Space Launch System

Space Launch System

Artist's rendering of the SLS Block 1 Crew launching with Orion on Exploration Mission 1.
Function Launch vehicle
Manufacturer Boeing, United Launch Alliance, Orbital ATK, Aerojet Rocketdyne
Country of origin United States
Project cost US$7 billion (2014-18, 2014 estimate),[1] to
$35 billion (until 2025, 2011 est.)[2][3]
Cost per launch US$500 million (2012 projection)[4]
Size
Height 64.6 m (211 ft 11 in), Core Stage
Diameter 8.4 m (27 ft 7 in), Core Stage
Stages 2
Capacity
Payload to LEO 70,000 to 130,000 kg (150,000 to 290,000 lb)
Associated rockets
Family Shuttle-Derived Launch Vehicles
Comparable Saturn V, Energia, N-1, Ares V, Falcon Heavy, New Glenn
Launch history
Status Under development
Launch sites LC-39B, Kennedy Space Center
First flight Exploration Mission 1 (2019)[5]
Notable payloads Orion MPCV, Europa Clipper
Boosters (Block 1, 1B)
No. boosters 2 five-segment Solid Rocket Boosters
Thrust 3,600,000 lbf (16,000 kN)
Total thrust 7,200,000 lbf (32,000 kN)
Specific impulse 269 seconds (2.64 km/s) (vacuum)
Burn time 124 seconds
Fuel PBAN, APCP
First stage (Block 1, 1B, 2) – Core Stage
Length 64.6 m (211 ft 11 in)
Diameter 8.4 m (27 ft 7 in)
Empty mass 85,270 kg (187,990 lb)
Gross mass 979,452 kg (2,159,322 lb)
Engines 4 RS-25D/E[6]
Thrust 7,440 kN (1,670,000 lbf)
Specific impulse 363 seconds (3.56 km/s) (sea level), 452 seconds (4.43 km/s) (vacuum)
Fuel LH2 / LOX
Second stage (Block 1) – ICPS
Length 13.7 m (44 ft 11 in)
Diameter 5 m (16 ft 5 in)
Empty mass 3,490 kg (7,690 lb)
Gross mass 30,710 kg (67,700 lb)
Engines 1 RL10B-2
Thrust 110.1 kN (24,800 lbf)
Specific impulse 462 seconds (4.53 km/s)
Burn time 1125 seconds
Fuel LH2 / LOX
Second stage (Block 1B, Block 2) – Exploration Upper Stage
Diameter 8.4 m (27 ft 7 in)
Engines 4 RL10
Thrust 99,000 lbf (440 kN)
Fuel LH2 / LOX

The Space Launch System (SLS) is an American Space Shuttle-derived heavy expendable launch vehicle. It is part of NASA's deep space exploration plans[7][8] including a manned mission to Mars.[9][10][11] SLS follows the cancellation of the Constellation program, and is to replace the retired Space Shuttle. The NASA Authorization Act of 2010 envisions the transformation of the Constellation program's Ares I and Ares V vehicle designs into a single launch vehicle usable for both crew and cargo, similar to the Ares IV. The SLS is to be the most powerful rocket ever built[12] with a total thrust greater than that of the Saturn V,[13] putting the SLS into the super heavy-lift launch vehicle class of rockets.[N 1][14][14][15][16][17]

The SLS launch vehicle is to be upgraded over time with more powerful versions. Its initial Block 1 version is to lift a payload of 70 metric tons to low Earth orbit (LEO), which will be increased with the debut of Block 1B and the Exploration Upper Stage.[18] Block 2 will replace the initial Shuttle-derived boosters with advanced boosters and is planned to have a LEO capability of more than 130 metric tons to meet the congressional requirement.[19] These upgrades will allow the SLS to lift astronauts and hardware to destinations beyond LEO: on a circumlunar trajectory as part of Exploration Mission 1 with Block 1; to deliver the first element of the Deep Space Gateway (DSG) in Exploration Mission 2 with Block 1B; and to Mars with Block 2.[20] The SLS will launch the Orion Crew and Service Module and may support trips to the International Space Station if necessary. SLS will use the ground operations and launch facilities at NASA's Kennedy Space Center, Florida.

During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program has a projected development cost of $18 billion through 2017, with $10 billion for the SLS rocket, $6 billion for the Orion Multi-Purpose Crew Vehicle and $2 billion for upgrades to the launch pad and other facilities at Kennedy Space Center.[21][22] Various organizations, such as the Space Access Society, Space Frontier Foundation, and The Planetary Society called for cancellation of the program, arguing it is unnecessarily cost-intensive and will consume the funds for other NASA projects, and that it will not reduce launch costs.[23]

Design and development

Space Launch System's planned upgrade path

On September 14, 2011, NASA announced its design selection for the new launch system, declaring that it, in combination with the Orion spacecraft,[24] would take the agency's astronauts farther into space than ever before and provide the cornerstone for future US human space exploration efforts.[25][26][27]

During the early development of the SLS a number of configurations were considered, including a Block 0 variant with three main engines,[28] a Block 1A variant that would have upgraded the vehicle's boosters instead of its second stage,[28] and a Block 2 with five main engines and a different second stage, the Earth Departure Stage, with up to three J-2X engines.[29] In February 2015, it was reported that NASA evaluations showed "over performance" versus the baseline payload for Block 1 and Block 1B configurations.[30]

Three versions of the SLS launch vehicle are planned: Block 1, Block 1B, and Block 2. Each will use the same core stage with four main engines, but Block 1B will feature a more powerful second stage called the Exploration Upper Stage (EUS), and Block 2 will combine the EUS with upgraded boosters. Block 1 has a baseline LEO payload capacity of 70 metric tons (77 short tons) and Block 1B has a baseline of 105 metric tons (116 short tons). The proposed Block 2 will have lift capacity of 130 metric tons (140 short tons), which is similar to that of the Saturn V.[19][31] Some sources state this would make the SLS the most capable heavy lift vehicle built;[32][33] although the Saturn V lifted approximately 140 metric tons (150 short tons) to LEO in the Apollo 17 mission.[14][34]

On July 31, 2013, the SLS passed the Preliminary Design Review (PDR). The review encompassed all aspects of the SLS's design, not only the rocket and boosters but also ground support and logistical arrangements.[35] On August 7, 2014 the SLS Block 1 passed a milestone known as Key Decision Point C and entered full-scale development, with an estimated launch date of November 2018.[36][37] In April 2017, NASA announced that the schedule for the maiden flight would slip to 2019, and may include a crew.[5]

Vehicle description

Artist's rendering of a SLS Block 1

Core Stage

The Space Launch System's Core Stage will be 8.4 meters (28 ft) in diameter and use four RS-25 engines.[6][28] Initial flights will use modified RS-25D engines left over from the Space Shuttle program;[38] later flights are expected to switch to a cheaper version of the engine not intended for reuse.[39] The stage's structure will consist of a modified Space Shuttle external tank with the aft section adapted to accept the rocket's Main Propulsion System (MPS) and the top converted to host an interstage structure.[32][40] It will be fabricated at the Michoud Assembly Facility.[41]

The core stage will be common across all currently planned evolutions of the SLS. Initial planning included studies of a smaller Block 0 configuration with three RS-25 engines,[42][43] which was eliminated to avoid the need to substantially redesign the core stage for more powerful variants.[28] Likewise, while early Block 2 plans included five RS-25 engines on the core,[29] it was later baselined with four engines.[30]

Boosters

Shuttle-derived boosters

Blocks 1 and 1B of the SLS will use two five-segment Solid Rocket Boosters (SRBs), which are based on the four-segment Space Shuttle Solid Rocket Boosters. Modifications for the SLS included the addition of a center booster segment, new avionics, and new insulation which eliminates the Shuttle SRB's asbestos and is 860 kg (1,900 lb) lighter. The five-segment SRBs provide approximately 25% more total impulse than the Shuttle SRB and will not be recovered after use.[44][45]

Orbital ATK (formerly Alliant Techsystems) has completed full-duration static fire tests of five-segment SRBs. These include successful firings of three developmental motors (DM-1 to DM-3) from 2009 to 2011. The DM-2 motor was cooled to a core temperature of 40 °F (4 °C), and DM-3 was heated to above 90 °F (32 °C) to validate performance at extreme temperatures.[46][47][48] Qualification Motor 1 (QM-1) was tested on March 10, 2015.[49] Qualification Motor 2 was successfully tested on June 28, 2016. It was the final ground test before Exploration Mission 1 (EM-1).

Advanced boosters

For Block 2, NASA plans to switch from Shuttle-derived five-segment SRBs to advanced boosters.[50] This will occur after development of the Exploration Upper Stage for Block 1B. Early plans would have developed advanced boosters before an updated second stage; this configuration was called Block 1A. By 2012 NASA planned to select these new boosters through an Advanced Booster Competition which was to be held in 2015.[6][51] Several companies proposed boosters for this competition:

Christopher Crumbly, manager of NASA's SLS advanced development office in January 2013 commented on the booster competition, "The F-1 has great advantages because it is a gas generator and has a very simple cycle. The oxygen-rich staged combustion cycle [Aerojet's engine] has great advantages because it has a higher specific impulse. The Russians have been flying ox[ygen]-rich for a long time. Either one can work. The solids [of ATK] can work."[60]

Later analysis showed the Block 1A configuration would result in high acceleration which would be unsuitable for Orion and could require a costly redesign of the Block 1 core.[61] In 2014, NASA confirmed the development of Block 1B instead of Block 1A and called off the 2015 booster competition.[30][62] In February 2015, it was reported that SLS is expected to fly with the five-segment SRB until at least the late 2020s, and modifications to Launch Pad 39B, its flame trench, and SLS's Mobile Launcher Platform were evaluated based on SLS launching with solid-fuel boosters.[30]

Upper Stage

An RL10 engine, like the one pictured above, will be used as the second stage engine in both the ICPS and EUS upper stages.

Interim Cryogenic Propulsion Stage

Block 1, scheduled to fly Exploration Mission 1 (EM-1) in 2019,[5] will use the Interim Cryogenic Propulsion Stage (ICPS). This stage will be a modified Delta IV 5–meter Delta Cryogenic Second Stage (DCSS),[63] and will be powered by a single RL10B-2. Block 1 will be capable of lifting 70 t in this configuration, however the ICPS will be considered part of the payload and be placed into an initial 1,800 km by 93 km suborbital trajectory to ensure safe disposal of the core stage. ICPS will perform an orbital insertion burn at apogee, and then a translunar injection burn to send the uncrewed Orion on a circumlunar excursion.[64]

Exploration Upper Stage

The Exploration Upper Stage (EUS) is scheduled to debut on Exploration Mission 2 (EM-2). It is expected to be used by Block 1B and Block 2 and, like the core stage, have a diameter of 8.4 meters. The EUS is to be powered by four RL10 engines,[65] complete the SLS ascent phase and then re-ignite to send its payload to destinations beyond low-Earth orbit, similar to the role performed by the Saturn V's 3rd stage, the J-2 powered S-IVB.[66]

Other upper stages

The Bimodal Nuclear Thermal Rocket engines on the Mars Transfer Vehicle (MTV). Cold launched, it would be assembled in-orbit by a number of Block 2 SLS payload lifts. The Orion spacecraft is docked on the left.

Fabrication and testing

In mid-November 2014, construction of the first SLS rocket began using the new welding system at NASA's Michoud Assembly Facility, where the Core Stage will be assembled.[83]

The SLS will have the ability to tolerate a minimum of 13 tanking cycles due to launch scrubs and other launch delays before launch. The assembled rocket is to be able to remain at the launch pad for a minimum of 180 days and can remain in stacked configuration for at least 200 days without destacking.[84]

Rendering of the SLS Block 1 with its older black-and-white paint scheme, showing core stage, two 5-segment SRBs, and the smaller upper stage.

In January 2015, NASA began test firing RS-25 engines in preparation for use on SLS. Tests continued throughout Spring of 2015. Further testing was conducted in 2016 and 2017.[39]

Multiple facilities throughout the country have started full scale fabrication of different segments of the launch vehicle. Orbital ATK began casting propellant for the solid rocket boosters and manufacturing parts for the boosters in 2016. The company test fired a solid rocket booster in early 2015,[85] and a second booster in June 2016.[86] Confidence article builds for the core stage began on 5 January 2016 and were expected to be completed in late January of that year. Once completed the test articles will be sent to ensure structural integrity at Marshall Spaceflight Center. The ICPS for EM-1 was slated for assembly in late January, and a structural test article was delivered to NASA in 2015 for confidence testing.[87]

Program costs and funding

In August 2014, as the SLS program passed its Key Decision Point C review and entered full development, costs from February 2014 until its planned launch in September 2018 were estimated at $7.021 billion.[37] Ground systems modifications and construction would require an additional $1.8 billion over the same time period. As of February 2015 the Orion spacecraft was expected to enter its Key Decision Point C review in the first half of 2015.[88]

During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program had a projected development cost of $18 billion through 2017, with $10 billion for the SLS rocket, $6 billion for the Orion Multi-Purpose Crew Vehicle and $2 billion for upgrades to the launch pad and other facilities at Kennedy Space Center.[21] These costs and schedule were considered optimistic in an independent 2011 cost assessment report by Booz Allen Hamilton for NASA.[89] An unofficial 2011 NASA document estimated the cost of the program through 2025 to total at least $41bn for four 70 t launches (1 unmanned, 3 manned),[2][3] with the 130 t version ready no earlier than 2030.[90]

The Human Exploration Framework Team (HEFT) estimated unit costs for Block 0 at $1.6bn and Block 1 at $1.86bn in 2010.[91] However, since these estimates were made the Block 0 SLS vehicle was dropped in late 2011, and the design was not completed.[92] The Space Review estimated the cost per launch at $5 billion, depending on the rate of launches.[93][94] NASA announced in 2013 that the European Space Agency will build the Orion Service Module.[95]

NASA SLS deputy project manager Jody Singer at Marshall Space Flight Center, Huntsville, Alabama stated in September 2012 that $500 million per launch is a reasonable target cost for SLS, with a relatively minor dependence of costs on launch capability.[4] By comparison, a Saturn V launch cost US$185 to US$189 million in 1969-1971 dollars or roughly $1.23 billion in 2016 dollars adjusted for inflation.[96][97]

On July 24, 2014, Government Accountability Office audit predicted that SLS will not launch by the end of 2017 as originally planned since NASA is not receiving sufficient funding.[98]

For Fiscal Year 2015, NASA received an appropriation of US$1.7 billion from Congress for SLS, an amount that was approximately US$320 million greater than the amount requested by the Obama administration.[99]

Funding history and planning

For fiscal years 2011 through 2015, the SLS program had expended funding totaling $7.7 billion in nominal dollars. This is equivalent to $8.3 billion adjusting to 2016 dollars using the NASA New Start Inflation Indices.[100]

Fiscal Year Funding ($millions) Line Item Name
2011 $1,536.1 Actuals, 2011, Space Launch System[101]
(Formal SLS Program reporting excludes the Fiscal 2011 budget as being before "formulation start" in November 2011,[102] Fiscal Year 2012)
2012 $1,497.5 Actuals, 2012, Space Launch System[103]
2013 $1,414.9 Actuals, 2013, Space Launch System[104]
2014 $1,600.0 Actuals, 2014, Space Launch System[105]
2015 $1,700.0 Enacted, 2015, Space Launch System[105]
2011-2015 Total $7,748.5 million

For 2016, the SLS program funding, excluding the Exploration Upper Stage (EUS), was enacted at $1,915M[106] with an additional $7,180M[107] planned for 2017 through 2021. The SLS program has a 70% confidence level for initial program completion by 2023 according to the Associate Administrator for NASA, Robert Lightfoot.[108][109][110]

The sum of the prior SLS program funding from 2011 to 2015, funding enacted for 2016, funding planned for 2017 through 2021, and funding through completion of development by 2023 is $20.0 billion (nominal).

These prior SLS costs:

  1. Exclude costs of the predecessor Ares V / Cargo Launch Vehicle (funded from 2008 to 2010)[111]
  2. Exclude costs for the Ares 1 / Crew Launch Vehicle (funded from 2006 to 2010, a total of $4.8 billion[111][112] in development that included the 5-segment Solid Rocket Boosters that will be used on the SLS)
  3. Exclude costs of the Upper Stage for the SLS, the EUS
  4. Exclude costs to assemble, integrate, prepare and launch the SLS and its payloads such as Orion (funded under the NASA Ground Operations Project,[113] currently about $400M[105] per year)
  5. Exclude costs of payloads for the SLS (such as Orion)

There are no NASA estimates for the SLS program recurring yearly costs once operational, for a certain flight rate per year, or for the resulting average costs per flight.

Criticism

The Space Access Society, Space Frontier Foundation and The Planetary Society called for cancellation of the project in 2011–12, arguing that SLS will consume the funds for other projects from the NASA budget and will not reduce launch costs.[23][114][115] U.S. Representative Dana Rohrabacher and others added that instead, a propellant depot should be developed and the Commercial Crew Development program accelerated.[23][116][117][118][119] Two studies, one not publicly released from NASA[120][121] and another from the Georgia Institute of Technology, show this option to be possibly cheaper.[122][123]

Others suggest it will cost less to use an existing lower payload capacity rocket (Atlas V, Delta IV, Falcon 9, or the derivative Falcon Heavy), with on-orbit assembly and propellant depots as needed, rather than develop a new launch vehicle for space exploration without competition for the whole design.[124][125][126][127][128] The Augustine commission proposed an option for a commercial 75 metric ton launcher with lower operating costs, and noted that a 40 to 60 t launcher can support lunar exploration.[129]

Mars Society founder Robert Zubrin, who co-authored the Mars Direct concept, suggested that a heavy lift vehicle should be developed for $5 billion on fixed-price requests for proposal. Zubrin also disagrees with those that say the U.S. does not need a heavy-lift vehicle.[130] SpaceX's CEO Elon Musk stated in 2010 that he would "personally guarantee" that his company could build a launch vehicle in the 140-150 t payload range, for $2.5 billion, or $300 million per launch, but cautioned that this price tag did not include a potential upper-stage upgrade.[131][132] SpaceX's privately funded ITS launch vehicle, powered by multiple Raptor engines, has also been proposed for lifting very large payloads from Earth in the 2020s.[133]

Rep. Tom McClintock and other groups argue that the Congressional mandates forcing NASA to use Space Shuttle components for SLS amounts to a de facto non-competitive, single source requirement assuring contracts to existing shuttle suppliers, and calling the Government Accountability Office (GAO) to investigate possible violations of the Competition in Contracting Act (CICA).[114][134][135] Opponents of the heavy launch vehicle have critically used the name "Senate launch system".[63] The Competitive Space Task Force, in September 2011, said that the new government launcher directly violates NASA's charter, the Space Act, and the 1998 Commercial Space Act requirements for NASA to pursue the "fullest possible engagement of commercial providers" and to "seek and encourage, to the maximum extent possible, the fullest commercial use of space".[23]

In 2013, Chris Kraft, the legendary NASA mission control leader from Apollo era, expressed his criticism of the system as well.[136] Lori Garver, former NASA Deputy Administrator, has called for cancelling the program.[137] Phil Plait has voiced his criticism of SLS in light of ongoing budget tradeoffs between Commercial Crew Development and SLS budget, also referring to earlier critique by Garver.[138]

Doubts have also been expressed about the utility and cost of depots.[139] "Patrick R. Chai and Alan W. Wilhite of Georgia Tech presented a study early in 2011 estimating that depot tanks would lose about $12 million worth of propellant per month in low Earth orbit if protected only with passive insulation."[140]

The Planetary Society accepted that a Mars mission could be had with existing budgets.[141]

SLS mission schedule

The list below includes only confirmed missions.

Confirmed SLS missions (launch history)
Mission Acronym Rocket Crewed Launch date Status Duration Mission Summary Destination Reference
Exploration Mission 1 EM-1 SLS Block 1 Crew No 2019 Planned 1 month Send Orion capsule on trip around the Moon, deploy 6 other small CubeSats.[142][143] Lunar Orbit [5][36][144]
Europa Clipper EC SLS Block 1B Cargo No 2022 Planned Unmanned Flagship-class mission to explore Europa. Expected to launch by 2022. Jovian orbit [145][146][147]
Exploration Mission 2 EM-2 SLS Block 1B Crew Yes 2021/23 Planned 8-21 days Orion capsule (crew 4) delivers to lunar orbit the first module of Deep Space Gateway (DSG) the 40kW Power/Solar Electric Propulsion(SEP) Bus Lunar Orbit [65][147][148][149][150][151][152]
Exploration Mission 3 EM-3 SLS Block 1B Crew Yes 2024 Planned 16-26 days Orion capsule (crew 4) delivers to lunar orbit the habitation module to the DSG. Lunar Orbit [153][154][11]
Exploration Mission 4 EM-4 SLS Block 1B Crew Yes 2025 Planned 26-42 days Orion capsule (crew 4) logistics delivery to the DSG. Lunar Orbit [154]
Exploration Mission 5 EM-5 SLS Block 1B Crew Yes 2026 Planned 26-42 days Orion capsule (crew 4) delivers to lunar orbit the airlock module to the DSG. Lunar Orbit [154]
Exploration Mission 6 EM-6 SLS Block 1B Cargo No 2027 Planned Deep Space Transport (DST) to the DSG. Lunar Orbit [154]
Exploration Mission 7 EM-7 SLS Block 1B Crew Yes 2027 Planned 191-221 days Orion capsule (crew 4) - DST checkout mission. Lunar Orbit [154]
Exploration Mission 8 EM-8 SLS Block 1B Cargo No 2028 Planned DST Cargo Logistics and refuelling mission. Lunar Orbit [154]
Exploration Mission 9 EM-9 SLS Block 2 Crew Yes 2029 Planned 1 year Orion capsule (crew 4) - DST long-duration shakedown mission. Lunar Orbit [154]
Exploration Mission 10 EM-10 SLS Block 2 Cargo No 2030 Planned Cargo DST Logistics and Refuelling Mission Lunar Orbit [154]
Exploration Mission 11 EM-11 SLS Block 2 Crew Yes 2033 Planned 2 years Interplanetary flight Martian orbit [154]

SLS cancelled missions

Cancelled SLS missions
Mission Acronym Rocket Crewed Launch date Status Duration Mission Summary Destination Reference
Asteroid Redirect Crewed Mission ARCM SLS Block 1B Crew Yes 2026 Cancelled Send an Orion capsule with four crew members to an asteroid that had been robotically captured. The Moon and a captured asteroid boulder [155][156]

Payload mass to various orbits

This includes canceled/proposed SLS variants.

Vehicle Orbit or
location
Payload mass
(metric tons)
Example mission Flight tested
Block 0 Low Earth orbit 70[157] Send payloads to low Earth orbit, launch an Orion capsule and cargo to the International Space Station if Commercial Crew Development does not come to fruition No
Block 1 Low Earth orbit 70[158] Send payloads to low Earth orbit No
Block 1 Earth-Moon L-2 28[158] Send Orion capsule beyond the Moon, launch B330, Exploration Gateway Platform No
Block 1 Near Earth object 12[158] Asteroid Redirect Mission No
Block 1 Low Lunar orbit 12[158] Visit captured asteroid No
Block 1 Jupiter 4[158][159] Europa Clipper, Jupiter orbiter followup to Galileo No
Block 1A Low Earth orbit 105[157][160][161] Send payloads to low Earth orbit, preparation for human mission to Mars No
Block 1B Low Earth orbit 105[158] Send payloads to low Earth orbit, preparation for human mission to Mars No
Block 1B Trans-Lunar injection 39.2[158] Human-assisted Lunar sample return, crewed lunar surface mission No
Block 1B Earth-Moon L-2 45[158] Launch B330, Exploration Gateway Platform, Skylab II, Deep Space Habitat, or Nautilus-X, launch Orion and logistics module to these space stations No
Block 1B Earth-Sun L-2 40[158][159] Advanced Technology Large-Aperture Space Telescope No
Block 1B Near Earth object 40[158] Planetary defense No
Block 1B Saturn 6[159] Titan Saturn System Mission No
Block 1B Uranus 5[158][159] Uranus orbiter and probe No
Block 2 Low Earth orbit 130[159] Preparation for human mission to Mars No
Block 2 200 AU 2[158][159] Interstellar probe No
Saturn IB Low Earth orbit (LEO) 21[162] Comparison only Yes
Saturn C-3 Low Earth orbit 45[163] Comparison only No
Saturn V Low Earth orbit 140[164][165][N 2] Comparison only Yes
N1 Low Earth orbit 95 Comparison only Never reached orbit
Energia Low Earth orbit 100 Comparison only Yes
Delta IV Heavy Low Earth orbit 28.79 Comparison only Yes
Vulcan-561 + ACES Low Earth orbit 30.5[166] Comparison only No
Vulcan-500 Heavy + ACES Low Earth orbit 46.5[166] Comparison only No
New Glenn 2-stage Low Earth orbit 45[167] Comparison only No
New Glenn 3-stage Low Earth orbit 70[168] Comparison only No
Falcon Heavy Low Earth orbit 63.8[169] Comparison only No
Falcon Heavy Geostationary
transfer orbit
(GTO)
26.7[169] Comparison only No
Falcon Heavy Mars 16.8[169] Comparison only No
ITS launch vehicle (reuseable) Low Earth orbit 300 Comparison only No
ITS launch vehicle (expendable) Low Earth orbit 550 Comparison only No
Sea Dragon (rocket) Low Earth orbit 550[170] Comparison only No

See also

Notes

  1. SLS has greater thrust than Saturn V but a lower payload capability.
  2. Includes mass of Apollo Command/Service Modules, Apollo Lunar Module, Spacecraft/LM Adapter, Saturn V Instrument Unit, S-IVB stage, and propellant for translunar injection

References

  1. "NASA commits to $7 billion mega rocket, 2018 debut". CBS News. August 27, 2014. Retrieved 2015-03-13.
  2. 1 2 ANDY PASZTOR (September 7, 2011). "White House Experiences Sticker Shock Over NASA's Plans". The Wall Street Journal. Retrieved 22 February 2015.
  3. 1 2 "ESD Integration, Budget Availability Scenarios" (PDF). Space Policy Online. 19 August 2011. Retrieved 15 September 2011.
  4. 1 2 "NASA's huge new rocket may cost $500 million per launch". MSNBC. September 12, 2012.
  5. 1 2 3 4 Clark, Stephen (28 April 2017). "NASA confirms first flight of Space Launch System will slip to 2019". Spaceflight Now. Retrieved 29 April 2017.
  6. 1 2 3 "NASA space launch system" (PDF). c. 2012.
  7. Siceloff, Steven (April 12, 2015). "SLS Carries Deep Space Potential".
  8. "World's Most Powerful Deep Space Rocket Set To Launch In 2018".
  9. Chiles, James R. "Bigger Than Saturn, Bound for Deep Space".
  10. "Finally, some details about how NASA actually plans to get to Mars".
  11. 1 2 "NASA finally sets goals, missions for SLS – eyes multi-step plan to Mars - NASASpaceFlight.com". www.nasaspaceflight.com.
  12. Harbaugh, Jennifer (May 12, 2017). "NASA Continues Testing, Manufacturing World’s Most Powerful Rocket".
  13. "Yes, NASA's New Megarocket Will Be More Powerful Than the Saturn V".
  14. 1 2 3 The Congress of the United States. Congressional Budget Office, October 2006, pp. X,1,4,9. "The Apollo Saturn V launch vehicle had a lift capability of 140 metric tons to low Earth orbit."
  15. Wells, Jane (January 26, 2016). "Boeing builds the most powerful rocket ever made". cnbc.com.
  16. "Most powerful rocket ever edges closer to lift-off". gizmag.com.
  17. "NASA's New Mega Rocket Would Be Most Powerful Ever Built". space.com.
  18. "Space Launch System". aerospaceguide.net.
  19. 1 2 "The NASA Authorization Act of 2010". Featured Legislation. Washington DC, United States: United States Senate. July 15, 2010. Retrieved May 26, 2011.
  20. NASA finally sets goals, missions for SLS – eyes multi-step plan to Mars, NASA SpaceFlight
  21. 1 2 Marcia Smith (14 September 2011). "New NASA Crew Transportation System to Cost $18 Billion Through 2017". Space Policy Online. Retrieved 15 September 2011.
  22. Bill Nelson, Kay Bailey Hutchison, Charles F. Bolden (September 14, 2011). Future of NASA Space Program. Washington, D.C.: Cspan.org.
  23. 1 2 3 4 Henry Vanderbilt (15 September 2011). "Impossibly High NASA Development Costs Are Heart of the Matter". moonandback.com. Retrieved 26 January 2012.
  24. "NASA Announces Key Decision For Next Deep Space Transportation System". NASA. 24 May 2011. Retrieved 26 January 2012.
  25. "NASA Announces Design For New Deep Space Exploration System". NASA. 14 September 2011. Retrieved 14 September 2011.
  26. "Press Conference on the Future of NASA Space Program". C-Span. 14 September 2011. Retrieved 14 September 2011.
  27. Kenneth Chang (September 14, 2011). "NASA Unveils New Rocket Design". New York Times. Retrieved 14 September 2011.
  28. 1 2 3 4 Chris Bergin (4 October 2011). "SLS trades lean towards opening with four RS-25s on the core stage". NASASpaceflight.com. Retrieved 26 January 2012.
  29. 1 2 "Acronyms to Ascent – SLS managers create development milestone roadmap". NASASpaceFlight.com. 23 February 2012. Retrieved 9 April 2012.
  30. 1 2 3 4 5 Bergin, Chris. "Advanced Boosters progress towards a solid future for SLS". NasaSpaceFlight.com. Retrieved February 25, 2015.
  31. Karl Tate (16 September 2011). "Space Launch System: NASA's Giant Rocket Explained". Space.com. Retrieved 26 January 2012.
  32. 1 2 Stephen Clark (March 31, 2011). "NASA to set exploration architecture this summer". Spaceflight Now. Retrieved 26 May 2011.
  33. Dwayne Day (November 25, 2013). "Burning thunder".
  34. Thomas P. Stafford (1991). "America at the Threshold - Report of the Synthesis Group on America's Space Exploration Initiative". p. 31.
  35. "NASA's Space Launch System Program PDR: Answers to the Acronym". NASA. 1 August 2013. Retrieved 3 August 2013.
  36. 1 2 "NASA Completes Key Review of World's Most Powerful Rocket in Support". NASA. Retrieved 26 October 2015.
  37. 1 2 Foust, Jeff (August 27, 2014). "SLS Debut Likely To Slip to 2018". SpaceNews.com. Retrieved 2015-03-12.
  38. Sloss, Philip. "NASA ready to power up the RS-25 engines for SLS". NASASpaceFlight.com. Retrieved 2015-03-10.
  39. 1 2 Campbell, Lloyd (25 March 2017). "NASA conducts 13th test of Space Launch System RS-25 engine". SpaceflightInsider.com. Retrieved 29 April 2017.
  40. Chris Bergin (14 September 2011). "SLS finally announced by NASA – Forward path taking shape". NASASpaceflight.com. Retrieved 26 January 2012.
  41. "NASA's Space Launch System Core Stage Passes Major Milestone, Ready to Start Construction". Space Travel. 27 December 2012.
  42. Chris Bergin (April 25, 2011). "SLS planning focuses on dual phase approach opening with SD HLV". NASASpaceflight.com. Retrieved January 26, 2012.
  43. Bergin, Chris (June 16, 2011). "Managers SLS announcement after SD HLV victory". NASASpaceflight.com. Retrieved January 26, 2012.
  44. Priskos, Alex. "Five-segment Solid Rocket Motor Development Status" (PDF). ntrs.nasa.gov. NASA. Retrieved 2015-03-11.
  45. "Space Launch System: How to launch NASA's new monster rocket". NASASpaceFlight.com. 20 February 2012. Retrieved 9 April 2012.
  46. "NASA and ATK Successfully Test Ares First Stage Motor". NASA. 10 September 2009. Retrieved 30 January 2012.
  47. "NASA and ATK Successfully Test Five-Segment Solid Rocket Motor". NASA. 31 August 2010. Retrieved 30 January 2012.
  48. NASA Successfully Tests Five-Segment Solid Rocket Motor, NASA, 31 August 2010, retrieved 8 September 2011
  49. Bergin, Chris (March 10, 2015). "QM-1 shakes Utah with two minutes of thunder". NASASpaceFlight.com. Retrieved March 10, 2015.
  50. Keith Cowing (September 14, 2011). "NASA's New Space Launch System Announced – Destination TBD". SpaceRef. Retrieved January 26, 2012.
  51. Frank Morring (17 June 2011). "NASA Will Compete Space Launch System Boosters". Aviation Week. Retrieved 20 June 2011.
  52. "NASA's Space Launch System: Partnering For Tomorrow" (PDF). NASA. Retrieved 2013-03-12.
  53. Rachel Kraft (February 14, 2013). "NASA Awards Final Space Launch System Advanced Booster Contract". NASA. Retrieved February 19, 2013.
  54. "The Dark Knights – ATK's Advanced Boosters for SLS revealed". 2013-01-14.
  55. "Table 2. ATK Advanced Booster Satisfies NASA Exploration Lift Requirements".
  56. Lee Hutchinson (2013-04-15). "New F-1B rocket engine upgrades Apollo-era design with 1.8M lbs of thrust". Ars Technica. Retrieved 2013-04-15.
  57. "Dynetics reporting "outstanding" progress on F-1B rocket engine". Ars Technica. 2013-08-13. Retrieved 2013-08-13.
  58. Lee Hutchinson (2013-04-15). "New F-1B rocket engine upgrades Apollo-era design with 1.8M lbs of thrust". Ars Technica. Retrieved 2013-04-15.
  59. "Dynetics PWR liquidize SLS booster competition". November 2012.
  60. "SLS Block II drives hydrocarbon engine research". thespacereview.com. January 14, 2013.
  61. "Wind Tunnel testing conducted on SLS configurations, including Block 1B - NASASpaceFlight.com". nasaspaceflight.com.
  62. "Second SLS Mission Might Not Carry Crew". spacenews.com. May 21, 2014. Retrieved July 25, 2014.
  63. 1 2 Rosenberg, Zach. "Delta second stage chosen as SLS interim". Flight International, May 8, 2012.
  64. "Space Launch System Data Sheet". SpaceLaunchReport.com. Retrieved July 25, 2014.
  65. 1 2 "NASA confirms EUS for SLS Block 1B design and EM-2 flight". NASASpaceflight.com. Retrieved 24 July 2014.
  66. 1 2 "SLS prepares for PDR – Evolution eyes Dual-Use Upper Stage". NASASpaceFlight.com. Retrieved 2015-03-12.
  67. Chris Bergin (November 9, 2011). "SLS J-2X Upper Stage engine enjoys successful 500 second test fire". nasaspaceflight.com.
  68. Chris Bergin (February 12, 2013). "Second J-2X engine prepares for SLS testing". nasaspaceflight.com.
  69. Chris Gebhardt (November 13, 2013). "SLS upper stage proposals reveal increasing payload-to-destination options". nasaspaceflight.com.
  70. "SLS design may ditch J-2X upper stage engine for four RL-10 engines - Seradata Space Intelligence". seradata.com.
  71. "Next Steps for SLS: Europe’s Vinci is a contender for Exploration Upper-Stage Engine - Seradata Space Intelligence". seradata.com.
  72. Casey Dreier (July 21, 2014). "A generational opportunity for Europa".
  73. "NASA Researchers Studying Advanced Nuclear Rocket Technologies". space-travel.com.
  74. "NUCLEAR ROCKETS: To Mars and Beyond Nuclear Rockets: Then and Now. LANL".
  75. "How long would a trip to Mars take?".
  76. "How Fast Could (Should) We Go to Mars? Comparing Nuclear Electric Propulsion (NEP) with the Nuclear Thermal Rocket (NTR) and Chemical Rocket for Sustainable 1-year human Mars round-trip mission".
  77. 1 2 "A One-year Round Trip Crewed Mission to Mars using Bimodal Nuclear Thermal and Electric Propulsion (BNTEP) (doi: 10.2514/6.2013-4076)".
  78. Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W. (April 9, 2012). "Nuclear Thermal Propulsion (NTP): A Proven Growth Technology for Human NEO / Mars Exploration Missions" (PDF). NASA.
  79. Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W. (August 16, 2012). "Nuclear Thermal Rocket/Vehicle Characteristics And Sensitivity Trades For NASA's Mars Design Reference Architecture (DRA) 5.0 Study" (PDF). NASA.
  80. "Nuclear Thermal Propulsion (NTP): A Proven Growth Technology for Human NEO / Mars Exploration Missions" (PDF). 2012.
  81. Chris Bergin (24 January 2012). "SLS Exploration Roadmap evaluations provide clues for human Mars missions". NASASpaceflight.com. Retrieved 26 January 2012.
  82. "NASA Researchers Studying Advanced Nuclear Rocket Technologies by Rick Smith for Marshall Space Flight Center, Huntsville AL (SPX) Jan 10, 2013".
  83. SLS Engine Section Barrel Hot off the Vertical Weld Center at Michoud. NASA
  84. "SLS to be robust in the face of scrubs, launch delays and pad stays". NASASpaceFlight.com. 4 April 2012. Retrieved 9 April 2012.
  85. Bergin, Chris (13 May 2015). "QM-1 examinations boost as QM-2 prepares for casting". NASASpaceflight.com. Retrieved 28 June 2016.
  86. Sloss, Philip (27 June 2016). "QM-2: Orbital ATK fires up SLS booster for final qualification test". NASASpaceflight.com. Retrieved 28 June 2016.
  87. "NASA facilities, teams ramp up SLS flight production for 2018 maiden flight". NASASpaceflight.com. Retrieved January 26, 2016.
  88. Davis, Jason. "NASA Budget Lists Timelines, Costs and Risks for First SLS Flight". The Planetary Society. Retrieved 2015-03-11.
  89. "Independent Cost Assessment of the Space Launch System, Multi-purpose Crew Vehicle and 21st Century Ground Systems Programs: Executive Summary of Final Report" (PDF). Booz Allen Hamilton. NASA.gov. 19 August 2011.
  90. Marcia Smith (9 September 2011). "The NASA Numbers Behind That WSJ Article". Space Policy Online. Retrieved 15 September 2011.
  91. "HEFT Phase I Closeout" (PDF). nasawatch.com. September 2010. p. 69.
  92. Chris Bergin (4 October 2011). "SLS trades lean towards opening with four RS-25s on the core stage". NASA Spaceflight.com. Retrieved 16 September 2013.
  93. Lee Roop (July 29, 2013). "NASA defends Space Launch System against charge it 'is draining the lifeblood' of space program". Alabama local news. Retrieved 18 February 2015.
  94. John Strickland (July 15, 2013). "Revisiting SLS/Orion launch costs". The Space Review. Retrieved 18 February 2015.
  95. Administrator, NASA (April 12, 2015). "New Agreement Signed for Orion Service Module". nasa.gov.
  96. "SP-4221 The Space Shuttle Decision- Chapter 6: ECONOMICS AND THE SHUTTLE". NASA. Retrieved 2011-01-15.
  97. "Apollo Program Budget Appropriations". nasa.gov.
  98. Morrison, Lauren; Bale, Lauren (July 24, 2014). "Federal audit reveals not enough money for NASA to get SLS off the ground". 48 WAFF.
  99. Clark, Stephen (2014-12-14). "NASA gets budget hike in spending bill passed by Congress". Spaceflight Now. Retrieved 2014-12-15.
  100. "NASA New Start Inflation Indices". National Aeronautics and Space Administration. Retrieved June 23, 2016.
  101. "FY 2013 Presidents Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-4. Retrieved June 23, 2016.
  102. "NASA, Assessments of Major Projects" (PDF). General Accounting Office. March 2016. p. 63. Retrieved June 23, 2016.
  103. "FY 2014 Presidents Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-8. Retrieved June 23, 2016.
  104. "FY 2015 Presidents Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-5. Retrieved June 23, 2016.
  105. 1 2 3 "FY 2016 Presidents Budget Request Summary," (PDF). National Aeronautics and Space Administration. p. BUD-5. Retrieved June 23, 2016.
  106. "Consolidated Appropriations Act of 2016" (PDF). US Government. p. STAT 2316. Retrieved June 23, 2016.
  107. "FY 2017 Budget Estimates" (PDF). National Aeronautics and Space Administration. p. BUD-4. Retrieved June 23, 2016.
  108. Foust, Jeff (September 16, 2015). "First Crewed Orion Mission May Slip to 2023". SpaceNews.com. Retrieved June 23, 2016.
  109. Clark, Stephen (September 16, 2015). "Orion spacecraft may not fly with astronauts until 2023". spaceflightnow.com. Retrieved June 23, 2016.
  110. Clark, Smith (May 1, 2014). "Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL". spacepolicyonline.com. Retrieved June 23, 2016.
  111. 1 2 "Fiscal Year 2010 Budget Estimates" (PDF). National Aeronautics and Space Administration. p. v. Retrieved June 23, 2016.
  112. "FY 2008 Budget Estimates" (PDF). National Aeronautics and Space Administration. p. ESMD-14. Retrieved June 23, 2016.
  113. "NASA's Ground Systems Development and Operations Program Completes Preliminary Design Review". National Aeronautics and Space Administration. Retrieved June 23, 2016.
  114. 1 2 Ferris Valyn (15 September 2011). "Monster Rocket Will Eat America's Space Program". Space Frontier Foundation. Retrieved 16 September 2011.
  115. "Statement before the Committee on Science, Space, and Technology US House of Representatives Hearing: A Review of the NASA's Space Launch System" (PDF). The Planetary Society. 12 July 2011. Retrieved 26 January 2012.
  116. Rohrabacher, Dana (14 September 2011). "Nothing New or Innovative, Including It's Astronomical Price Tag". Retrieved 14 Sep 2011.
  117. "Rohrabacher calls for "emergency" funding for CCDev". parabolicarc.com. 24 August 2011. Retrieved 15 September 2011.
  118. Jeff Foust (15 September 2011). "A monster rocket, or just a monster?". The Space Review.
  119. Jeff Foust (1 November 2011). "Can NASA develop a heavy-lift rocket?". The Space Review.
  120. Mohney, Doug (21 October 2011). "Did NASA Hide In-space Fuel Depots To Get a Heavy Lift Rocket?". Satellite Spotlight. Retrieved 10 November 2011.
  121. "Propellant Depot Requirements Study" (PDF). HAT Technical Interchange Meeting. 21 July 2011.
  122. Cowing, Keith (12 October 2011). "Internal NASA Studies Show Cheaper and Faster Alternatives to the Space Launch System". SpaceRef.com. Retrieved 10 November 2011.
  123. "Near Term Space Exploration with Commercial Launch Vehicles Plus Propellant Depot" (PDF). Georgia Institute of Technology / National Institute of Aerospace. 2011.
  124. "Affordable Exploration Architecture" (PDF). United Launch Alliance. 2009.
  125. Grant Bonin (6 June 2011). "Human spaceflight for less: the case for smaller launch vehicles, revisited". The Space Review.
  126. Robert Zubrin (14 May 2011). "How We Can Fly to Mars in This Decade—And on the Cheap". Mars Society.
  127. Rick Tumlinson (15 September 2011). "The Senate Launch System – Destiny, Decision, and Disaster". Huffington Post.
  128. Andrew Gasser (24 October 2011). "Propellant depots: the fiscally responsible and feasible alternative to SLS". The Space Review.
  129. Review of U.S. Human Space Flight Plans Committee; Augustine, Austin; Chyba, Kennel; Bejmuk, Crawley; Lyles, Chiao; Greason, Ride (October 2009). "Seeking A Human Spaceflight Program Worthy of A Great Nation" (PDF). NASA. Retrieved 15 April 2010.
  130. Alan Boyle (7 December 2011). "Is the case for Mars facing a crisis?". MSNBC. Archived from the original on January 7, 2012.
  131. John K. Strickland, Jr. "The SpaceX Falcon Heavy Booster: Why Is It Important?". National Space Society. Retrieved 4 January 2012.
  132. "NASA Studies Scaled-Up Falcon, Merlin". Aviation Week. 2 December 2010.
  133. Bergin, Chris (August 29, 2014). "Battle of the Heavyweight Rockets -- SLS could face Exploration Class rival". NASAspaceflight.com. Retrieved 2014-08-30.
  134. "Congressman, Space Frontier Foundation, And Tea Party In Space Call For NASA SLS Investigation". moonandback.com. 4 October 2011. Retrieved 20 October 2011.
  135. "The Senate Launch System". Competitive Space. 4 October 2011. Retrieved 20 October 2011.
  136. "NASA veteran Chris Kraft upfront with criticism". Aug 2013.
  137. "Garver: NASA Should Cancel SLS and Mars 2020 Rover". Space News. Jan 2014.
  138. "Why NASA Still Can’t Put Humans in Space: Congress Is Starving It of Needed Funds". 2015.
  139. "The Space Review: Doubts about depots". thespacereview.com. Aug 2009.
  140. "NASA Considering In-Orbit Fuel Depots". spacesafetymagazine.com. November 6, 2011.
  141. "The Space Review: Doing humans to Mars on—and within—a budget". thespacereview.com. April 2015.
  142. NASA's Marshall Center (April 2, 2015). "NASA’s Space Launch System to Boost Science with Secondary Payloads" via YouTube.
  143. "JPL - Cubesat - NEAScout". nasa.gov.
  144. "Acronyms to Ascent – SLS managers create development milestone roadmap". Retrieved 26 October 2015.
  145. "Additional $1.3 billion for NASA to fund next Mars rover, Europa mission -". thespacereporter.com.
  146. "A Lander for NASA’s Europa Mission". planetary.org.
  147. 1 2 "NASA examines options and flight paths for SLS EM-2 mission | NASASpaceFlight.com". www.nasaspaceflight.com. Retrieved April 26, 2016.
  148. Daines, Gary (December 1, 2016). "First Flight With Crew Will Mark Important Step on Journey to Mars".
  149. "First Crewed Orion Mission May Slip to 2023". SpaceNews.com. Retrieved 26 October 2015.
  150. "NASA's 1st Manned Flight of Orion Space Capsule May Slip to 2023". Space.com. Retrieved 26 October 2015.
  151. "NASA's Human Spaceflight Program Moves Forward - APPEL – Academy of Program/Project & Engineering Leadership". Retrieved 26 October 2015.
  152. "NASA Continues Journey to Mars Planning". www.spacepolicyonline.com.
  153. Foust, Jeff (10 March 2017). "NASA moving ahead with plans for cislunar human outpost". SpaceNews. Pocket Ventures, LLC. Archived from the original on 11 March 2017. Retrieved 11 March 2017.
  154. 1 2 3 4 5 6 7 8 9 "WAAY News". www.waaytv.com.
  155. "NASA Advisory Council: Select a Human Exploration Destination ASAP". Retrieved 26 October 2015.
  156. "NASA Selects Boulder Option for Asteroid Redirect Mission". SpaceNews.com. Retrieved 26 October 2015.
  157. 1 2 "Space Launch Report". spacelaunchreport.com.
  158. 1 2 3 4 5 6 7 8 9 10 11 12 http://www.boeing.com/assets/pdf/defense-space/space/sls/docs/sls_mission_booklet_jan_2014.pdf
  159. 1 2 3 4 5 6 NASA’s Space Launch System: A Capability for Deep Space Exploration
  160. http://www.nasa.gov/pdf/623766main_8143_Singer-AD_industry_day-021312_FINAL3.pdf
  161. "SLS Launch Vehicle specifications take shape as development continues - NASASpaceFlight.com". nasaspaceflight.com.
  162. "Saturn IB". www.astronautix.com.
  163. "Saturn C-3". www.astronautix.com.
  164. Alternatives for Future U.S. Space-Launch Capabilities (PDF), The Congress of the United States. Congressional Budget Office, October 2006, pp. X,1, 4, 9
  165. Thomas P. Stafford (1991), America at the Threshold – Report of the Synthesis Group on America's Space Exploration Initiative, p. 31
  166. 1 2 "Vulcan Centaur and Vulcan ACES - United Launch Alliance". Ulalaunch.com. Retrieved 2016-10-31.
  167. "Eutelsat first customer for Blue Origin’s New Glenn". 2017-03-07. Retrieved 2017-04-05.
  168. Berger, Eric (13 September 2016). "Falcon Heavy? New Glenn? NASA chief says he’s not a "big fan"". Ars Technica. Retrieved 8 December 2016.
  169. 1 2 3 "Falcon Heavy". SpaceX. Retrieved 2017-04-05.
  170. “Study of Large Sea-Launch Space Vehicle,” Contract NAS8-2599, Space Technology Laboratories, Inc./Aerojet General Corporation Report #8659-6058-RU-000, Vol. 1 – Design, January 1963

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.