USS Chicago (1885)

USS Chicago in 1891
History
United States
Name:
  • Chicago (1885–1928)
  • Alton (1928–1936)
Namesake:
Ordered: 3 March 1883
Awarded: 26 July 1883
Builder: John Roach & Sons, Chester, Pennsylvania
Cost: $889,000 (contract price of hull and machinery)
Laid down: 29 December 1883
Launched: 5 December 1885
Sponsored by: Edith Cleborne
Commissioned: 17 April 1889
Decommissioned: 30 September 1923
Renamed: Alton 16 July 1928 and reclassified IX-5
Reclassified:
  • CA-14, 17 July 1921
  • CL-14, 8 August 1921
  • IX-5, 16 June 1928
Identification:
Fate:
  • sold 15 May 1936,
  • foundered (sunk) in Pacific July 1936
General characteristics (as built)
Type: Protected cruiser
Displacement: 4,500 long tons (4,600 t)
Length:
  • 342 ft 2 in (104.29 m) oa
  • 325 ft (99 m) pp
Beam: 48 ft 3 in (14.71 m)
Draft: 19 ft (5.8 m)
Installed power: 14 × 100 psi (690 kPa) coal-fired boilers
Propulsion:
Sail plan: Schooner
Speed: 14 kn (16 mph; 26 km/h)
Capacity: 830 short tons (750 t) of coal
Complement: 45 officers and 356 enlisted men
Armament:
Armor:
General characteristics (1895 & 1902 rebuild)
Displacement: 5,000 long tons (5,100 t)
Installed power:
Propulsion:
Speed: 18 knots (33 km/h; 21 mph) (Speed on Trial)
Armament:

The first USS Chicago (later CA-14) was a protected cruiser of the United States Navy, the largest of the original three authorized by Congress for the "New Navy". One of the U.S. Navy's first four steel ships.

She was launched on 5 December 1885 by John Roach & Sons of Chester, Pennsylvania, sponsored by Edith Cleborne (daughter of Navy Medical Director Cuthbert J. Cleborne) and commissioned on 17 April 1889, Captain Henry Bellows Robeson in command.

Design and construction

Chicago was ordered as part of the "ABCD" ships, the others being the cruisers Atlanta and Boston and the dispatch vessel Dolphin. These were the first steel-hulled ships of the "New Navy". All were ordered from the same shipyard, John Roach & Sons of Chester, Pennsylvania. However, when Secretary of the Navy William C. Whitney initially refused to accept Dolphin, claiming her design was defective, the Roach yard went bankrupt and Chicago's completion was delayed about three years while Roach reorganized as the Delaware River Iron Ship Building and Engine Works.[1][2] Like the other "ABCD" ships, Chicago was built with a sail rig to increase cruising range.

Chicago was built with a displacement of 4,500 long tons (4,600 t) at an overall length of 342 ft 2 in (104.29 m) and 325 ft (99 m) at the perpendiculars. Her beam was 48 ft 3 in (14.71 m) with a draft of 19 ft (5.8 m). She was had fourteen 100psi boilers that ran two compound overhead beam steam engines that producing 5,084 ihp (3,791 kW) to turn her two screws and achieve a speed of 14 kn (16 mph; 26 km/h). She was also rigged for sails in a Schooner configuration. Chicago was capable of carrying 830 short tons (750 t) of coal.[2]

Chicago's original armament consisted of four 8-inch (203 mm)/30 caliber Mark 2 guns,[3] eight 6-inch (152 mm)/30 caliber Mark 2 guns, two 5-inch (127 mm)/31 caliber Mark 1 guns,[4] two 6-pounder 57 mm (2.24 in) guns, four 3-pounder 47 mm (1.85 in) guns, two 1-pounder 37 mm (1.46 in) Hotchkiss revolver cannon, and two .45 caliber (11.4 mm) Gatling guns.

She had 4 in (100 mm) of armor on her gun shields, 1.5 in (38 mm) on her deck, and 3 in (76 mm) on her conning tower.[5]

Rebuilds and refits

In 1895–99 Chicago was refitted at the New York Navy Yard, with her main batteries replaced by four new 8-inch (203 mm)/35 caliber Mark 4 guns,[6] and with all secondary 6 inch and 5 inch guns replaced by fourteen new 5-inch (127 mm)/40 caliber Mark 3 guns.[7] She had her sails removed, boilers replaced by six Babcock & Wilcox and four cylindrical boilers, and engines replaced with two horizontal triple-expansion engines totaling 9,000 ihp (6,700 kW) for 18 kn (21 mph; 33 km/h) speed.[1][5] In 1902 she was partially reconstructed, with an extended armored deck and increased displacement of 5,000 long tons (5,100 t).[5] In 1915 as a training ship she was rearmed with twelve 4-inch (102 mm)/40 caliber guns,[8] and in 1918 as a flagship with four 5-inch (127 mm)/51 caliber guns. In 1920, as a submarine tender at Pearl Harbor, she was disarmed.

Service history

Pre-World War I

Illustration of one of Chicago's two original beam-propeller engines. Chicago was a twin-screw ship; a similar engine drove the screw on the other side of the vessel.

On 7 December 1889, Chicago departed Boston for Lisbon, Portugal, arriving on 21 December. The cruiser served in European and Mediterranean waters as the flagship of the Squadron of Evolution until 31 May 1890, when she sailed from Funchal, Madeira to call at Brazilian and West Indian ports before returning to New York on 29 July.

Chicago operated along the east coasts of North and South America and in the Caribbean as flagship of the Squadron of Evolution—and later as flagship of the North Atlantic Squadron—until 1893. After taking part in the International Naval Review in Hampton Roads in April, she left New York on 18 June 1893 to cruise in European and Mediterranean waters as flagship of the European station. During this period the ship was commanded by Alfred Thayer Mahan, already famous as a naval strategist. Chicago returned to New York on 20 March 1895, and was placed out of commission there on 1 May.

Recommissioned on 1 December 1898, Chicago made a short cruise in the Caribbean before sailing for the European Station on 18 April. She returned to New York on 27 September and participated in the naval parade and Dewey celebration of 2 October 1899. Chicago sailed from New York on 25 November for an extended cruise, as flagship of the South Atlantic Station until early July 1901, then as flagship of the European Station. With the squadron, she cruised in northern European, Mediterranean, and Caribbean waters until 1 August 1903, when she proceeded to Oyster Bay, New York, and the Presidential Review.

From 3 December 1903 – 15 August 1904, Chicago was out of commission at Boston undergoing repairs. After operating along the northeast coast, the cruiser departed Newport News on 17 November for Valparaíso, Chile, arriving on 28 December. There, on 1 January 1905, she relieved the armored cruiser New York as flagship of the Pacific Squadron and for three years operated off the west coasts of North and South America, in the Caribbean, and to Hawaii. In 1906, she played a key role in the evacuation of San Francisco during the 1906 San Francisco earthquake. Arriving from San Diego at 6pm on April 19, Chicago's radio allowed the city's leadership to communicate with the outside world, as telephone and telegraph lines were down.[9] A group of two officers and sixteen enlisted men from Chicago supervised waterborne evacuation efforts. The removal of 20,000 refugees to Tiburon in Marin County by this ship and numerous other vessels is said to be unparalleled and unsurpassed until the 1940 evacuation of Dunkirk.[10]

On 8 January 1908, Chicago departed San Diego for the east coast and in May joined the Naval Academy Practice Squadron for the summer cruise along the northeast coast until 27 August, when she went into reserve. Chicago was recommissioned the next summer (14 May-28 August 1909) to operate with the Practice Squadron along the east coast, then returned to Annapolis. On 4 January 1910, she left the Academy for Boston, arriving on 23 January. She then served "in commission in reserve" with the Massachusetts Naval Militia until 12 April 1916, and with the Pennsylvania Naval Militia from 26 April 1916 – April 1917.

World War I and beyond

On 6 April 1917, Chicago was placed in full commission at Philadelphia and reported to Submarine Force, Atlantic (COMSUBLANT) as flagship at New London, Connecticut, commanded by future Admiral Thomas C. Hart.[11] On 10 July 1919, she departed New York to join Cruiser Division 2 (CruDiv 2), as flagship in the Pacific. She was reclassified CA-14 in 1920 and then CL-14 in 1921. From December 1919 – September 1923, she served with SubDiv 14 and as tender at the Submarine Base, Pearl Harbor.

Chicago was decommissioned at Pearl Harbor on 30 September 1923; served as a receiving ship there until 1935; renamed Alton on 16 July 1928 and reclassified IX-5 to free the name for USS Chicago (CA-29); and sold on 15 May 1936. Alton foundered in mid-Pacific in July while being towed from Honolulu to San Francisco.

References

  1. 1 2 Gardiner, Robert; Chesneau, Roger (1979). Conway's All the World's Fighting Ships, 1860–1905. New York: Mayflower Books. p. 150. ISBN 0-8317-0302-4.
  2. 1 2 Friedman, Norman (1984). U.S. Cruisers: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 18–22, 457–458. ISBN 0-87021-718-6.
  3. DiGiulian, Tony, US 8"/30 guns at Navweaps.com
  4. DiGiulian, Tony, US 5"/31 guns at Navweaps.com
  5. 1 2 3 Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775–1990: Major Combatants. Westport, Connecticut: Greenwood Press. p. 141. ISBN 0-313-26202-0.
  6. DiGiulian, Tony, US 8"/35 and 8"/40 guns at Navweaps.com
  7. DiGiulian, Tony, US 5"/40 guns at Navweaps.com
  8. DiGiulian, Tony, US 4"/40 guns at Navweaps.com
  9. US National Archives, Prologue Magazine, Spring 2006, Vol. 38, No. 1, When an American City is Destroyed
  10. Timeline of the San Francisco Earthquake and Fire – 1906
  11. Biography of Thomas C. Hart at Naval History and Heritage Command

Bibliography

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.