Wachusett Dam

Wachusett Dam

Wachusett Dam at Clinton
Official name Wachusett Reservoir Dam
Location Clinton, Massachusetts, USA
Coordinates 42°24′13″N 71°41′16″W / 42.40361°N 71.68778°W / 42.40361; -71.68778Coordinates: 42°24′13″N 71°41′16″W / 42.40361°N 71.68778°W / 42.40361; -71.68778
Construction began 1897
Opening date 1905
Operator(s) MWRA
Dam and spillways
Impounds Nashua River
Height 205 ft
Length 965 ft
Reservoir
Creates Wachusett Reservoir
Wachusett Dam Historic District
Location Clinton, Massachusetts
Architect Shepley, Rutan and Coolidge; Olmsted Brothers
MPS Water Supply System of Metropolitan Boston MPS
NRHP Reference # 89002269[1]
Added to NRHP January 18, 1990

The Wachusett Dam in Clinton, Massachusetts impounds the Nashua River creating the Wachusett Reservoir. Construction started in 1897[2] and was completed in 1905. It is part of the Nashua River Watershed.

This dam is part of greater Boston's water system, maintained and controlled by the Massachusetts Water Resources Authority (MWRA). Its discharge is into the Nashua River. When it was completed in 1905, the Wachusett Reservoir was the largest public water supply reservoir in the world.[2] At that time, the Wachusett Reservoir Dam was the largest gravity dam in the world as well.

Construction

The Metropolitan Water Board selected the south branch of the Nashua River in Clinton as the best site for Boston's new water supply over New Hampshire's Lake Winnipesaukee, Maine's Sebago Lake, and the Merrimack River.[2]

Churches, factories, homes, and schools within the valley had to be knocked down or moved. Roads and rail lines had to be relocated; a railroad tunnel and trestle had to be built in order to relocate the Central Massachusetts Railroad, and over four thousand bodies had to be dug up and moved in the local Catholic cemetery. The project brought thousands of immigrants to the area for work.

The dam created the world's largest water supply reservoir at the time.[2] It is still considered the largest "hand dug" dam in the world today.

Early problems

A static liquefaction flow failure occurred in the upstream slope of the North Dike of Wachusett Dam near Clinton, Massachusetts on April 11, 1907 during the first reservoir filling. The fine sands of the upstream dike shell liquefied and flowed approximately 100 meters horizontally into the reservoir. This caused many Clinton residents considerable concern. However, the project’s Chief Engineer, Frank E. Winsor, assured the townsfolk that everything was okay. This event remains controversial. At least one engineering study claims that the initial failure is a precursor to the dam’s future failure. However, it has now stood for over one hundred years.

See also

References

  1. National Park Service (2007-01-23). "National Register Information System". National Register of Historic Places. National Park Service.
  2. 1 2 3 4 History: Wachusett
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.