Uganda–Tanzania Crude Oil Pipeline
Uganda–Tanzania Crude Oil Pipeline | |
---|---|
Map of Uganda–Tanzania Crude Oil Pipeline | |
Location | |
Country | Uganda & Tanzania |
Coordinates | 01°15′54″S 31°40′33″E / 1.26500°S 31.67583°E |
General direction | West to East |
From | Hoima, Uganda |
Passes through | Bukoba, Tanzania |
To | Tanga, Tanzania |
General information | |
Type | Oil pipeline |
Partners | Total SA |
Commissioned | 2020 (Expected)[1][2] |
Technical information | |
Length | 897 mi (1,444 km) |
The Uganda–Tanzania Crude Oil Pipeline (UTCOP), also known as the East African Crude Oil Pipeline,[3] is under construction[4] and intended to transport crude oil from Uganda's oil fields to the Port of Tanga, Tanzania on the Indian Ocean.[5]
Location
The oil pipeline would start in Buseruka sub-county, Hoima District, in Uganda's Western Region. It would travel in a general south-easterly direction to pass through Masaka in Uganda, Bukoba in Tanzania, loop around the southern shores of Lake Victoria, continue through Shinyanga and Siginda, to end in Tanga,[6] a distance of approximately 1,410 kilometres (880 mi).[7]
Background
Uganda has proven oil reserves exceeding 6.5 billion barrels, of which about 2.2 billion barrels are recoverable.[8] The country plans to build a refinery in the Western Region to process what is needed locally and regionally, with the rest exported via pipeline to the Indian Ocean coast.[9]
Uganda previously agreed to build a joint Uganda–Kenya Crude Oil Pipeline to the Kenyan port of Lamu.[10][11]
Concerns regarding security and cost, however, motivated parallel negotiations with Tanzania regarding a shorter and safer route to Port Tanga, with the support of the French petroleum conglomerate Total SA.[12][13]
At the 13th Northern Corridor Heads of State Summit in Kampala in April 2016, Uganda officially announced its choice for the Tanzania route for its crude oil, in preference to the Mombasa or Lamu routes in Kenya. At that summit, the presidents of both Kenya and Rwanda were present, along with representatives from Ethiopia, South Sudan, and Tanzania.[14][15] At the same summit, President Uhuru Kenyatta announced that Kenya would build the Kenya Crude Oil Pipeline on its own, thereby abandoning the Uganda–Kenya Crude Oil Pipeline.[16][17]
The 1,445 kilometres (898 mi) planned pipeline is expected to be built at a budgeted cost of US$3.5 billion.[18][19] The pipeline, 24 inches (61 cm) in diameter, is planned to have capacity of 216,000 barrels of crude oil every 24 hours at a cost of US$12.2 per barrel to Uganda.[18][20]
Cost, funding, and timetable
It was expected that construction would start in August 2016 and last three years at a budgeted cost of US$4 billion, offering approximately 15,000 construction jobs and between 1,000 and 2,000 permanent jobs.[21] In March 2016, the Daily Monitor newspaper reported that Total E&P is prepared to spend US$4 billion (UGX:13 trillion) to fund construction of this pipeline.[7] Following meetings between delegations led by the oil ministers of both Tanzania and Uganda, held in Hoima in July 2016, it was announced that construction of the 1,443 kilometres (897 mi) pipeline would begin in January 2017 and last 36 months.[22] Completion of the pipeline is planned for 2020.[23]
Oil refinery
An oil refinery is also planned to be constructed in western Uganda to process the oil for exports within the East African Community. The $2.5 billion project is to be developed under a public-private partnership, with 60 percent of the project owned by the private developer. The remaining 40 percent would be distributed among east African countries.[24] On 30 April 2016, Tanzania agreed to buy 8 percent of the shares in the refinery for US$150.4 million.[25]
See also
- Uganda Oil Refinery
- Uganda National Oil Company
- Petroleum Authority of Uganda
- Kenya–Uganda–Rwanda Petroleum Products Pipeline
- Hoima–Kampala Petroleum Products Pipeline
References
- ↑ AP (26 April 2016). "Uganda: Hope for oil production by 2018 after pipeline deal". Daily Mail Quoting Associated Press (AP). New York City. Retrieved 27 April 2016.
- ↑ Muhumuza, Rodney (26 April 2016). "Uganda: Agreement to build oil pipeline through Tanzania boosts hopes for production of crude by 2018". US News Quoting Associated Press. New York City. Retrieved 27 April 2016.
- ↑ Editorial (9 August 2017). "Getting crude oil pipeline off ground is great leap". Daily Monitor. Kampala. Retrieved 9 August 2017.
- ↑ The EastAfrican (5 August 2017). "Magufuli, Museveni lay foundation stone for crude oil pipeline". The EastAfrican. Nairobi. Retrieved 5 August 2017.
- ↑ Elias Biryabarema, and Fumbuka Ng'wanakilala (2 March 2016). "Uganda, Tanzania plan oil pipeline". Reuters.com. Retrieved 3 March 2016.
- ↑ Musisi, Frederic (7 March 2016). "Oil pipeline: Which way for Uganda?". Daily Monitor. Kampala. Retrieved 7 March 2016.
- 1 2 Musisi, Frederic (16 March 2016). "Total readies UShs13 trillion for oil pipeline development". Daily Monitor. Kampala. Retrieved 16 March 2016.
- ↑ Patey, Luke (October 2015). "Oil in Uganda: Hard bargaining and complex politics in East Africa" (PDF). Oxford: Oxford Institute for Energy Studies. Retrieved 28 April 2016.
- ↑ Ouga, Samuel (14 August 2013). "Uganda's Oil Refinery – An Opportunity for transformation". New Vision. Kampala. Retrieved 3 March 2016.
- ↑ Biryabarema, Elias (25 June 2013). "Uganda agrees to plan for oil pipeline to new Kenya port". Reuters.com. Retrieved 28 April 2016.
- ↑ Bariyo, Nicholas (25 June 2013). "Uganda, Kenya Agree to Construct Crude export Pipeline to Port Lamu". Wall Street Journal Quoting Dow Jones Newswires. New York City. Archived from the original on 6 July 2013. Retrieved 28 April 2016.
- ↑ Allan Olingo, and James Anyanzwa (17 October 2015). "Regional power play in tussle over new route of Uganda oil pipeline". The EastAfrican. Nairobi. Retrieved 3 March 2016.
- ↑ Abdalah, Halima (13 September 2015). "Oil firms prefer Tanga pipeline route to Lamu". The EastAfrican. Nairobi. Retrieved 3 March 2016.
- ↑ Musisi, Frederic (23 April 2016). "Uganda chooses Tanga route for oil pipeline". Daily Monitor. Kampala. Retrieved 23 April 2016.
- ↑ Musisi, Frederick (26 April 2016). "Transporting oil to Tanzania to cost UShs40,000 per barrel". Daily Monitor. Kampala. Retrieved 26 April 2016.
- ↑ PSCU (23 April 2016). "Kenya will build own pipeline, Uhuru tells EAC summit". Daily Nation. Nairobi. Retrieved 26 April 2016.
- ↑ Ligami, Christabel (16 April 2016). "As Uganda chooses Tanzania pipeline route, Kenya to go it alone". African Review. Nairobi. Retrieved 26 April 2016.
- 1 2 The Independent Uganda (6 August 2017). "Uganda: Museveni, Magufuli Lay Foundation Stone for Oil Pipeline". The Independent (Uganda) via AllAfrica.com. Kampala. Retrieved 8 August 2017.
- ↑ Kidanka, Christopher (6 August 2017). "Tanzania ready to take up pipeline contracts". The EastAfrican. Nairobi. Retrieved 6 August 2017.
- ↑ Barigaba, Julius (6 March 2017). "Museveni’s visit to Dar rescues oil pipeline deal, sets project timelines". The EastAfrican. Nairobi. Retrieved 6 August 2017.
- ↑ Mwakyusa, Alvar (8 March 2016). "East Africa: Construction of Uganda - Tanga Port Oil Pipeline Starts August". Tanzania Daily News via AllAfrica.com. Dar es Salaam. Retrieved 8 March 2016.
- ↑ Mugerwa, Francis (8 July 2016). "Building of Hoima-Tanzania oil pipeline will start in January". The EastAfrican. Nairobi. Retrieved 12 July 2016.
- ↑ Reuters (3 August 2016). "Tanzania aims to complete oil pipeline from Uganda in 2020". The East African Quoting Reuters. Retrieved 3 August 2016.
- ↑ Kasita, Ibrahim (19 September 2013). "East Africa: EAC States to Invest 40 Percent in Oil Refinery". New Vision via AllAfrica.com. Kampala. Retrieved 3 August 2016.
- ↑ Kasumuni, Ludger (30 April 2016). "TZ to spend Sh300bn on buying stake in Uganda refinery". The Citizen (Tanzania). Dar Es Salaam. Retrieved 3 August 2016.
External links
- Uganda shortlists four firms for oil refinery project
- East Africa: DR Congo Shows Interest As Uganda-Tanga Port Oil Pipeline Preps in Top Gear
- Uganda, Tanzania discuss oil pipeline