Siemens C651

Siemens AG (SIE) C651

A C651 train approaching Jurong East Station.
Inside the centre motor car of an unrefurbished Siemens C651 train.
A refurbished Train set 217/218
In service 20 September 1994 - present
Manufacturer Siemens AG
Built at Vienna, Austria
Constructed 1993–1994
Refurbishment Singapore Rail Engineering
2016–2018
Number built 114 Vehicles (19 Trainsets)
Number in service 108 Vehicles (18 Trainsets)
Formation 6 per trainset
DT–M1–M2–M2–M1–DT
Fleet numbers 201/202 ~ 237/238
Capacity 1920 passengers
372/336 seats
Operator(s) SMRT Trains (SMRT Corporation)
Depot(s) Bishan, Changi, Tuas, Ulu Pandan and East Coast(future)
Line(s) served North South Line and East West Line
Specifications
Car body construction Aluminium-alloy double-skinned construction
Car length 23 m (75 ft 5 12 in)
Width 3.2 m (10 ft 6 in)
Height 3.7 m (12 ft 1 58 in)
Doors 1,450 mm (57 116 in), 8 per car
Maximum speed 90 km/h (56 mph) (design)
80 km/h (50 mph) (service)
Weight 35 t (34 long tons; 39 short tons) (unladen)
53.8 t (53.0 long tons; 59.3 short tons) (laden)
Traction system Current: GTOVVVF PWM (Siemens)
Replacement: IGBTVVVF (Toshiba)[1]
Traction motors Current: Three-phase AC induction motor enclosed-ventilated lateral drive
140 kW (190 hp) (Siemens)
Replacement: Permanent Magnet Synchronous Motor (Toshiba)
Power output 2.24 MW (3,000 hp)
Transmission 5.94 : 1 Gear Ratio
Acceleration 1.0 m/s (3.3 ft/s)
Auxiliaries 110 V DC
Electric system(s) 750 V DC third rail
Current collection method Collector Shoe
UIC classification 2'2' + Bo'Bo' + Bo'Bo' + Bo'Bo' + Bo'Bo' + 2'2'
Braking system(s) 1st service brake: Self-excited, mixed service and resistor brake
2nd service brake: Pneumatic compressed air wheel tyre block brake
Parking brake: Compressed air pressure spring-loaded brake
Safety system(s) Current: Westinghouse Fixed Block ATC with subsystems of ATO GOA 2 (STO), ATP and ATS[2]
Thales SelTrac® Moving Block CBTC, ATC with subsystems of ATO GOA 3 (DTO), ATP, NetTrac ATS, CBI[3]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Siemens C651, sometimes abbreviated to C651 or SIE C651 is the second generation Electric multiple unit rolling stock in operation on the North South and East West Lines of Singapore's Mass Rapid Transit (MRT) system. A total of 114 cars consisting of 19 train-sets were purchased in 1993 and introduced from 1994 onwards and were built by Siemens in Austria.

Overview

The C651 trains are the second generation of train cars used on the SMRT network. It had ordered $259million for the C651 cars. They were bought mainly to complement the existing C151 trains due to the opening of the Woodlands extension. These trains began revenue service in 1994 as the first train-set rolled out of Singapore plant to increase capacity on 17 July 1994 and delivered to SMRT on 20 September 1994. Unlike its older counterparts, the C651s are painted with a scratch-resistant acrylic finish due to dirt trapping on the aluminum skin of the C151 trains that were difficult to remove.

These train cars are fitted with green-blue tinted Glastroch (Germany) windows glass, and are almost identical to the first generation train cars before its refurbishment, except that its traction produces a louder, lower-pitched noise when accelerating/braking. The run number display on the front of each train is made up of electronic green flip-dot display, as opposed to the manual plastic rollers of the Kawasaki Heavy Industries C151 trains, while the rubber strips between the doors are thicker. The trains have a full white body and a thick red stripe in the middle. Similar to the Kawasaki Heavy Industries C151 trains, the Siemens C651 trains have no visual passenger information systems, but have a built-in audio announcement system until the STARIS was installed and activated around 2010.

The C651 trains were originally delivered with a GTO-VVVF propulsion system that was supplied by Siemens. A virtually identical propulsion system would later be used on the Keikyu 2100 series and the JR East E501 series trains.

Operational details

Many experimental programmes have been run on the C651 cars, including the past program.

For the past program, the third and fourth cars, coloured in green were even more radical in the reconfiguration, with all but eight parts of seats, four at each ends of the car removed completely. In its place was standing room with upholstered cushion, in an attempt to provide a degree of comfort to passengers standing in that space. This design proved to be unpopular with the commuters, and it was eventually dropped. The original seats between the 1st and 2nd door, and the 3rd and 4th door on these cars have been replaced. The remaining upholstered seats were reverted to original seats in May 2006. All C151 trains had their seats on the middle part of carriage removed.

For now, some trains of this type were reconfigured to have more standing space in the late 1990s as part of an experimental programme. In particular, the second and fifth cars (the blue cars) were reconfigured to have more standing room on both sides, as 3 seats from some later cars.

More grabpoles were also added. Regular grabpoles in the centre of each car were replaced by grabpoles that branch out into three in the centre first in 2007, followed by triplicated hand grips and grab poles in 2014. Special non slip floorings were also tested.

Refurbishment

A refurbished Train set 217/218

Refurbishment contract for these trains have been awarded to Singapore Rail Engineering (SRE). When completed, these upgrades will address train components such as doors and brakes that have been the primary cause of delays owing to train faults. The changes will include re-signalling, refurbishing the propulsion system, air-conditioning system, auxiliary power system, interior saloon with modifying handrails and exterior of the trains. Upgraded trains will also have sensors that carries vital information on the train’s state of health for improved operation and maintenance of the train set. [4][5]

Refurbishment works has begun since early 2016, beginning with train set 217/218. It will also include STARIS version 2.0, of which it will consist of the dynamic route map displays. The first refurbished train set is expected to undergo dynamic tests and commence revenue service in late mid 2017.[6] As of late August 2016, 2 prototype train cars have been built by SRE for evaluation, signalling that the project is unaffected by termination of the End-of Life Refurbishments for the 66 C151 train sets.[7]

Train Formation

Exterior view of the C651 cars at Tanah Merah before HHPSDs installations.

The configuration of a C651 in revenue service is DT-M1-M2-M2-M1-DT

Cars of C651
car type Driver Cab Motor Collector Shoe car length Wheelchair Space
mm ft in
DT 23,650 77 ft 7 in
M1 22,800 74 ft 10 in
M2 22,800 74 ft 10 in

The car numbers of the trains range from x201 to x238, where x depends on the carriage type. Individual cars are assigned a 4 digit serial number. A complete six-car trainset consists of an identical twin set of one driving trailer(DT) and two motor cars(M1 & M2) permanently coupled together. For example, set 221/222 consists of carriages 3221, 1221, 2221, 2222, 1222 and 3222.

References

  1. Hoe, Pei Shan (5 July 2013). "Older MRT trains to get new motors from Japan". Straits Times. Retrieved 13 May 2015.
  2. Dhaliwal, Rav (28 April 1987). "Getting to know the how it will work". Straits Times. p. 19.
  3. Fang, Joy (2 February 2012). "Coming: $600m upgrade for MRT system/New train measures a ‘catch-up’". My Paper. pp. A2, A6. Retrieved 13 May 2015.
  4. "Older SMRT trains to get makeover for better ride". The Straits Times. 2013-05-15.
  5. http://www.smrt.com.sg/DoingBusiness/SingaporeRailEngineering/LocalProjects.aspx Siemens Trains Mid-Life Upgrading Project
  6. "SMRT engineering subsidiary eyes international expansion" (PDF). smrt.com.sg. SMRT Co. Ltd. Retrieved 17 July 2016.
  7. "Your Journey Matters - Edition 2 (August 2016)" (PDF). Your Journey Matters_SMRT. SMRT Corp Ltd. 26 August 2016. Retrieved 4 October 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.