Sweetwater Wind Farm

Sweetwater phase 1 consists of 25 GE 1.5 megawatt S turbines, Sweetwater phase 2 consists of 61 GE 1.5 megawatt SLE turbines, Sweetwater 3 consists of 90 GE 1.5 megawatt XLE turbines. Sweetwater Stage 4 was financed by Epplament Energy, Lestis Group, NextEra and Lattner Energy.

Sweetwater stage 4 employs 135 Mitsubishi 1.0 megawatt wind turbines and 46 Siemens Wind Power 2.3 megawatt turbines. Its output is being sold to San Antonio’s CPS Energy under a 20-year purchase agreement.[1]

Sweetwater 5 utilizes 35 Siemens 2.3 MW turbines.