USS Boreas (AF-8)

USS Boreas (AF-8) in October 1941
History
Name: USS Boreas
Builder: Moore Shipbuilding, Oakland, California
Launched: 1919, as SS Yaquina
Acquired: 6 December 1921
Commissioned: 6 August 1940
Decommissioned: 15 February 1946
Struck: 28 March 1946
Fate: Scrapped, 28 November 1947
General characteristics
Class and type: Arctic-class stores ship
Displacement:
  • 4,654 long tons (4,729 t) light
  • 11,570 long tons (11,760 t) full
Length: 416 ft 6 in (126.95 m)
Beam: 53 ft (16 m)
Draft: 26 ft 5 in (8.05 m)
Installed power: 2,800 shp (2,100 kW)
Propulsion:
Speed: 11 kn (13 mph; 20 km/h)
Complement: 267
Armament: 2 × 5 in (130 mm)/51 cal guns, 4 × 3 in (76 mm)/50 cal dual purpose guns, 8 × 20 mm anti-aircraft cannons

USS Boreas (AF-8) was an Arctic-class stores ship acquired by the United States Navy after World War I. She served with distinction during World War II, supplying food and other supplies to ships and installations in the combat zones of the Pacific Theater.

Early career

Boreas was built for the United States Shipping Board as SS Yaquina in 1919 at Oakland, California, by the Moore Shipbuilding Company; renamed Boreas on 29 October 1921; acquired by the Navy on 6 December 1921 and laid up in reserve at the Philadelphia Navy Yard; commissioned in ordinary on 6 August 1940; towed to the Todd-Robbins Dry Dock and Repair Co. in Brooklyn, New York, for reactivation; and placed in full commission on 24 March 1941, Commander George M. O'Rear in command.

In May 1941, The USS Boreas proceeded to the Chesapeake Bay-Hampton Roads area for calibration, shakedown and her first load. At that time there was a definite shortage of ships in the United States Navy and considerable construction work was in progress at various U.S. Naval bases. As a result, all the ship loads, with the exception of No. 2 Load, was loaded with construction equipment and material. Finally after a two- or three-day delay, the cargo for No. 2 Load had arrived - frozen turkeys from the state of Washington.

The USS Boreas started south on her first trip. A brief stop was made at Guantanamo Bay, Cuba, then through the Panama Canal, and finally docking in San Diego in California for another brief stop. Afterword, the USS Boreas set a course for Pearl Harbor in Hawaii. Upon her arrival, all construction equipment and material was unloaded and the USS Boreas then returned to San Diego. The total duration of the voyage took 57 days (9,337 miles). For the next few months, the USS Boreas operated as a shuttle service between these ports on the U.S. West Coast and Hawaii.

World War II

At the time of the attack on Pearl Harbor on 7 December 1941, the USS Boreas was in San Francisco. She would be the first provisions ship to arrive at the stricken naval base in Hawaii after the attack. The ship made ten round-trips between San Francisco and Pearl Harbor in 1942 hauling goods and material to rebuild and resupply the strategic naval base.

On 26 December 1942, Boreas departed San Francisco, bound for Nouméa, New Caledonia, and Espiritu Santo, to begin supplying advanced bases. Returning to Pearl Harbor or San Francisco to refill her holds with needed supplies, Boreas provisioned many of the major islands and bases in the Pacific including Samoa; Funafuti; Kwajalein; Eniwetok; Tulagi; Guadalcanal; Guam; Saipan; Iwo Jima; Okinawa; Manus; Ulithi; Efate; Tarawa; Makin; Christmas Island; and Auckland, New Zealand.

Boreas generally steamed alone, only occasionally rating a small escort, but the store ship never suffered damage and rarely even saw an enemy. Late in 1944, she salvaged cargo from Asphalt, a concrete storage barge that had grounded on a coral reef off Saipan during a severe storm.

Post-war career

Telegram from Secretary of the Navy James Forrestal announcing the surrender of Japan.

After the Japanese agreed to surrender on 15 August 1945, Boreas carried supplies to Okinawa to support occupation forces there. Later in the fall of 1945, she received orders to move on to Japan and provisioned Wakayama, Nagoya, Sasebo, and Kure from 20 October to 18 November when orders came sending her home. Boreas arrived at San Diego on 23 December.

A portion of the 188 ft. long homeward bound pennant from USS Boreas

The store ship steamed via the Panama Canal for the Norfolk Navy Yard, where she arrived on 19 January 1946. Boreas was decommissioned on 15 February, and her name was struck from the Naval Vessel Register on 28 March. Returned to the War Shipping Administration in July 1946, she was sold on 28 November 1947 to the Patapsco Steel Scrap Co. of Bethlehem, Pennsylvania, and scrapped.

References

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.