USS Hesperia (AKS-13)

History
United States
Ordered:
  • as SS Sam Dale
  • EC2-S-C1 hull, MC hull 2825
Laid down: 9 October 1944
Launched: 18 November 1944
Commissioned: 1 April 1945
Decommissioned: 27 February 1947
Struck: date unknown
Fate: scrapped in 1973
General characteristics
Class and type: Acubens-class stores ship
Displacement: 4,023 t.(lt) 14,350 t.(fl)
Length: 441 ft 7 in (134.59 m)
Beam: 56 ft 11 in (17.35 m)
Draft: 27 ft 7 in (8.41 m)
Propulsion: reciprocating steam engine, single shaft, 2,500 hp (1,900 kW)
Speed: 11 knots (20 km/h)
Endurance: 17,000 miles
Complement: 195
Armament:

USS Hesperia (AKS-13) was an Acubens-class general stores issue ship commissioned by the U.S. Navy for service in World War II. She was responsible for delivering and disbursing goods and equipment to locations in the war zone.

Hesperia (AKS-13), built as the Liberty ship SS Sam Dale, was launched under Maritime Commission contract by Delta Shipbuilding Co., New Orleans, Louisiana, 18 November 1944; sponsored by Mrs. Marie Owen; converted to Navy use by Norfolk Naval Shipyard and commissioned 1 April 1945, Lt. Comdr. William G. Dutton in command.

World War II service

Following a period of training and shakedown, Hesperia loaded her cargo of general stores for the fleet and sailed 16 May 1945. Transiting the Panama Canal, she arrived Pearl Harbor 13 June 1945. The stores ship then proceeded to the western Pacific for the important job of supplying operating units with some of the thousands of items—from clothing to spare parts—necessary to a modern fighting ship.

She arrived Ulithi 6 July and after issuing stores to the ships present sailed with a convoy for Okinawa, site of the Pacific's largest amphibious assault just 3 months earlier. Hesperia anchored in Buckner Bay, Okinawa, 21 July and began issuing supplies of all kinds to the fleet and shore installations. She continued to function as a mobile supply base, interrupted only by occasional enemy air attacks, until after hostilities ended in mid-August. Having issued her entire stock the ship departed Okinawa 26 August for Manus. She arrived 7 September, loaded another full stock of replacement items, and sailed 22 September.

Surviving a dangerous typhoon

Hesperia encountered the great typhoon which had devastated Okinawa during her voyage to Korea, but after altering course temporarily continued to Jinsen, arriving 17 October. During the next month she serviced nearly 100 ships and small craft engaged in the Korean and Chinese occupations, operating from Jinsen, and later Taku, China. After this vital support duty, allowing the ships to remain on station for longer periods of time, she returned to Guam for a fresh issue 29 November 1945. Loading completed, she sailed 20 December to Yokosuka, Japan, and after her arrival 6 days later issued stores to over 500 ships and small craft and the shore activities connected with the occupation of Japan.

Post-war activity

Her job in Japan temporarily completed, Hesperia got underway 2 March 1946 for the United States, and arrived San Francisco, California, 30 March. During the next months she made two more voyages to supply the fleet, one to Pearl Harbor, the other to Pearl Harbor and Kwajalein.

Decommissioning

Returning to San Francisco 23 December 1946, she decommissioned 27 February 1947, was delivered to the Maritime Commission, and joined the National Defense Reserve Fleet. She was berthed at present at Suisun Bay, California. Final Disposition: she was scrapped in 1973.

Military awards and honors

Hesperia’s crew was eligible for the following medals:

References

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.