Tehran Metro

Tehran Metro

Top: Shush Metro Station entrance on Line 1.
Bottom: A train at the Shahr-e-Rey Metro Station
Overview
Native name متروی تهران
Locale Tehran, Iran
Transit type Rapid transit/metro (Lines 1–4, 7)
Commuter rail (Line 5)
Number of lines 6
Number of stations 105 (metro)
113 (total)[1]
Daily ridership 4.8 million[2]
Annual ridership 900 million (2016)[3]
Website Tehran Urban & Suburban Railway
Operation
Began operation 1999
Operator(s) Tehran Urban and Suburban Railway Company (TUSRC)
Number of vehicles 1,258[4]
Technical
System length 157 km (98 mi) (metro)
200 km (120 mi) (total)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
System map


The Tehran Metro (Persian: متروی تهران, Metro-ye Tehrān) is a rapid transit system serving Tehran, the capital of Iran. The system consists of four operational metro lines (and a fifth commuter rail line), with construction under way on a further two lines.

The Tehran Metro carries more than 2 million passengers a day.[5] In 2014, 815 million trips were made on Tehran Metro. As of 2015, the total system was 200 kilometers (120 mi) long,[6] 157 kilometers (98 mi) of which is metro-grade rail. It is planned to have a length of 430 kilometers (270 mi) with 9 lines once all construction is complete by 2020.[7]

On all days of the week, the Metro service runs from approximately 05:30 to 23:00.

The line uses standard gauge and is mostly underground. Ticket price is 1000 Iranian Toman for each journey (about USD 40¢), regardless of the distance traveled, but using prepaid tickets costs much less. Seniors may travel for free on the metro. On all Tehran metro trains the first, the second, and the last carriages are reserved for women who do not wish to ride with men in the same car. Women can still ride other cars freely.[8][9]

History

CRV Type DKZ2 Cars in the Tehran Metro.
CRV Type DKZ3 Cars in the Tehran Metro.

The initial plans of the Tehran Metro, which was to be Iran's first metro system, were laid out before the Iranian revolution in the 1970s. In 1970 the Plan and Budget Organization and the Municipality of Tehran announced an international tender for construction of a metro in Tehran. The French company SOFRETU, affiliated with the state-owned Paris transportation authority RATP, won the tender and in the same year began to conduct preliminary studies on the project. In 1974 a final report with a so-called "street-metro" proposal was tendered. The street-metro system recommended a road network with a loop express way in the central area and two highways for new urban areas and an 8-line metro network which were complemented by bus network and taxi services. Geological surveys commenced in 1976. In 1978 construction on the line was started in northern Tehran by the French company, however this development was short-lived with the advent of the Iranian Revolution and Iran–Iraq War in 1979 and 1980 respectively. SOFRETU ceased operations in Iran in December 1980. On March 3, 1982, the Iranian Cabinet ministers formally announced the stop of Tehran Metro operations by the French company.

In 1985, the "Tehran Metro Execution Plan" was re-approved by the Majles, the Iranian Parliament, on the basis of legal project of "Amendment of Law of Establishment of Tehran Urban and suburban Railway Company" which had been founded on Farvardin 1364 (April 1985). This was a literal continuation of exactly the same project that had been laid out before the revolution. Work proceeded slowly due to the continuing Iran–Iraq War and often ground to a halt.

By the summer of 1985, urban pressure from the rapidly urbanising population, and lack of developed public transport system prompted the work to be resumed in earnest. "Line 1" (From Blvd. Shahid Ayatollah Haghani to City of Rey) and its extension to Behesht-e-Zahra Cemetery was made a priority. "Line 2" (From Dardasht in Tehran Pars district to Sadeghiyeh Second Square) and an extending towards the City of Karaj and Mehrshahr district was also made a secondary priority. Studies were also made to establish the previously designed Lines 3 and 4. It was decided that an organisation by the name of the Metro Company should be established in order to handle the future development of the system.

Following this phase, the Metro Company was managed by Asghar Ebrahimi Asl for eleven years. During this time, hundreds of millions of dollars were spent on the system and the Metro Company was given government concessions for the exploitation of iron ore mines in Bandar Abbas (Hormuzgan Province), exploitation and sale of Moghan Diotomite mine in Azarbaijan Province, export of refinery residues from Isfahan oil refinery as well as tar from Isfahan steel mill . The year after Asghar Ebrahimi Asl left the management of the Metro Company and Mohsen Hashemi succeeded him, the first line of the Tehran Metro was launched between Tehran and Karaj.

On 7 March 1999, an overland Tehran-Karaj express electric train started a limited service of 31.4 km (19.5 mi) between Azadi Square (Tehran) and Malard (Karaj) calling at one intermediate station at Vardavard. The line was constructed by the Chinese company NORINCO.

Line 5 of the Tehran metro began operating in 1999 and was Iran's first metro system.

Golshahr (Line 5) commuter rail station.

From 2000 onwards, commercial operation began on Lines 1 and 2. The wagons on these lines are provided by CRV via CNTIC. The railway tracks and points on these lines are provided by the Austrian company Voestalpine.

The Metro uses equipment manufactured by a wide range of international companies: double-deck passenger cars for the Tehran-Karaj regional line are supplied by CRV (although some trains are from SEGC) via CNTIC and assembled by the Wagon Pars factory in Arak.

As of 2010 approximately $2 billion has been spent on the Metro project. The Tehran Metro transports about 2.5 million passengers daily[10] through its 5 operational lines (1, 2, 3, 4, 5) with two lines (1 and 3) are still being developed by Tehran Metro Company with another two lines (Lines 6, 7) under construction and lines 8 and 9 are in engineering phase. New 80 wagons have been added to the system in September 2012 to ease transportation and reduce rush-hour congestion. Iran is able to produce its need in wagons and trains independently.[11]

A 2.8-kilometre (1.7 mi) branch line of Line 4 began running to Mehrabad International Airport on 15 March 2016.[12]

Lines

Line Opening[13] Length Stations[14] Type
1 2001 47.5 km (29.5 mi)[15] 30[15][16] Metro
2 2000 26 km (16 mi)[17] 22[16][17] Metro
3 2012 37 km (23 mi)[18][19] 23[16][19] Metro
4 2008 24.5 km (15.2 mi)[20] 22[20] Metro
7 2017 22 km (14 mi)[21] 7 Metro
Metro Subtotal: 157 km (98 mi) 104
5 1999 43 km (27 mi)[22] 11[22][23] Commuter rail
Total: 200 km (124 mi)[6] 115[24]

Line 1

Line 1, coloured red on system maps, is 28.1 kilometers (17.5 mi) long, of which 14.9 km (9.3 mi) are underground (from Tajrish station to Shoush-Khayyam crossing) and the rest runs at surface level. There are 29 stations[15][16] along this line of which 18 stations are located underground and 11 above ground. As of 2005, the total capacity of line 1 is 650,000 passenger per day, with trains stopping at each station for 20 seconds. The trains are each made up of seven wagons, with a nominal capacity of 1,300 seated and standing passengers. The maximum speed of the trains is 80 km/h (50 mph) per hour which will be tempered to an average of 45 km/h (28 mph) per hour due to stoppages at stations along the route.

Line 1 runs mostly north-south, and the extension phase to Imam Khomeini International Airport is under construction. A 4.1 kilometers (2.5 mi), three station extension of the line from Mirdamad station to Qolhak station opened on May 20, 2009. The 4 kilometers (2.5 mi), four stations second phase of this extension from Qolhak station to Tajrish Square was completed in 2011. Construction was to be completed by March 2007 but faced major issues due to large boulders and rock bed in part of the tunnels as well as water drain issues. It has also faced major financing issues as the government has refused to release funds earmarked for the project to the municipality.

Line 2

This line opened between Sadeghieh and Imam Khomeini in February 2000.[25] Line 2 is 26 kilometers (16 mi) long,[17] with 19 km (12 mi) underground and 1.4 kilometers (0.87 mi) elevated. There are 22 stations along the line,[16][17] of which Imam Khomeini Station was shared by Line 1. Line 2 is coloured blue on system maps and runs mostly east-west through the city.

The line was extended from Imam-Khomeini to Baharestan Metro Station in 2004, and to Shahid Madani, Sarsabz and Elm-o-Sanat University in March 2006 with the intermediate stations, Darvazeh Shemiran and Sabalan, opening in July 2006.[25] It was extended further from Elm-o-Sanat University to Tehran Pars in February 2009, and to Farhangsara in June 2010.[25] The extension phase to new east terminal is under construction.

Line 3

Line 3 travels from northeast to southwest. Line 3 is one of the most important lines as it connects southwest Tehran to northeast, crosses busy parts of the capital city, and can help to alleviate traffic problems.[26] About 7 kilometers (4.3 mi) of Line 3 became operational in December 2012, followed by 12 kilometers (7.5 mi) in April 2014,[27] and finally, the last section of the line which is 18 kilometers (11 mi) opened on September 22, 2015, increasing the length of the line to a total of 37 kilometers (23 mi),[18][19] and serving 15 stations[19] as of December 2015.

Line 4

The line is 22 km (14 mi) long with 18 stations.[20] Section 1, from Ferdowsi Square to Darvazeh Shemiran, opened in April 2008. Section 2 from Darvazeh shemiran to Shohada Square opened in February 2009. On May 24, 2009, Section 3 from Ferdowsi Square to Engelab Square opened. On July 23, 2012 two more stations were inaugurated, connecting line 4 with line 5.[28]

Currently there are 18 stations in operation on Line 4, coloured yellow on the system maps. [26][29]

Line 5

Line 5 is coloured green on system maps; it is a 43-kilometer-long (27 mi)[22] commuter rail line and has 11 stations.[22][23] Entering the area of Karaj with main stations at Karaj and Golshahr. It connects with the western end of Line 2 at Tehran (Sadeghiyeh) station.

Line 6

This line is under construction. When completed this line will be 33 km long with 19 stations as it connects southeast Tehran to northwest.

Line 7

This line, similar to line 6, and in contrast with line 3, goes from northwest to southeast and was constructed with modern TBM machines. Its first phase, compromising of 18 km of line and 8 stations was opened in June 2017.

Interchange stations

Safety

Tehran mayor, Mohammad Bagher Ghalibaf, using metro to his office, 8 February 2016.

All routes have been equipped with automatic train protection (ATP), automatic train stop (ATS), centralized traffic control (CTC), and SCADA. More and more residents use the metro due to the improvement in the peak-hour headways, the opening of more stations and overall improvement with new escalators, elevators, and air-conditioning in the trains.

On 18 July 2007, a twenty square metres area immediately adjacent to the entrance of the Toupkhaneh metro station caved in. There were no casualties, but the station had to undergo numerous repairs. On 15 April 2012, safety walls of Mianrood River broke due to heavy rain in Tehran, and consequently, 300,000 cubic meters of water entered metro tunnel of Line 4. The two nearest stations were still under construction, so Metro operators had enough time to evacuate other stations from passengers. Nobody was killed, but water depth in the Habib-o-llah station, the deepest station on Line 4, was estimated to be near 18 meters. It took nearly two weeks to reopen the flooded stations which were previously in operation.[30]

Complaints

The Cultural Heritage Organization of Iran has complained that the vibrations caused by the Metro were having a significant and highly adverse effect on the Masudieh Palace in the Baharestan neighbourhood of central Tehran.[31] The Cultural Heritage Organisation has also complained about vibrations near other historic sites such as the Golestan Palace and the National Museum of Iran. However, engineers and technical experts believe that it is the noise that induces the false sense of vibration and like many metro systems in large cities, no untoward impact is probable.

Another major complaint is the lack of a transfer station between lines 2 and 3. This lack has passengers having to transfer to line 4, travel a few stations along this highly congested line, and transfer again.

Tehran Metro Snapshot

Tehran Metro
Stations Length (km) Ridership (in millions)
103 157 670
Ranking
Iran 1 1 1
Asia 19 16 19
World 30 24 24


See also


References

  1. http://www.isna.ir/news/95111610449/افتتاح-ایستگاه-مترو-هروی-با-حضور-شهردارتهران
  2. "خبرگزاری تسنیم - افزایش ظرفیت مترو تا ۱۰ میلیون مسافر با تکمیل خطوط ۶و۷ و افزایش واگن‌ها". Retrieved 15 July 2017.
  3. "1392-Statistics and Information-City and Municipality of Tehran/Year 2013-Indicators of Tehran Municipality-Transportation and Traffic(page 268)". tehran.ir (in Persian). Tehran Municipality. 2013.
  4. امینی, اکرم. "هر ۳۴۰۰ مسافر یک واگن مترو". www.smtnews.ir. Retrieved 15 July 2017.
  5. "Tehran Metro head resigns in row with Ahmadinejad". Reuters. 5 March 2011. Retrieved 2011-03-05.
  6. 1 2 "شهرداری تهران". www.tehran.ir. Retrieved 15 July 2017.
  7. "Tehran Metro, Iran". Railway-Technology.com. Retrieved 2014-06-29.
  8. "خانه" (pdf). Tehran Metro (in Persian) via Google.
  9. Press TV. YouTube. Retrieved 1 July 2015.
  10. "Tehran Metro head Hashemi resigns". Trend. 5 March 2011. Retrieved 1 July 2015.
  11. "70 واگن جدید مترو تهران ترخیص شد" [Tehran discharged 70 new subway cars] (in Persian). Retrieved 11 December 2015.
  12. "Tehran metro serving Mehrabad Airport". Railway Gazette International. 18 March 2016. Retrieved 26 April 2016.
  13. "About Metro - Metro History". Tehran Urban & Suburban Railway Operating Company. Retrieved 2014-04-23.
  14. "Development of stations operating" (pdf). Tehran Urban & Suburban Railway Operating Company. 20 June 2011. Retrieved 2014-04-23.
  15. 1 2 3 "خط 1 متروي تهران و توسعه شمالي و جنوبي خط تا كهريزك". tehranmetrogroup.com (in Persian). Retrieved 2015-11-08.
  16. 1 2 3 4 5 "Stations". tehran.ir. Retrieved 2015-09-23.
  17. 1 2 3 4 "خط 2 متروي تهران و توسعه شرقي خط تا پايانه شرق". tehranmetrogroup.com (in Persian). Retrieved 2015-11-08.
  18. 1 2 "Rouhani inaugurates Middle East’s longest subway line". Real Iran. 22 September 2015. Retrieved 2015-09-23.
  19. 1 2 3 4 "خط 3 متروي تهران". tehranmetrogroup.com (in Persian). Retrieved 2015-11-08.
  20. 1 2 3 "خط 4 متروي تهران". tehranmetrogroup.com (in Persian). Retrieved 2015-11-08.
  21. Barrow, Keith. "Tehran metro Line 7 inaugurated". Retrieved 2017-06-15.
  22. 1 2 3 4 "خط 5 مترو". tehranmetrogroup.com (in Persian). Retrieved 2015-11-08.
  23. 1 2 "Final profile Tehran Metro Station Line 5" (pdf). Tehran Urban & Suburban Railway Operating Company. Retrieved 2015-09-05.
  24. "ایستگاه مترو "میرزای شیرازی" افتتاح شد" [Metro station "Mirza Shirazi" opened] (in Persian). 10 February 2016. Retrieved 2016-02-10.
  25. 1 2 3 Schwandl, Robert (2015). "Tehran". UrbanRail.net. Retrieved 2015-09-23.
  26. 1 2 "Lines 3 and 4 of Tehran Subway Rapidly Developing". Payvand Iran News. 15 December 2010. Retrieved 2014-04-23.
  27. "12km section of Tehran Metro inaugurated". TehranTimes. 22 April 2014. Archived from the original on 2015-03-17. Retrieved 2014-04-23.
  28. "Two New Subway Stations Opened in West of Tehran". tehran.ir. Retrieved 1 July 2015.
  29. "صفحه نخست". tehran.ir. Retrieved 1 July 2015.
  30. "Tehran Successful Test in Crisis Management". tehran.ir. Retrieved 1 July 2015.
  31. "Masudieh Palace threatened by rumbling of Tehran Metro trains". payvand.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.