HGM-25A Titan I
Launch of a Titan I SM/567.8-90 ICBM from Cape Canaveral | |
Function | ICBM |
---|---|
Manufacturer | Martin Company |
Country of origin | United States |
Cost per launch | US$ 1.5 million (1962) |
Size | |
Height | 31 m |
Diameter | 3.05 m |
Mass | 105,140 kg |
Stages | 2 |
Launch history | |
Status | Retired |
Launch sites |
Cape Canaveral LC-15, LC-16, LC-19 & LC-20 Vandenberg AFB OSTF SLTF LC-395 |
Total launches | 70 |
Successes | 53 |
Failures | 17 |
First flight | 6 February 1959 |
Last flight | 5 March 1965 |
First stage | |
Engines | 1 LR87-AJ-3 |
Thrust | 1,900 kN (430,000 lbf) |
Specific impulse | 290 seconds |
Burn time | 140 seconds |
Fuel | RP-1/LOX |
Second stage | |
Engines | 1 LR91-AJ-3 |
Thrust | 356 kN (80,000 lbf) |
Specific impulse | 308 sec |
Burn time | 155 seconds |
Fuel | RP-1/LOX |
The Martin Marietta SM-68A/HGM-25A Titan I was the United States' first multistage Intercontinental ballistic missile (ICBM), in use from 1959 until 1965. Incorporating the latest design technology when designed and manufactured, the Titan I provided an additional nuclear deterrent to complement the U.S. Air Force's SM-65 Atlas missile. It was the first in a series of Titan rockets, but was unique among them in that it used liquid oxygen and RP-1 as propellants, while the later Titan ICBM versions all used storeable fuels instead. Though the SM-68A was operational for only three years, it was an important step in building the Air Force's strategic nuclear forces.
Origins
The program began in January 1955 when the Scientific Advisory Committee recommended an alternate approach to the ICBM.[1] In May 1955 the Air Material Command invited contractors to submit proposals and bids for the two stage alternate source ICBM. In September 1955 Martin was declared the contractor for the Titan missile. In early October the Air Force's Western Development Division was ordered to commence the Titan program.[1] The Titan was developed in parallel with the Atlas (SM-65/HGM-16) Intercontinental Ballistic Missile. The Air Force's goal in launching the Titan program was threefold: one, to serve as a backup should Atlas fail; two, to develop a large, two-stage missile with potentially superior performance; and third to introduce competition which the head of Ballistic Missile Division, Brigadier General Bernard Schriever, thought might spur the Atlas contractor to work harder[2] Martin was selected as the contractor for two reasons. First it proposed a superior organization.[3] Second was that Martin proposed a method of dealing with the problem of igniting a liquid fueled engine at high altitude.[4]
The Titan I was initially designated B-68 in the numbering sequence of bombers.[5] It was later designate SM-68; then in 1962 it was redesignated HGM-25A.
Program management
The previous strategic missile programs of the Air Force had been administered using the "single prime contractor concept" (later called the weapon system concept).[6] This had resulted in three badly botched programs; the programs of the Snark, Navaho and RASCAL missiles had slipped an average of 5 years and had cost overruns of 300 per cent or more.[7] The Teapot Committee had been created to evaluate requirements for, and methods of accelerating the development of ballistic missiles. Applying the Teapot committee's recommendations to manage ballistic missile programs the Air Research and Development Command established the Western Development Division and Brigadier General Bernard Schriever was detailed to command it. Schriever devised an entirely new organization for program management. The Air Force was to act as "prime contractor," the Ramo-Woolridge Corporation was contracted to provide systems engineering and technical direction of all ballistic missiles. The airframe contractor also would assemble the sub-systems provided by other Air Force contractors.[8] This new organization was very controversial.[9]
Budgetary problems
The Titan, proposed as a fallback in case the Atlas failed, was by December 1956 accepted as a "principal ingredient of the national ballistic missile force."[10] Almost from the beginning Titan was threatened with cancelation.[11] In response to claims that the Titan was redundant arguments were made that the Titan offered greater performance and growth potential than the Atlas. Suggestions were made that it could make a superior space launch vehicle.[12] The Titan program was under constant budgetary pressure. In the summer of 1957 budget cuts led Secretary of Defense Wilson to make major changes in the Titan production rate from the proposed seven per month to two a month, which effectively reduced the Titan to a research and development program.[13] On October 5, 1957 Americans woke to learn that the Soviet Union had put Sputnik, the first satellite, in orbit. The public and press were shocked. Americans suffered a crisis of confidence. The launch of Sputnik was often compared to Pearl Harbor.[14] The effect ended any talk of canceling Titan. Priority was restored.[15] 1958 saw increases in funding and plans for additional Titan squadrons.
Characteristics
Produced by the Glenn L. Martin Company (which became "The Martin Company" in 1957), Titan I was a two-stage, liquid-fueled missile with an effective range of 6,101 nautical miles (11,300 km). The first stage delivered 300,000 pounds (1,330 kN) of thrust, the second stage 80,000 pounds (356 kN). The fact that Titan I, like Atlas, burned RP-1 and LOX meant that the oxidizer had to be loaded onto the missile just before launch from an underground storage tank, and the missile raised above ground on the enormous elevator system, exposing the missile for some time before launch. The complexity of the system combined with its relatively slow reaction time – fifteen minutes to load, raise and launch the first missile, made it a less effective weapon system. Following the launch of the first missile the other two could be fired at 7-1/2 minute intervals.[16]
Titan I utilized radio-inertial command guidance. The inertial guidance system originally intended for the missile was instead eventually deployed in the Atlas E and F missiles.[17] Less than a year later the Air Force considered deploying the Titan I with an all-inertial guidance system but that change never occurred.[18] (The Atlas series was intended to be the first generation of American ICBMs and Titan II (as opposed to Titan I) was to be the second generation deployed). The Titan 1 was controlled by an autopilot which was informed of the missile's attitude by a rate gyro assembly consisting of 3 gyroscopes. During the first minute or two of the flight a pitch programmer put the missile on the correct path.[16] From that point the AN/GRW-5 guidance radar tracked a transmitter on the missile. The guidance radar fed missile position data to the AN/GSK-1 (Univac Athena) missile guidance computer in the Launch Control Center.[19] The guidance computer used the tracking data to generate instructions which were encoded and transmitted to the missile by the guidance radar. Guidance input/output between the guidance radar and guidance computer occurred 10 times a second.[20] Guidance commands continued for the stage 1 burn, the stage 2 burn and the vernier burn ensuring the missile was on the correct trajectory and terminating the vernier burn at the desired velocity. The last thing the guidance system did was to determine if the missile was on the right trajectory and pre-arm the warhead which then separated from the second stage.[16] In case of the failure of the guidance system at one site, the guidance system at another site could be used to guide the missiles of the site with the failure.[21]
Titan I also was the first true multi-stage (two or more stages) design. The Atlas missile had all three of its main rocket engines ignited at launch (two were jettisoned during flight) due to concerns about igniting rocket engines at high altitude and maintaining combustion stability.[22] Martin, in part, was selected as the contractor because it had "recognized the 'magnitude of the altitude of the altitude start problem' for the second stage and had a good suggestion for solving it."[4] Titan I's second-stage engines were reliable enough to be ignited at altitude, after separation from the first stage booster. The first stage, besides including heavy fuel tanks and engines, also had launch interface equipment and the launch pad thrust ring with it. When the first stage had finished consuming its propellant, it dropped away, thereby decreasing the mass of the vehicle. Titan I’s ability to jettison this mass prior to the ignition of the second stage meant that Titan I had a much greater total range (and a greater range per pound of second-stage fuel) than Atlas, even if the total fuel load of Atlas had been greater.
As North American Aviation's Rocketdyne Division was the only manufacturer of large liquid propellent rocket engines the Air Force Western Development Division decided to develop a second source for them. Aerojet-General was selected to design and manufacture the engines for the Titan. Aerojet produced the excellent LR87-AJ-3 (booster) and LR91-AJ-3 (sustainer). George P. Sutton wrote "Aerojet's most successful set of large LPRE was that for the booster and sustainer stages of the versions of the Titan vehicle".[23]
The warhead of the Titan I was an AVCO Mk 4 re-entry vehicle containing a W38 thermonuclear bomb with a yield of 3.75 megatons which was fuzed for either air burst or contact burst. The Mk 4 RV also deployed penetration aids in the form of mylar balloons which replicated the radar signature of the Mk 4 RV.[24]
Research and development
The Titan I was tested in a comprehensive test program prior to deployment. The testing consisted of Series I, which tested the first stage while Series III tested the complete missile (Series II had been cancelled).[25] From the first successful launch on 5 February 1959 with Titan-1 A3 through to 29 January 1962 Titan-1 M7. There were seven variants of the Titan I Research and Development missile: six A-types (four launched) seven B-types (two launched), six C-types (five launched), ten G-types (seven launched), 22 J-types (22 launched), four V-types (four launched), seven M-types (seven launched). 62 produced (49 launched and two exploded). They were tested and launched at Cape Canaveral Air Force Station from Launch Complexes LC15, LC16, LC19 and LC20.
The first four tests of the Titan I (the Lot A missiles) were carried out on February 6, February 25, April 3, and May 4, 1959, all with dummy second stages. The guidance system and stage separation all performed well, and aerodynamic drag was lower than anticipated. The success of these initial flights, which marked the first time a missile system had succeeded on its maiden launch, left launch crews unprepared for the coming events. On August 14, the first attempt to fly a Lot B (all-up version with a live second stage but dummy warhead) ended in disaster when the missile was released from LC-19 before it had built up sufficient thrust. Liftoff thus occurred 3.9 seconds earlier than intended, causing one of the pad umbilicals to be prematurely jerked free as the missile lifted. Another umbilical sent an automatic cutoff command and the Titan fell back onto the pad and exploded, causing extensive damage to LC-19. The pad was not used again for six months.[26]
On December 12, the second attempt to launch a complete Titan (Missile C-2) took place at LC-16. One pad umbilical failed to detach at ignition, and an automatic shutoff signal terminated thrust before the missile could be released by the launcher mechanism. Ground crews quickly repaired the umbilical, and a second launch attempt was made two days later. Their relief at having avoided certain disaster on December 12 was short-lived when the Titan exploded almost as soon as it was released by the launcher mechanism. The mishap was quickly traced to the Range Safety destruct charges on the first stage inadvertently going off, as Martin technicians had moved the activator relay into a vibration-prone area during repair work on the missile. Testing confirmed that the shock from the pad hold-down bolts firing was enough to set off the relay. Because the RSO charges had spilled out the propellants and minimized mixing of them, the explosion was not as powerful as that of Titan B-5, and so damage to LC-16 was less extensive. The pad was repaired in only two months.[27] On February 2, 1960, LC-19 returned to action as Missile B-7 marked the first successful flight of a Titan with a live upper stage. On February 5, LC-16 returned to action by hosting Missile C-4. The second attempt at a Lot C Titan failed at T+52 seconds when the guidance compartment collapsed, causing the RVX-3 reentry vehicle to separate.[28] The missile pitched down and the first stage LOX tank ruptured from aerodynamic loads, blowing the stage to pieces. After the first stage destroyed itself, the second stage separated and began engine ignition, sensing that normal staging had taken place. With no attitude control, it began tumbling end-over-end and quickly lost thrust. The stage plummeted into the Atlantic Ocean some 30–40 miles downrange. After the successful flight of Missile G-4 on February 24, Missile C-1's second stage failed to ignite on March 8 due to a stuck valve preventing the gas generator from starting.[29] On July 1, the newly opened LC-20 hosted its first launch when Missile J-2, an operational prototype, was flown. Unfortunately, a broken hydraulic line caused the Titan's engines to gimbal hard left almost as soon as the tower was cleared.[30] The missile pitched over and flew onto a near-horizontal plane when Range Safety sent the destruct command at T+11 seconds. The burning remains of the Titan impacted 300 meters from the pad in an enormous fireball. The piece of plumbing responsible for the missile failure was retrieved—it had popped out of its sleeve resulting in loss of first stage hydraulic pressure. The sleeve was not tight enough to hold the hydraulic line in place, and the pressure being imparted into it at liftoff was enough to pop it loose. Examination of other Titan missiles found more defective hydraulic lines, and the Missile J-2 debacle caused a wholesale review of manufacturing processes and improved parts testing.[31]
The next launch at the end of the month (Missile J-4) suffered premature first stage shutdown and landed far short of its planned impact point. Cause of the failure was a LOX valve closing prematurely, which resulted in the rupture of a propellant duct and thrust termination. Missile J-6 on October 24 set a record by flying 6100 miles.
The string of failures during 1959-60 led to complaints from the Air Force that Martin-Marietta weren't taking the Titan project seriously (since it was just a backup to the primary Atlas ICBM program) and displayed an indifferent, careless attitude that resulted in easily avoidable failure modes such as Missile C-3's range safety command destruct system relays being placed in a vibration-prone area.[32][33]
In December, Missile V-2 was undergoing a flight readiness test in a silo at Vandenberg Air Force Base. The plan was to load the missile with propellant, raise it up to firing position, and then lower it back into the silo. Unfortunately, the silo elevator collapsed, causing the Titan to fall back down and explode. The blast was so violent that it ejected a service tower from inside the silo and launched it some distance into the air before coming back down.[34]
A total of 21 Titan I launches took place during 1961, with five failures. On January 20, 1961, Missile AJ-10 launched from LC-19 at CCAS. The flight ended in failure when an improper disconnect of a pad umbilical caused an electrical short in the second stage. The Titan performed well through the first stage burn, but after second stage separation, the fuel valve to the gas generator failed to open, preventing engine start. Missiles AJ-12 and AJ-15 in March were lost due to turbopump problems. Missile M-1's second stage lost thrust when the hydraulic pump failed. Missile SM-2 experienced early first stage shutdown; although the second stage burn was successful, it had to run to propellant depletion instead of a timed cutoff. The added stress of this operation apparently resulted in a failure of either the gas generator or turbopump, as the vernier solo phase ended prematurely. Missile M-6's second stage failed to start when an electrical relay malfunctioned and reset the ignition timer.
With attention shifting to the Titan II, there were only six Titan I flights during 1962, with one failure, when Missile SM-4 (January 21) experienced an electrical short in the second stage hydraulic acutator, which gimbaled hard left at T+98 seconds. Staging was performed successfully, but the second stage engine failed to start.
Twelve more Titan Is were flown in 1963-65, with the finale being Missile SM-33, flown on March 5, 1965. The only failure in this last stretch of flights was when Missile V-4 (May 1, 1963) suffered a stuck gas generator valve and loss of engine thrust at liftoff. The Titan fell over and exploded on impact with the ground.[35]
Although most of the Titan I's teething problems were worked out by 1961, the missile was already eclipsed not only by the Atlas, but by its own designated successor, the Titan II, a bigger, more powerful ICBM with storable hypergolic propellant. The launch pads at Cape Canaveral were quickly converted for the new vehicle and as Vandenberg lacked actual pads (only silos), the Titan I quickly found itself homeless. After a brief period as an operational ICBM, it was retired from service in 1965 when Defense Secretary Robert McNamara made the decision to phase out all first generation cryogenically-fueled missiles in favor of newer hypergolic and solid-fueled models. While decommissioned Atlas (and later Titan II) missiles were recycled and utilized for space launches, the Titan I inventory was simply scrapped.[36]
Operational deployment
Titan-1 Strategic Missile (SM) production began during the final stages of the Research and Development program. A "Blue Suit" launch of SM-2 from Vandenberg AFB LC-395-A3 on 21 January 1962, the last development flight of M7 was from Cape Canaveral's LC-19 on 29 January 1962.[37] In total, 101 Titan-1 SMs were produced to be tested from underground silos at Vandenberg Air Force Base or stationed in silos in six squadrons of nine missiles each across Western America. Fifty-four missiles in silos in total, with one missile as a spare on standby at each squadron, bringing to 60 in service at any one time.
Titan was originally planned for a 1 X 10 (one control center with 10 launchers) "soft" site.[38] In mid-1958 it was decided that the American Bosh Arma all-inertial guidance system designed for Titan would, because production was insufficient, be assigned to Atlas and the Titan would switch to radio-inertial guidance.[39] The decision was made to deploy Titan squadrons in a "hardened" 3 X 3 (3 sites with one control center and 3 silos each) to reduce the number of guidance systems required.[38] (radio-inertial guided Atlas D squadrons were similarly sited).[40] The Titan I was first American ICBM based in underground silos, and it gave USAF managers, contractors and missile crews valuable experience building and working in vast complexes containing everything the missiles and crews needed for operation and survival. The complexes were composed of an Entry Portal, Control Center, Powerhouse, Terminal Room, two Antenna Silos for the ATHENA guidance radar antennas, and three launchers each composed of: three Equipment Terminals, three Propellant Terminals, and three missile Silos. All connected by an extensive network of Tunnels.[41] Both Antenna Terminals and all three Launchers were isolated with double door Blast Locks to ensure that if there was an explosion or the site was under attack, that only the exposed antenna and/or missile silo would be damaged.[42]
The Launch Crew was composed of a missile combat crew commander, missile launch officer (MLO), guidance electronics officer (GEO), Ballistic Missile analyst technician (BMAT), and two electrical power production technicians (EPPT).[43] There were also a cook and two Air Police.[44] During normal duty hours there was a Site Commander, Site Maintenance Officer, Site Chief, job controller/expediter, tool crib operator, power house chief, three pad chiefs, three assistant pad chiefs, another cook and more air police. There could be a number of electricians, plumbers, power production technicians, air conditioning technicians, and other specialist when maintenance was being performed.[44]
These early silos, however, had certain drawbacks. First, the missiles took about 15 minutes to fuel, and then, one at a time, had to be lifted to the surface on huge elevators for launching, which slowed their reaction time. Rapid launching was crucial to avoid possible destruction by incoming missiles, even though Titan complexes were designed to withstand nearby nuclear blasts. The missiles sites of a squadron were placed at least 17 (usually 20 to 30) miles apart so that a single nuclear weapon could not take out two sites.[45] The sites also had to be close enough that if a sites guidance system failed it could "handover" its missiles to another site of the squadron.[46][47]
The distance between the antenna silos and the most distant missile silo was between 1,000 and 1,300 feet (400 m). These were by far the most complex, extensive and expensive missile launch facilities ever deployed by the USAF.[48][49][50] Launching a missile required fueling it in its silo, and then raising the launcher and missile out of the silo on a massive elevator. Before each launch the guidance radar, which was periodically calibrated by acquiring a special target at a precisely known range and bearing,[51] had to acquire a radio on the missile (missile guidance set AN/DRW-18, AN/DRW-19, AN/DRW-20, AN/DRW-21, or AN/DRW-22.[52][53] When the missile was launched, the guidance radar tracked the missile and supplied precise velocity range and azimuth data to the guidance computer which then generated guidance corrections which were transmitted to the missile. Because of this the complex could only launch and track one missile at a time.
Although Titan I's two stages gave it true intercontinental range and foreshadowed future multistage rockets, its propellants were dangerous and hard to handle. Super-chilled liquid oxygen oxidizer had to be pumped aboard the missile just before launch, and complex equipment was required to store and move this liquid. RP-1 fuel also was pumped aboard just before launch.
In its brief career, six squadrons were equipped with the Titan I. Each squadron was deployed in a 3x3 configuration, which meant a total of nine missiles were divided into three launch sites in Colorado, Idaho, California, Washington state and South Dakota. Each missile site had three Titan I ICBM missiles ready to launch at any given time. See squadron article for location of launch sites.
- 568th Strategic Missile Squadron April 1961 – March 1965
- 569th Strategic Missile Squadron June 1961 – March 1965
- 724th Strategic Missile Squadron April 1961 – June 1965
- 725th Strategic Missile Squadron April 1961 – June 1965
- 850th Strategic Missile Squadron June 1960 – March 1965
- 851st Strategic Missile Squadron February 1961 – March 1965
Specifications
- Liftoff thrust: 1,296 kN Total mass: 105,142 kg
- Core diameter: 3.1 m. Total length: 31.0 m
- Development cost: $1,643,300,000 in 1960 dollars.
- Flyaway cost: $1,500,000 each, in 1962 dollars.
- Total production missiles built: 163 Titan 1s; 62 R&D Missiles – 49 launched & 101 Strategic Missiles (SMs) – 17 launched.
- Total deployed Strategic Missiles: 54.
- Titan Base Cost: $170,000,000 (US$ 1.38 in 2017)[54]
First Stage:
- Gross mass: 76,203 kg
- Empty mass: 4,000 kg
- Thrust (vac): 1,467 kN
- Isp (vac): 290 s (2.84 kN·s/kg)
- Isp (sea level): 256 s (2.51 kN·s/kg)
- Burn time: 138 s
- Diameter: 3.1 m
- Span: 3.1 m
- Length: 16.0 m
- Propellants: liquid oxygen (LOX)/kerosene
- Number of engines: Two – Aerojet LR87-3
Second Stage:
- Gross mass: 28,939 kg
- Empty mass: 1,725 kg
- Thrust (vac):356 kN
- Isp (vac): 308 s (3.02 kN·s/kg)
- Isp (sea level): 210 s (2.06 kN·s/kg)
- Burn time: 225 s
- Diameter: 2.3 m
- Span: 2.3 m
- Length: 9.8 m
- Propellants: liquid oxygen (LOX)/kerosene
- Number of engines: One – Aerojet LR91-3
Service history
The number of Titan I missiles in service, by year:
- 1961 – 1
- 1962 – 62
- 1963 – 63
- 1964 – 56
Retirement
When the storable-fueled Titan II and the solid-fueled Minuteman I were deployed in 1963, the Titan I and Atlas missiles became obsolete. They were retired from service as ICBMs in early 1965. The count as of 5 March 1965 (the final launch from Vandenberg Air Force Base (VAFB): 17 were launched from VAFB (September 1961 – March 1965); one was destroyed in Beale AFB Site 851-C1 silo explosion 24 May 1962; 54 were based in Silos with SAC by 20 January 1965; 29 were in storage SBAMA (three at VAFB, one at each Base, including an extra at Lowry = 9 and 20 in storage at SBAMA elsewhere), a total of 101 production SM vehicles. The 83 surplus missiles remained in inventory at Mira Loma AFS. SM-65 Atlas missiles had already been converted to satellite launchers in the early 1960s, and the Titan I's had about the same payload capacity as an Atlas. It did not make economic sense to refurbish the 83 remaining missiles as launch vehicles. About 33 were distributed to museums, parks and schools as static displays (see list below). The remaining 50 missiles were scrapped at Mira Loma AFS near San Bernardino, CA, the last was broken up in 1972, in accordance with the SALT-I Treaty of 1 February 1972.
The official count is 101 Titan I Strategic Missiles produced: 17 Test launched, 1 lost, 50 destroyed Mira Loma, 33 at museum/display (some missing).
There were attempts to find new uses for 15 of the Titan I complexes.[55] In early 1965 the San Bernardino Air Material Area devised means of preserving installed material.[56] By November 1965 the Air Force Logistics Command had determined that the cost of modifying the widely dispersed sites was prohibitive.[57] By Spring 1966 a number of possible uses and users had been identified. By May 6, 1966 the Air Force wanted to retain 5 Titan sites and the General Services Administration had earmarked 1 for possible use. The USAF removed equipment it had uses for, the rest was offered to other government agencies.[58] Eventually no sites were retained and all were salvaged. The chosen method was the Service and Salvage contract. This required the contractor removed the equipment the government wanted. Then the contractor was allowed to scrap any thing it wanted from what was left.[59] This accounts for the varied degree of salvage at the sites today. Most are sealed today, one in Colorado is easily entered also very unsafe.[60] One is open for tours.[61]
Most of the ATHENA guidance computers were given to universities. One is in the Smithsonian. One remained in use at Vandenberg AFB until it guided a last Thor-Agena launch in May 1972. It had guided over 400 missiles.[62]
On 6 September 1985 Strategic Defense Initiative (AKA "Star Wars" program), a scrapped Titan I Second Stage was used in a Missile Defense test. The MIRACL Near Infrared Laser, at White Sands Missile Range, NM was fired at a stationary Titan I second stage that was fixed to ground. The second stage burst and was destroyed by the laser blast. The second stage did not contain any fuel or oxidizer. It was pressurized with nitrogen gas to 60-psi. A follow-up test 6 days later was conducted on a scrapped Thor IRBM, its remnants reside at the SLC-10 Museum at Vandenberg AFB.
- Titan-I ICBM SM vehicles being destroyed at Mira Loma AFS for the SALT-1 Treaty
- Titan-I ICBM SM vehicles being destroyed at Mira Loma AFS for the SALT-1 Treaty
- Titan-I ICBM SM vehicles being destroyed at Mira Loma AFS for the SALT-1 Treaty
Static displays and articles
There should be 33 Static Titan 1 Strategic Missiles and two (plus five possible) Research and Development Missiles to account for (of these 22 have been positively identified by Serial Number, eight known but need to be identified) and three are unaccounted for, missing.
- B2 57-2691 Cape Canaveral Air Force Space & Missile Museum, Florida Horizontal
Note: May have been at the 14th American Rocket Society meeting at a Wash, DC hotel on 1 Nov 59
- R&D (57–2743) Colorado State Capitol display 1959 (SN belongs to a Bomarc) Vertical
- R&D ? City of Lompoc, Lompoc Park (may have been V3 or BH) see below as possible SM. was Vertical, destroyed.
- R&D (1 of 2, poss. 6) Was at Patrick AFB Technical Laboratory, Satellite Beach, Florida. Vertical (destr. by Hurr. Erin 8/95)
then at Charlie Bell’s junkyard on US-1 Titusville, Fla., now Puerto Rico? (see below)
- R&D G-type Science and Technology Museum, Chicago 21 June 1963 Vertical
- SM-5 60-3650 Was on display at VAFB Armed Forces Day 1962, is this the Lompoc static? Horizontal
- SM-49 60-3694 Cordele, Georgia (west side of Route I-75). Vertical
- SM-53 60-3698 Site 395-C Museum, Vandenberg AFB, Lompoc, Ca. (from March AFB) Horizontal
- SM-54 60-3699 Strategic Air Command & Aerospace Museum, Ashland, Nebraska. Vertical
- SM-61 60-3706 Gotte Park, Kimball, NE (only first stage standing, damaged by winds in ’96?) Vertical (damaged by winds 7/94 ?)
- SM-63 60-3708 In storage at Edwards AFB (still there?) Horizontal
- SM-65 61-4492 NASA Ames Research Center, Mountain View, California. Horizontal
- SM-67 61-4494 Titusville High School, Titusville, Florida (on Route US-1) removed was Horizontal
- SM-69 61-4496 (full missile) U.S. Space & Rocket Center (formerly Alabama Space and Rocket Center), Huntsville (stored outside, far west corner of center) Horizontal (in trees)This missile has been transferred to Discovery Park of America in Union City, Tennessee.It has been restored to correct external appearance and is now vertically displayed on the grounds.Its upper stage engine was also restored and on display.
- SM-70 61-4497 Veterans Home, Quincy, IL Vertical (removed sent to DMAFB for destruction on May, 2010)
- SM-71 61-4498 U.S. Air Force Museum, now AMARC (to go to PIMA Mus.) Horizontal
- SM-72 61-4499 Florence Regional Airport Air and Space Museum, Florence, South Carolina. Horizontal
- SM-73 61-4500 former Holiday Motor Lodge, San Bernardino (now missing?). Horizontal
- SM-79 61-4506 former Oklahoma State Fair Grounds, Oklahoma City, Oklahoma. 1960s Horizontal
- SM-81 61-4508 Kansas Cosmosphere, Hutchinson, Kansas. In storage
- SM-86 61-4513 Beale AFB (not on display, was horizontal, removed 1994) Horizontal
- SM-88 61-4515 (st. 1) Pima Air & Space Museum, outside DM AFB, Tucson, Arizona, now WPAFB Horizontal
- SM-89 61-4516 (st. 2) Pima Air Museum, outside DM AFB, Tucson, Arizona, now WPAFB Horizontal
- SM-92 61-4519 (st. 1) Kansas Cosmosphere, Hutchinson, Kansas. (acq. 11/93 from MCDD) Vertical (st 1 mate to SM-94 st 1)
- SM-93 61-4520 (st. 2) SLC-10 Museum, Vandenberg AFB, Lompoc, Ca. Horizontal (only stage 2)
- SM-94 61-4521 (st. 1) Kansas Cosmosphere, Hutchinson, Kansas. (acq. 6/93 from MCDD) Vertical (st 1 mate to SM-92 st 1)
- SM-96 61-4523 South Dakota Air and Space Museum, Ellsworth AFB, Rapid City, South Dakota. Horizontal
- SM-101 61-4528 Estrella Warbirds Museum, Paso Robles, CA (2nd stage damaged) Horizontal
- SM- ? ? (full missile) Ingram Park, town of Lompoc, Ca. (with a Nike Target Warhead) was vertical, destroyed
- SM- ? ? (stg. 2 only) former SDI laser test target (whereabouts?) is this 4519 & or 4521 stg 1? Horizontal (remnants of stage 1)
- SM- ? ? (stg. 1 only) former Spaceport USA Rocket Garden, Kennedy Space Center, Florida. Vert. (stg 1 mated to stg 1 below)
- SM- ? ? (stg. 1 only) former Spaceport USA Rocket Garden, Kennedy Space Center, Florida. Vert. (stg 1 mated to stg 1 above)
- SM- ? ? (stg. 1 only) Science Museum, Bayamon, Puerto Rico (PAFB R&D/Bell’s ??) Vert. (stg 1 mated to stg 1 below)
- SM- ? ? (stg. 1 only) Science Museum, Bayamon, Puerto Rico (top half from Bell’s Junkyard) Vert. (stg 1 mated to stg 1 above)
- SM- ? ? (full missile) former Outside main gate of White Sands Missile Range, N.M. false report? Vertical
- SM- ? ? (full missile) Spacetec CCAFS Horizontal
Note: Two stacked Titan-1 first stages created a perfect illusion of a Titan-2 Missile for museums above.
Prospective manned flights
The Titan I was considered for use as the first missile to put a man in space. Two of the firms responding to an Air Force "Request for Proposal" for "Project 7969," an early USAF project to "Put a Man in Space Soonest (MISS)". Two of the four firms which responded, Martin and Avco, proposed using Titan I as the booster.[63][64]
See also
Wikimedia Commons has media related to Titan (Rocket). |
- LGM-25C Titan II
- List of military aircraft of the United States
- List of missiles
- SM-65 Atlas
- Titan (rocket family)
References
- 1 2 Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. vi.
- ↑ Green Warren E. The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Green Warren E., 1962, AFSC Historical Publications Series 62-23-1, p. 11.
- ↑ Green Warren E. The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 17.
- 1 2 Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 17.
- ↑ "Titan Missile". Strategic-Air-Command.com. Retrieved 2016-02-06.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 3.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 4.
- ↑ Sheehan, Neil 2009, A Fiery Peace in a Cold War Bernard Schriever and the Ultimate Weapon, NewYork: Vintage Books, 2009, pgs. 233-234.
- ↑ Sheehan, Neil 2009, A Fiery Peace in a Cold War Bernard Schriever and the Ultimate Weapon, NewYork: Vintage Books, 2009, pgs. 255-257.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 36.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 37.
- ↑ Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 37.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 41.
- ↑ Divine,Robert A. 1993, The Sputnik Challenge, New York: Oxford University Press, 1990, ISBN 0-19-505008-8, p. xv.
- ↑ Divine, Robert A., The Sputnik Challenge, New York: Oxford University Press, 1990, ISBN 0-19-505008-8, p. xv.
- 1 2 3 Hoselton, Gary A., Titan I Guidance System, Brekenridge, Colorado: Association of Air Force Missileers, Volume 6, Number 1998, p. 4.
- ↑ Guidance Changes Made on Atlas, Titan, Aviation Week July 28, 1958, page 22
- ↑ Titan Guidance Switch, Aviation Week April 6, 195, page 31
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, paragraph 1-159 - 1-161
- ↑ Hoselton, Gary A., Titan I Guidance System, Brekenridge, Colorado: Association of Air Force Missileers, Volume 6, Number 1, 1998, p. 5.
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, paragraph 1-173
- ↑ Walker,Chuck, Atlas The Ultimate Weapon, Burlington Canada: Apogee Books, 2005, ISBN 0-517-56904-3, p. 11
- ↑ Sutton, George P, History of Liquid Propellent Rocket Engines, Reston Virginia: American Institute of Aeronautics and Astronautics, 2006, ISBN 1-56347-649-5, p. 380
- ↑ Hansen, Chuck, Swords of Armageddon, 1995, Chukelea Publications, Sunnyvale, California, page Volume VII Page 293
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 91.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 93.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 94.
- ↑ Green Warren E. 1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 94.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 95.
- ↑ Green Warren E.1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 96.
- ↑ https://archive.org/stream/NASA_NTRS_Archive_19730015128/NASA_NTRS_Archive_19730015128_djvu.txt
- ↑ Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 94.
- ↑ Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 128.
- ↑ See, Earl , Titan Missile Memoirs, Huntington Beach, California: American Aviation Historical Society Journal, Summer 2014, p. 118.
- ↑ http://www.chromehooves.net/documents/martin/titan_i_firing_history/01_-_titan_i_firing_history_ocr.pdf
- ↑ http://astronautix.com/lvs/titan1.htm
- ↑ "List of Titan Launches". Johnathan's Space Report Launch Vehicle Database. Retrieved 2015-02-13.
- 1 2 Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 54.
- ↑ Guidance Changes Made on Atlas, Titan, Aviation Week, July 28, 1958, page 22
- ↑ Walker,Chuck Atlas The Ultimate Weapon, Burlington Canada: Apogee Books, 2005, ISBN 0-517-56904-3, p. 154
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, Figure 1-4
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, Figure 1-35
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, paragraph 7-4
- 1 2 Simpson, Charles G, The Titan I part 2, Breckenridge, Colorado: Association of Air Force Missileers, October 1993, p. 5.
- ↑ Green Warren E..1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 85.
- ↑ Hoselton, Gary A., Titan I Guidance System, Brekenridge, Colorado: Association of Air Force Missileers, Volume 6, Number 1998, p. 6.
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, page 3-100
- ↑ Simpson, Charles G, The Titan I part 1, Breckenridge, Colorado: ssociation of Air Force Missileers, July 1993, p. 3.
- ↑ Green Warren E., 1962, The Development of the SM-68 Titan, Wright-Patterson Air Force Base: Air Force Systems Command, 1962, AFSC Historical Publications Series 62-23-1, p. 77.
- ↑ Kaplan, Albert B. and Keyes, Lt. Colonel George W.1962 Lowry Area History 29 September 1958 - December 1961, U.S. Army Corps of Engineers Ballistic Missile Construction Office (CEBMCO), 1962, pg. 4.
- ↑ Hoselton, Gary A., Titan I Guidance System, Brekenridge, Colorado: Association of Air Force Missileers, Volume 6, Number 1998, p. 7.
- ↑ Hoselton, Gary A., Titan I Guidance System, Brekenridge, Colorado: Association of Air Force Missileers, Volume 6, Number 1998, p. 5.
- ↑ United States Air Force, The T.O. 21M-HGM25A-1-1 Technical Manual Operation and Organizational Maintenance HGM-25A Missile Weapon System, United States Air Force, 1964, paragraph 1-159
- ↑ missilebases.com (2011). "History of Missile Bases". missilebases.com. Retrieved 4 September 2011.
- ↑ Clemmer, Wilbur E..1966, Phase-Out of the Atlas E and F and Titan I Weapon Systems, Wright-Patterson Air Force Base: Historical Research Division Air Force Logistics Command, 1962, p. 27.
- ↑ Clemmer, Wilbur E..1966, Phase-Out of the Atlas E and F and Titan I Weapon Systems, Wright-Patterson Air Force Base: Historical Research Division Air Force Logistics Command, 1962, p. 26.
- ↑ Clemmer, Wilbur E..1966, Phase-Out of the Atlas E and F and Titan I Weapon Systems, Wright-Patterson Air Force Base: Historical Research Division Air Force Logistics Command, 1962, p. 28.
- ↑ Clemmer, Wilbur E..1966, Phase-Out of the Atlas E and F and Titan I Weapon Systems, Wright-Patterson Air Force Base: Historical Research Division Air Force Logistics Command, 1962, p. 31.
- ↑ Clemmer, Wilbur E..1966, Phase-Out of the Atlas E and F and Titan I Weapon Systems, Wright-Patterson Air Force Base: Historical Research Division Air Force Logistics Command, 1962, p. 49.
- ↑ "Abandoned Titan I Missile Base - CO". YouTube. Retrieved 2016-02-14.
- ↑ "The Hotchkiss Titan I ICBM Missile Base". Bari Hotchkiss. Retrieved 2016-02-14.
- ↑ Shufelt, Wayne (17 October 1972). "Univac Athena computer" (PDF) (Letter). Letter to Dr. Uta Merzbach. Retrieved 2016-02-14.
- ↑ "Avco Project 7969s". Encyclopedia Astronautica=. Retrieved 2016-02-17.
- ↑ "Martin Project 7969s". Encyclopedia Astronautica=. Retrieved 2016-02-17.
External links
- Tri-City Herald article by Kristin Alexander about Titan 1 complexes in Washington State. Published March 22, 1998.
- Information on "Northern California Triad" of Titan missile bases in Lincoln, California; Chico, California and Live Oak, Sutter County, California (Sutter Buttes)
- Titan 1 Upgrade Project at NASA Moffett Field
- A site for the Univac Athena Missile Guidance Computer
- The most comprehensive site about Titan I bases