karnataka | 3,082.45 |
Madhya Pradesh | 2,288.60 |
Andhra Pradesh | 1,866.35 |
Telangana | 98.70 |
Kerala | 43.50 |
Others | 4.30 |
Total | 28,082.95 |
Tamil Nadu
Tamil Nadu's wind power capacity is around 29% of India's total. The Government of Tamil Nadu realized the importance and need for renewable energy, and set up a separate Agency, as registered society, called the Tamil Nadu Energy Development Agency (TEDA) as early as 1985. Now, Tamil Nadu has become a leader in Wind Power in India. In Muppandal windfarm the total capacity is 1500 MW, the largest wind power plant in India. The total wind installed capacity in Tamil Nadu is 7633 MW.[15] During the fiscal year 2014-15, the electricity generation is 9.521 GWh, with about a 15% capacity utilization factor.[16]
Maharashtra
Maharashtra is one of the prominent states that installed wind power projects second to Tamil Nadu in India. As of end of March 2016, installed wind power capacity is 4655.25 MW . As of now there are 50 developers registered with state nodal agency "Maharashtra energy Development Agency" for development of wind power projects. All the major manufacturers of wind turbines including Suzlon, Vestas, Gamesa, Regen, Leitner Shriram have presence in Maharashtra.
Gujarat
Gujarat government's focus on tapping renewable energy has led to sharp rise in the wind power capacity in the last few years. According to official data, wind power generations capacity in the state has increased a staggering ten times in just six years. ONGC Ltd. has installed a 51MW wind energy farm at Bhuj in Gujarat. Renewable energy projects worth a massive Rs 1 lakh crore of memorandums of understanding (MoUs) in the Vibrant Gujarat Summit in 2017.[17]
Rajasthan
4031.99 MW wind power installed as per 31.03.2016.
Madhya Pradesh
In consideration of unique concept, Govt. of Madhya Pradesh has sanctioned another 15 MW project to Madhya Pradesh Windfarms Ltd. MPWL, Bhopal at Nagda Hills near Dewas under consultation from Consolidated Energy Consultants Ltd. CECL Bhopal. All the 25 WEGs have been commissioned on 31.03.2008 and under successful operation.[18]
Kerala
55 MW production of wind power is installed in Kerala. The first wind farm of the state was set up 1997 at Kanjikode in Palakkad district.
The agency has identified 16 sites for setting up wind farms through private developers.
Odisha
Odisha a coastal state has higher potential for wind energy. Current installation capacity stands at 2.0 MW. Odisha has a windpower potential of 1700MW. The Govt of Odisha is actively pursuing to boost Wind power generation in the state. however it has not progressed like other states primarily because Odisha having a huge coal reserve and number of existing and upcoming thermal power plants, is a power surplus state.[19]
West Bengal
The total installation in West Bengal is 2.10 MW till Dec 2009 at Fraserganj, Distt- South 24 Paraganas. More 0.5 MW (approx) at Ganga Sagar, Kakdwip, Distt - South 24 Paraganas. Both the project owned by West Bengal Renewable Energy Development Agency (WBREDA), Govt. of WB and project was executed on turnkey basis by Utility Powertech Limited (UPL).
Jammu and Kashmir
The Kargil, Ladakh, occupied Gilgit and China occupied Aksai Chin regions of Jammu and Kashmir state are potential wind energy areas, which are yet to be exploited.[8] Wind Speeds are higher during the winter months in the state, which is complimentary to the hydro power available during the summer months from the snow melt water. Being a Himalayan state located at higher altitude, the heating energy requirements are high which can be met by the renewable energy resources such as wind, solar and hydro power. The state is yet to open its account in grid connected wind power installations.
Projects
India's largest wind power production facilities (10MW and greater)[20]
Rank | Power plant | Producer | Location | State | MWe |
---|---|---|---|---|---|
1 | Muppandal windfarm[21] | Muppandal Wind | Kanyakumari | Tamil Nadu | 1500 |
2 | Jaisalmer Wind Park[22] | Suzlon Energy | Jaisalmer | Rajasthan | 1064 |
3 | Brahmanvel windfarm[23] | Parakh Agro Industries | Dhule | Maharashtra | 528 |
4 | Dhalgaon windfarm[24] | Gadre Marine Exports | Sangli | Maharashtra | 278 |
5 | Vankusawade Wind Park | Suzlon Energy Ltd. | Satara District. | Maharashtra | 259 |
6 | Vaspet | ReNew Power | Vaspet | Maharashtra | 144 |
7 | Beluguppa Wind Park | Orange Renewable | Beluguppa | Andhra Pradesh | 100.8 |
8 | Mamatkheda Wind Park | Orange Renewable | Mamatkheda | Madhya Pradesh | 100.5 |
9 | Anantapur Wind Park | Orange Renewable | Nimbagallu | Andhra Pradesh | 100 |
10 | Damanjodi Wind Power Plant | Suzlon Energy Ltd. | Damanjodi | Odisha | 99 |
11 | Jath | ReNew Power | Jath | Maharashtra | 84 |
12 | Welturi | ReNew Power | Welturi | Maharashtra | 75 |
13 | Acciona Tuppadahalli | Tuppadahalli Energy India Pvt Ltd | Chitradurga District | Karnataka | 56.1 |
14 | Dangiri Wind Farm | Oil India Ltd. | Jaiselmer | Rajasthan | 54 |
15 | Bercha Wind Park | Orange Renewable | Ratlam | Madhya Pradesh | 50 |
16 | Cape Comorin | Aban Loyd Chiles Offshore Ltd. | Kanyakumari | Tamil Nadu | 33 |
17 | Kayathar Subhash | Subhash Ltd. | Kayathar | Tamil Nadu | 30 |
18 | Jasdan | ReNew Power | Jasdan | Gujarat | 25.2 |
19 | Ramakkalmedu | Subhash Ltd. | Ramakkalmedu | Kerala | 25 |
20 | Gudimangalam | Gudimangalam Wind Farm | Gudimangalam | Tamil Nadu | 21 |
21 | Shalivahana Wind | Shalivahana Green Energy. Ltd. | Tirupur | Tamil Nadu | 20.4[25] |
22 | Puthlur RCI | Wescare (India) Ltd. | Puthlur | Andhra Pradesh | 20 |
23 | Lamda Danida | Danida India Ltd. | Lamba | Gujarat | 15 |
24 | Chennai Mohan | Mohan Breweries & Distilleries | Chennai | Tamil Nadu | 15 |
25 | Shah Gajendragarh | MMTCL | Gadag | Karnataka | 15 |
26 | Jamgudrani MP | MP Windfarms Ltd. | Dewas | Madhya Pradesh | 14 |
27 | Jogmatti BSES | BSES Ltd. | Chitradurga District | Karnataka | 14 |
28 | Perungudi Newam | Newam Power Company Ltd. | Perungudi | Tamil Nadu | 12 |
29 | Kethanur Wind Farm | Kethanur Wind Farm | Kethanur | Tamil Nadu | 11 |
30 | Shah Gajendragarh | Sanjay D. Ghodawat | Gadag | Karnataka | 10.8 |
31 | Hyderabad TSRTC | Telangana SRTC | Hyderabad | Telangana | 10 |
32 | Muppandal Madras | Madras Cements Ltd. | Muppandal | Tamil Nadu | 10 |
34 | Poolavadi Chettinad | Chettinad Cement Corp. Ltd. | Poolavadi | Tamil Nadu | 10 |
Optimisation of wind power
Once the location of wind farm is selected based on the available wind data, next step is to optimise the wind power out put from the farm area using the available wind turbines from the manufactures. The spacing between the adjacent wind turbine is between 5 and 9 times of the rotor diameter in the prominent wind direction and 3 to 5 times perpendicular to wind direction.[26][27] If needed CFD analysis can be performed to finalise the optimum layout. Higher rotor diameter increases the swept area of wind by increasing the wind turbine power.[28] Higher hub height from the ground enables the rotor to use high velocity air available at higher elevation. Selecting a bigger rotor diameter and more hub height with latest transmission (mechanical to electrical energy) technology would maximise a wind farm power generation capacity, reduce the wind electricity generating cost and optimise the installation cost per MW capacity.[29]
Barriers
Initial cost for wind turbines is greater than that of conventional fossil fuel generators and capacity expansion of existing hydro power plants with pumped storage hydro units.[30] Noise is produced by the rotor blades. This is not normally an issue in the locations chosen for most wind farms.
Most of the wind power generation is during the south west monsoon season when rivers usually flood with water generating cheaper secondary hydro power. Scheduling the wind power which is unpredictable secondary power (even on daily basis), at fair price is a problem during monsoon season. Also adding additional pumped-storage hydroelectricity units instead of new wind power plants to produce predictable secondary power on daily basis during monsoon months and pumped storage operation for converting excess power in to peaking power during the rest of the year is more economical and commercial proposition.
When large wind power plants are located away from the load centres, laying dedicated transmission lines to evacuate the unreliable secondary wind power is additional cost liability. In India, solar power is complementary to wind power as it is generated mostly during the non monsoon period in day time.[31] Solar power plants can be located in the inter space between the towers of wind power plants or nearby area with common power evacuation facility. The wind power plant should guarantee minimum power generation/export in a year (say 15% capacity factor) to the purchaser.
In case the generation is below the guaranteed minimum power export, penalty should be applicable for the electricity which is short fall. This is to prevent over declaration of plant nameplate capacity to mobilise 100% debt financing by promoters without real equity contribution.
The wind power policy allows accelerated depreciation of the wind power plants cost out of the profits accrued from other businesses of a company to cut down the overall company's tax liability. Businessmen are using short sightedly this window for reducing tax liability by installing cheaper wind mills of vintage technology based on supplier's claims without liability. This method of wind projects financing and implementation is leading to inefficient harnessing of the available wind potential.[32]
Wind power plants need very less land (less than one acre/MW for tower foundation, access road, substation, power evacuation lines, etc.) compared to other power generation technologies. It uses air space without effecting vegetation on the ground. Air space is a national resource similar to mines, spectrum, etc. Wind potential shall be auctioned to the highest bidder for its efficient use.[33] Already very good sites with attractive wind potential are harnessed without reaping optimum value.[32][34]
Offshore wind power plants
India is planning to enter into offshore wind power, with a 100 MW demonstration plant located off the Gujarat coast.[35] In 2013, a consortium (instead of group of organizations), led by Global Wind Energy Council (GWEC) started project FOWIND (Facilitating Offshore Wind in India) to identify potential zones for development of off-shore wind power in India and to stimulate R & D activities in this area.[36] The other consortium partners include the Centre for Study of Science, Technology and Policy (CSTEP), DNV GL, the Gujarat Power Corporation Limited (GPCL) and the World Institute of Sustainable Energy (WISE). The consortium was awarded the grant of €4.0 million by the delegation of the European Union to India in 2013 besides co-funding support from GPCL. The project action will be implemented from December 2013 to March 2018.
The project focuses on the States of Gujarat and Tamil Nadu for identification of potential zones for development through techno-commercial analysis and preliminary resource assessment. It will also establish a platform for structural collaboration and knowledge sharing between stakeholders from European Union and India, on offshore wind technology, policy, regulation, industry and human resource development. FOWIND activities will also help facilitate a platform to stimulate offshore wind related R&D activities in the country. The consortium published initial pre-feasibility assessment reports for offshore wind farm development in Gujarat and Tamil Nadu on 16 June 2015.[37][38] In September 2015, the India's cabinet has approved the National Offshore Wind Energy Policy. With this, the Ministry of New & Renewable Energy (MNRE) has been authorized as the Nodal Ministry for use of offshore areas within the Exclusive Economic Zone (EEZ)[39]
See also
References
- ↑ "Record Capacity Addition of Wind Power of 5400 MW in Last Fiscal". Ministry of New and Renewable Energy, Govt. of India. 11 April 2017. Retrieved 19 September 2016.
- 1 2 "Physical Progress (Achievements)". Ministry of New and Renewable Energy, Govt. of India. 31 July 2017. Retrieved 19 September 2016.
- ↑ "World Wind Resource Assessment Report". "World Wind Resource Assessment Report"
- ↑ "Wind atlas of India". Retrieved 2014-08-28.
- ↑ "India's wind power tariffs hit new low in push for renewables". The Economic Times. Retrieved 24 February 2017.
- ↑ "Govt auctions 1000 MW of projects at Rs 3.46 a unit". The Economic Times. Retrieved 3 March 2017.
- ↑ "India Wind Power Potential".
- 1 2 "Estimation of Installable Wind Power Potential at 80 m level in India". Retrieved 16 May 2015.
- ↑ "Tentative State-wise break-up of Renewable Power target to be achieved by the year 2022 So that cumulative achievement is 1,75,000 MW" (PDF). http://mnre.gov.in. Retrieved 7 May 2015. External link in
|website=
(help) - ↑ "NLDC monthly reports (refer table 7 of each month)". Retrieved 23 April 2017.
- ↑ "State-wise monthly renewable power generation, CEA". Retrieved 30 November 2016.
- ↑ "Monthly Renewable Energy Generation Reports, CEA". Retrieved 23 April 2017.
- ↑ "State wise installed capacity as of 19 October 2016". Retrieved 20 October 2016.
- ↑ "Installed capacity of wind power projects in India". Retrieved 11 August 2016.
- ↑ , Tamil Nadu Energy Development Agency - Site.
- ↑ "SRLDC monthly report, March 2015" (PDF). Retrieved 8 May 2015.
- ↑ "Vibrant Gujarat Summit: Rs 1 lakh crore fuel to fire up renewable energy - Times of India". The Times of India. Retrieved 2017-01-17.
- ↑ "Developer of Wind Power Estate". Wind Power India. Retrieved 2010-11-27.
- ↑ "Wind power and solar energy in Odisha". REVE. Retrieved 2012-04-04.
- ↑ "Indian Wind Energy - Projects, Companies, Research, Data, Statistics - Energy Alternatives India". EAI.in. Retrieved 2010-11-27.
- ↑ "Muppandal windfarm". Retrieved 2 February 2014.
- ↑ "Jaisalmer windfarm". Retrieved 2 February 2014.
- ↑ "Brahmanvel windfarm (India)". Retrieved 2 February 2014.
- ↑ "Dhalgaon windfarm". Retrieved 2 February 2014.
- ↑ "Shalivahana Green Energy | Bio Mass | Municipal Solid Waste | Wind Energy | Hydel Energy". Shalivahanagroup.com. Retrieved 2012-09-17.
- ↑ "Wind turbines". Retrieved 7 May 2015.
- ↑ "10 Wind Turbines That Push the Limits of Design". Retrieved 7 May 2015.
- ↑ "Wind turbine capacity vs rotor diameter". Retrieved 7 May 2015.
- ↑ "How It Works: Gearless wind Turbine". Popsci.com. 2010-03-26. Retrieved 2013-11-06.
- ↑ http://www.greenworldinvestor.com/2011/04/08/wind-power-plants-in-india-guide-to-cost-and-how-to-setup-a-wind-farmstate-wind-capacitywind-subsidies-and-list-of-major-wind-farms-in-india/
- ↑ "ReGen enters solar power with hybrid solution". Retrieved 16 October 2015.
- 1 2 "Assessment of investment Climate for Wind Power Development in India" (PDF). Retrieved 16 May 2015.
- ↑ "Govt can use auctions to get renewable energy projects: Study". Retrieved 16 May 2015.
- ↑ "Government seeks to phase out all sub 1 MW wind turbines built before 2000". Retrieved 6 March 2016.
- ↑ "MOU Signed for First Ever Offshore Wind Power Project in India". http://pib.nic.in. Press Information Bureau, Government of India. 1 October 2014. Retrieved 30 April 2015. External link in
|website=
(help) - ↑ "FOWIND Project". Retrieved 13 August 2015.
- ↑ pre-feasibility assessment reports "FOWIND Project" Check
|url=
value (help). Retrieved 13 August 2015. - ↑ R. Srikanth; Sangeetha Kandavel (29 January 2015). "Tapping the offshore wind". The Hindu. Retrieved 30 April 2015.
- ↑ "National Offshore Wind Power Policy 2015". GKToday. 2015-11-03. Retrieved 2015-11-03.
External links
Wikimedia Commons has media related to Wind power in India. |
- Indian Wind Power - Magazine
- How winds of change could be an alternative to coal
- Energy-hungry India eyes role as "wind superpower"
- Consolidated Energy Consultants Ltd. India
- Wind power in Kerala