USS LST-987

History
United States
Name: USS LST-987
Builder: Boston Navy Yard
Laid down: 2 February 1944
Launched: 5 March 1944
Commissioned: 19 April 1944
Decommissioned: 3 September 1946
Renamed: USS Millard County (LST-987), 1 July 1955
Struck: 1 June 1960
Fate: Sold into commercial service, August 1961
 
Name: Columbia
Identification:
Status: In service
Notes: Converted to hopper dredge in 1970s
General characteristics
Class and type: LST-542-class tank landing ship
Displacement:
  • 1,625 long tons (1,651 t) light
  • 3,640 long tons (3,698 t) full
Length: 328 ft (100 m)
Beam: 50 ft (15 m)
Draft:
  • Unloaded :
  • 2 ft 4 in (0.71 m) forward
  • 7 ft 6 in (2.29 m) aft
  • Loaded :
  • 8 ft 2 in (2.49 m) forward
  • 14 ft 1 in (4.29 m) aft
Propulsion: 2 × General Motors 12-567 diesel engines, two shafts, twin rudders
Speed: 12 knots (22 km/h; 14 mph)
Boats & landing
craft carried:
2 × LCVPs
Troops: Approximately 130 officers and enlisted men
Complement: 8-10 officers, 89-100 enlisted men
Armament:

USS Millard County (LST-987) was an LST-542-class tank landing ship built for the United States Navy during World War II. Named after Millard County, Utah, it was the only U.S. Naval vessel to bear the name.

Originally laid down as LST-987 on 2 February 1944 at the Boston Navy Yard; launched on 5 March 1944; and commissioned on 19 April 1944 with Lieutenant William H. Pennington in command.

Service history

World War II, 1944-1945

After shakedown along the east coast, LST-987 began duty under Commander, Amphibious Training Command, Atlantic Fleet. Assigned to LST Group 25, she operated out of Little Creek, Virginia during the next year as an underway training ship in Chesapeake Bay. She trained LST officers and crews in procedures of beaching, gunnery, ship handling, and tactics. In addition, she trained with Army tanks and equipment and carried out pontoon beaching exercises. During this period she completed three cruises for officers and 23 cruises for crews.

On 19 April 1945 LST-987 entered Portsmouth Navy Yard for a two-week overhaul; thence, after loading rolling stock and LCT-523, she sailed on 16 May for the Pacific. Arriving Pearl Harbor on 13 June, she unloaded equipment and embarked soldiers of the 545th Field Artillery. The LST then sailed for the western Pacific on 21 June. Steaming via the Marshalls and Marianas, she reached Leyte Gulf, Philippines on 15 July, debarked troops, and on the 16th reported for duty with ServRon 10. Between 26 and 29 July, LST-987 steamed into Subic Bay, Luzon. There she embarked units of the 479th Air Service Squadron with rolling stock and cargo, and on 1 August she sailed for Okinawa. She reached Hagushi on 6 August and, after discharging men and equipment at Ie Shima from 12 to 16 August, she sailed for the Philippines the 21st. Steaming via Subic Bay, she reached Leyte Gulf on 30 August.

Post-war activities, 1945-1949

Assigned to occupation operations, LST-987 steamed to Panay, Philippines on 6 September where she embarked troops of the 40th Infantry. Between 17 and 27 September she steamed to Inchon where she off-loaded equipment, thence she sailed to Pusan on 2 to 4 October and debarked troops. She returned to Inchon on 8 October, embarked 1,000 Japanese POWs, and sailed for Japan on 11 October. Arriving on 14 October, she debarked the Japanese and three days later got underway for the Philippines. She lost her port propeller on 18 October, but with assistance from LST-841 reached Subic on 23 October. LST-987 continued to support the lifting of occupation forces in the Far East during the remainder of the year, and runs carried her from the Sea of Japan to the East China Sea. Early in 1946 she returned to the United States from the western Pacific, and in May she was assigned duty as a Naval Reserve training ship. She decommissioned on 3 September 1946, but continued service training Naval Reserves; and for over three years operated under command of the Potomac Naval River Command.

Decommissioning

LST-987 entered the Atlantic Reserve Fleet at Green Cove Springs, Florida in May 1950. Named USS Millard County (LST-987) on 1 July 1955, she remained in her Florida berthing area until mid-1960. Her name was struck from the Naval Vessel Register on 1 June 1960.

In commercial service

In August 1961 she was sold to the German Navy for conversion into a battle damage repair ship (ARB). However, this conversion was never undertaken and she never saw commissioned service in the Bundesmarine. Struck from the German Naval List in early 1968, she was sold for scrap in November of that year.

Sold again in 1972 to Zandzuig & Transportbedrijf H.G. & G.D. Blomberg B. V. of Berkel en Rodenrijs, The Netherlands, flagged Panamanian. On 22 September 1972 she was docked on the railway at "de Merwede" shipyard in The Netherlands and conversion to trailing suction hopper dredge commenced. She was renamed Esperance III and subsequently dredged gravel in the North Sea. Resold in 1978 to Cdeco Maritime Construction Inc. of Wilmington, Delaware, she was reflagged U.S. Sold again in 1980 to American International Dredge Corporation. The vessel was resold in 1986 to B & B Dredging Corporation of Crystal River, Florida and renamed Columbus. She was sold again in 1996 to Proteus Co., Chicago, Illinois and is currently operated by B+B Dredging Company of Chicago, Illinois. She primarily performs maintenance dredging of federal navigation channels for the United States Army Corps of Engineers. Renamed Columbia in 2002. Sold to The Dutra Group of San Rafael, California in December 2009.

References

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.