Shenzhen Metro

Shenzhen Metro
    
Overview
Locale Shenzhen
Transit type Rapid transit
Number of lines Eight (as of 2017): 1, 2, 3, 4, 5, 7, 9, 11
Number of stations 199[1]
Daily ridership

3.9 million (2016)

5.06 million (2017 Peak)[2]
Annual ridership 1.297 billion (2016)[3]
Website SZMC (Shenzhen Metro Group)
MTR Corporation (Shenzhen) (Chinese only)
Operation
Began operation 28 December 2004
Operator(s)
Technical
System length 286.2 km (177.8 mi)[4]
Track gauge 1,435 mm (4 ft 8 12 in) (Standard Gauge)
System map

Shenzhen Metro
Traditional Chinese 深圳地鐵
Simplified Chinese 深圳地铁
Cantonese Yale Sàmján Dèihtít
Cantonese Jyutping Sam1zan3 Dei6tit3
Hanyu Pinyin Shēnzhèn Dìtiě

The Shenzhen Metro (simplified Chinese: 深圳地铁; traditional Chinese: 深圳地鐵; pinyin: Shēnzhèn Dìtiě; Jyutping: sam1 zan3 dei6 tit3) is the subway or underground system for the city of Shenzhen in Guangdong province, China. The system opened on 28 December 2004, making Shenzhen the sixth city in mainland China to have a subway after Beijing, Tianjin, Shanghai, Guangzhou and Wuhan. The Shenzhen Metro currently has eight lines, 166 stations, and 286 kilometres (178 miles)[4][1] of total trackage in operation. The network underwent rapid expansion prior to the 2011 Summer Universiade, opening 110 km (68 mi) of tracks in June 2011.[5] The system underwent another major expansion with the opening of Line 11 in June 2016 and both Lines 7 and 9 in October 2016 shortly making the system the third longest in China before Guangzhou Metro regained the position in December 2016.[6] Two new lines and extension of several existing lines are underway with a long term goal of and 1,124 kilometres (698 miles) of lines by 2030.[7] In February 2017, the government announced that work on four new metro lines (Lines 12, 13, 14, and 16) would start in 2017 at a cost of 160 billion Yuan.[8]

Current system

The current system has eight lines and provides a relatively fast and economical way of travelling in Shenzhen compared to buses and taxis. Line 1 and Line 4 run to the border crossings between the Shenzhen Special Economic Zone and the Hong Kong Special Administrative Region at Luohu/Lo Wu and Futian Checkpoint/Lok Ma Chau, where riders can transfer to Hong Kong's MTR East Rail Line for travel onward to Hong Kong.

Line Terminals
(District)
Opened Latest
extension
Length
km
Stations Operator
 1  Luohu
(Luohu)
Airport East
(Bao'an)
2004 2011 41.04 30
 2  Chiwan
(Nanshan)
Xinxiu
(Luohu)
2010 2011 35.78 29
 3  Yitian
(Futian)
Shuanglong
(Longgang)
2010 2011 41.66 30
 4  Futian Checkpoint
(Futian)
Qinghu
(Longhua)
2004 2011 19.96 15
 5  Qianhaiwan
(Nanshan)
Huangbeiling
(Luohu)
2011 40.00 27

 7 

Xili Lake
(Nanshan)
Tai'an
(Luohu)
2016 30.3 28

 9 

Hongshuwan South
(Nanshan)
Wenjin
(Luohu)
2016 25.33 22

 11 

Futian
(Futian)
Bitou
(Bao'an)
2016 51.94 18
Total 286.2 199

Line 1

Line 1 formerly known as the Luobao Line runs westward from Luohu to Airport East. Trains operate every 2 minutes during peak hours and every 4 minutes at other times. The line is operated by SZMC (Shenzhen Metro Group).

Line 2

Line 2 formerly known as the Shekou Line runs from Chiwan to Xinxiu. It connects with Line 1 at Window of the World, with Line 4 at Civic Center, with Line 3 at Futian and with Line 1 again at Grand Theater. The line is operated by SZMC (Shenzhen Metro Group).

Line 3

Line 3 formerly known as the Longgang Line runs from Yitian to Shuanlong in Longgang, in the north-east part of the city. Construction began on 26 December 2005.[11] The line is operated by Shenzhen Metro Line 3 Operations, which has been a subsidiary of SZMC (Shenzhen Metro Group) since 11 April 2011 when an 80% stake was transferred to SZMC.

Line 4

Line 4 formerly known as the Longhua Line runs northward from Futian Checkpoint to Qinghu. Trains operate every 2.5 minutes at peak hours and every 6 minutes during off-peak hours. Stations from Futian Checkpoint to Lianhua North are underground. The line has been operated by MTR Corporation (Shenzhen), a subsidiary of MTR Corporation, since 1 July 2010.

Line 5

Line 5 formerly known as the Huanzhong Line runs from Qianhaiwan in the west to Huangbeiling in the east. Construction began in May 2009 and the line opened on 22 June 2011.[13] Line 5 required a total investment of 20.6 billion RMB. The line is operated by SZMC (Shenzhen Metro Group).

Line 7

Line 7 of the Shenzhen Metro opened on 28 October 2016, with a length of 30.3 km and a total of 28 stations. It connects the Xili Lake to Tai'an. The line travels East–West across Shenzhen in a "V" shape. The line is operated by SZMC (Shenzhen Metro Group).

Line 9

Line 9 of the Shenzhen Metro opened on 28 October 2016. The line runs eastward from Hongshuwan South to Wenjin. It has 10 transfer stations. The line is 25.33 km long, running through the districts of Nanshan, Futian and Luohu. The line is operated by SZMC (Shenzhen Metro Group).

Line 11

Line 11, also known as the Airport Express, runs from Bitou in the north-east to Futian in the city centre via Shenzhen Bao'an International Airport. Construction began in April 2012 and the line opened on 28 June 2016. Line 11 runs at a higher speed of 120 km/h. The line is operated by SZMC (Shenzhen Metro Group).

Ridership

Annual Ridership
Yearmillion riders±% p.a.
2005[14] 58    
2006[15] 90+55.17%
2007[16] 118+31.11%
2008[17] 136+15.25%
2009[18] 138+1.47%
2010[19] 163+18.12%
2011[20] 460+182.21%
2012[21] 781+69.78%
2013[22] 914+17.03%
2014[23]1,037+13.46%
2015[24] 1,122+8.20%
2016[3]1,297+15.60%

Since the opening of the first phase in 2004, there has been a steady growth in passenger traffic. In 2009 and 2010, passenger traffic soared with major openings of new phase 2 lines, with a three-fold increase in passenger traffic in 2010.[25] The maximum daily passenger record was 4.17 million passengers.

July is the busiest month of the year for the Shenzhen Metro, accounting for 9.3% of annual passenger traffic, while January is the least busy month, accounting for only 6.7%. This is caused by Shenzhen's large migrant worker population.[26]

History

Evolution of the Shenzhen metro

Early planning

In late 1983, Party Secretary of Shenzhen Mayor Liang Xiang led a team to Singapore to study its mass transit system. Upon returning it was decided that 30 meters on each side of Shennan Avenue should be protected as a green belt, and to set aside a 16-meter wide median reserved for a light rail or light metro line.[27] In 1984, the "Shenzhen Special Economic Zone Master Plan (1985–2000)" pointed out that, with the growing population and traffic in Shenzhen, a light metro system would not have sufficient capacity to meet future demand. Instead the report proposed a heavy rail subway line to be built along Shennan Avenue.[28] The project was finally approved by the Central Planning Department in 1992.[29]

In August 1992, during and re-feasibility and rail network planning, The Shenzhen Municipal Government decided to move from building a light metro line to a heavy rail subway line. The rapid growth of Shenzhen City made a lower capacity light metro line impractical.[30] In 1994, Shenzhen organized the preparation of the "Shenzhen urban rail network master plan" to be incorporated into the "Shenzhen City Master Plan (1996–2010)".[31] The city's vision for an urban rail network would consists of nine lines. Of the nine transit lines, three of them would be commuter rail lines upgraded from existing national mainline railways. The total length of the proposed network would be about 270 km. The three upgraded commuter rail lines would overlap the Guangzhou–Shenzhen Railway, Pinghu–Nanshan Railway and Pingyan railway.[31] This plan established the basic framework for the Shenzhen Metro network.[32]

Construction suspended and restarted

In December 1995, the State Council issued the "moratorium on approval of urban rapid transit projects" to suspend approval of rail transit projects in all Chinese cities except Beijing, Shanghai, and Guangzhou. The Shenzhen Metro project was postponed.[33] In 1996, prior to the handover of Hong Kong, authorities attempted to restart construction by renaming the project "The Luohu, Huanggang / Lok Ma Chau border crossing passenger rail connection project", stressing that the project is designed to meet the potential growing demand for cross-border passenger traffic after the handover.[31]

In 1997, Shenzhen reapplied its Subway plans to the State Planning Commission, and received approval in May 1998.[30] The project was renamed the "Shenzhen Metro first phase".[34] On July 1998, SZMC (Shenzhen Metro Group). was formally established.[34] By April 1999, the subway project feasibility study report has been approved by the state.

Phase I (1998-2004)

Construction of the first sections of Line 1 and Line 4 began in 1999. The grand opening of the Shenzhen Metro system occurred at 5:00pm on Tuesday, December 28, 2004. Initially the trains operated at 15-minute frequencies and consisted of Line 1 services between Luohu and Shijie Zhi Chuang (now Window of the World) and the Line 4 services between Fumin and Shaonian Gong (now Children's Palace). Initially the English names of the stations were rendered in Hanyu Pinyin, but some of the names were changed to English translation with American spelling in mid-2011.

The Futian Checkpoint station opened on 28 June 2007 using the name Huanggang.[35]

Name Changes

On April 23, 2008, Shenzhen Municipal Planning Bureau announced that it would change the nomenclature of Shenzhen's subway lines according to the "2007 Urban Rail Transit Plan Scheme". Instead of using numbers as the lines official designation, as typically used in other mainland Chinese metro systems, lines would be given Chinese names more akin to the Hong Kong MTR.[36] In 2010, the Scheme was reviewed and adjusted with new routes and names in addition to newly proposed lines. On 23 October 2013, SZMC (Shenzhen Metro Group) combined both the number with the name for the current operational lines and the future lines will be in number only.[37] Due to the construction order changed, some numerical names has been reviewed in order to prevent big jump between numbers. Since 2016, only numerical names have been used.

Lines currently in operation:

Original No. 2007 Scheme 2010 Scheme Current name
Line 1 Luobao Line Luobao Line Line 1
Line 2 Shekou Line Shekou Line Line 2
Line 3 Longgang Line Longgang Line Line 3
Line 4 Longhua Line Longhua Line Line 4
Line 5 Huanzhong Line Huanzhong Line Line 5
Line 6 Guangming Line Guangming Line Line 6
Line 7 Xili Line Xili Line Line 7
Line 9 Neihuan Line Meilin Line Line 9
Line 11 Airport Line Airport Line Line 11

Lines under construction:

Original No. 2007 Scheme 2010 Scheme Current Name
Line 8 Yantian Line Yantian Line (Line 8) Line 2 Extension (Line 8 Phase 1)
Line 16 Pinghu Line Bantian Line (Line 16/Line 10) Line 10
Line 10 Bao'an Line Nanbao Line (Line 10/Line 12) Line 12
Line 15 Shiyan Line Shiyan Line (Line 15/Line 13) Line 13
Line 14 Eastern Express Eastern Express (Line 14) Line 14
Line 12 Pingshan Line Longping Line (Line 12/Line 16) Line 16
- - Fuyong Line (Line 20) International Expo Conveyance Project (Line 20)

Phase II (2007-2011)

From 2004 to 2007, there was a lack of official government interest and attention to expanding the subway after completion of Phase 1 with little or no active projects.[38] Subway construction speed was ridiculed as "earthworm speed".[39] In January 17, 2007 Shenzhen won the right to host the 2011 Universiade. In the bid Shenzhen committed to complete 155 km of subway lines before the games.[38] The mayor of Shenzhen at the time, Xu Zongheng, sharply criticized the speed and efficiency of Shenzhen's subway construction procedures and calls for reform.[40] Subsequently, the Shenzhen municipal government and various departments signed a liability form, requiring Phase II subway expansion to be completed in time for the Universiade.[41] Shenzhen Metro increased to over a hundred operating metro stations in June 2011, just before the Shenzhen Universiade games. In the span of two weeks, the network expanded from 64 km to 177 km. This expansion increased rail transit's share of total public transit trips from 6% to 29% in 2014.[23]

Date Opened
Line
Termini
Length
in km
Stations
28 September 2009
  Line 1
- section 2 (trial)
Window of the World Shenzhen University 3.39 3
28 December 2010
  Line 2
- phase 1
Chiwan Window of the World 15.1 12
  Line 3
- phase 1 section 1
Shuanglong Caopu 25.6 16
15 June 2011
  Line 1
- section 2
Shenzhen University Airport East 23.6 12
16 June 2011
  Line 4
- phase 2
Children's Palace Qinghu 15.9 10
22 June 2011
  Line 5
Qianhaiwan Huangbeiling 40.0 27
28 June 2011
  Line 2
- east extension
Window of the World Xinxiu 20.65 17
  Line 3
- phase 1 section 2
Caopu Hongling 7.72 6
  Line 3
- west extension
Hongling Yitian 8.8 8

Phase III (2012-2020)

In 2010, the Shenzhen Urban Planning and Land Resources Committee proposed a building program (Phase III) between 2011 and 2020. In 2011 this plan was approved by the NDRC. Phase III formally commenced in May 2011 with an expected cost of 125.6 billion yuan. It will cover Lines 6, 7, 8, 9, and 11 and will extend the length of the Shenzhen Metro to 348 kilometres and 10 lines.[42][43] In June 2011, the Shenzhen Urban Planning and Land Resources Commission started gather public input on Phase III station names.[44] On June 30, 2016 Line 11 opened being the first subway line in Shenzhen with 8 car trains and 120 km/h maximum service speed and the first in China with a First Class service. Lines 7 and 9 followed on October 28, 2016 bringing the length of the Shenzhen Metro to 285 km and the third longest in China.

Expansion plans

Phase III Revised Expansion

Anticipated development and growth in Longgang has prompted officials to fast track the planning and construction of Line 10 (formerly Line 16), from Futian Free Trade Zone to Pinghu via Meilin, to start in 2015 instead of after 2020.[45][46][47] Although Line 10 is not part of the original three projects (Lines 7, 9 and 11) approved by the National Development and Reform Commission, the project was fast tracked in order to ease the pressure on Line 4 and accommodate further growth of the Longgang area.[48][49] According to the original plan, the northern section of Line 10 runs through Fenggang town of the neighboring Dongguan City. Due to legal and government coordination problems, Line 10 will temporarily terminate in Pinghu, with capability to extend further north into Dongguan.[50] In addition, extension projects of Line 2, 3, 4, 5, 6 and 9, a total of 83.9 km of new subway, were added to the revised plan.[51] The first phase of Line 20 was fast tracked from Phase IV to provide a shuttle between Line 11 and a new International Convention Center. The project is only 8.36 km long and will be completed by 2018.[52]

Expected Opening
Line
Expected Terminals
Expected Length
in km
Expected Stations
Current Status
2017 (structural works only, actual opening time TBC)
  Line 5
south extension
Qianhaiwan Chiwan 8.6 7 Under construction[53]
2018
  Line 20
Airport North Station International Conference Center 8.36 5 Under construction[52][54]
2019
  Line 6
Shenzhen North Songgang 37.9 20 Under construction[55][56][57][58]
  Line 10
Futian Checkpoint Pinghu Center 29.9 23 Under construction[56][59][60]
2020
  Line 2
east extension 2
Xinxiu Liantang 3.82 3 Under construction[61][62][63]
  Line 3
south extension
Yitian Baoshuiqu 1.5 1 Under construction[62][64]
  Line 3
east extension
Shuanglong Liulian 9.4 6 Under construction[62][63][65]
  Line 9
west extension
Hongshuwan Hanghai Road 10.8 8 Under construction[62][63][66][67]
  Line 4
north extension
Qinghu Niuhu 10.6 8 Under construction[62][63][68]
  Line 6
south extension
Shenzhen North Science Museum 11.5 6 Under construction[62][63]
  Line 8
Yantian Road Kuichong Cultural Plaza 24 12 Under study, monorail preferred, construction may start in 2016[69]
A map with Third phase lines.

Network Phase 4 expansion

With the shortening of the Phase III implementation period,[70] a number of lines (Lines 16 and 12) planned in 2007's Phase III moved into the next phase which could possibly be completed by 2020.[71] By 2016, it was determined that Phase 4 will have an implementation period between 2017 and 2022 and consist of 274 km of new subway.[72] In addition, a branch line of Line 6 will connect with the neighbouring Dongguan Rail Transit system.[73]

Expected Opening
Line
Expected Terminals
Expected Length
in km
Expected Stations
Current Status
Before 2022
  Line 6
Branch
Lilin Sun Yat-sen University TBC TBC Construction starting in 2017[73]
  Line 8
Phase 2
Xiaomeisha Dapeng TBC TBC Planned
  Line 10
East Extension
Futian Checkpoint Futian Free Trade Zone TBC TBC Planned
  Line 11
East Extension
Futian Huangbeiling Station TBC TBC Planned
  Line 12
Taiziwan New Exhibition Center North 20.7 TBC Construction starting in 2017[74]
  Line 13
Shenzhen Bay Checkpoint Gongming Square 38.6 TBC Construction starting in 2017[73]
  Line 14
Huangmugang Pingdi / Kengzi 67.5 TBC Construction starting in 2017[75]
  Line 15
Dachan Bay Mawan TBC TBC Planned
  Line 16
Universiade Xinqiao Industrial Zone 27.8 TBC Planned
  Line 17
Luohu Pinghu 28.7 24 Construction starting in 2017[76]
A map of Shenzhen Metro lines after Phase IV completion.

Long-term plan

In the Shenzhen Metro 2007 masterplan proposed four more lines (Lines 13, 14, 15 and 16) which have a planned completion target of 2030.[77] In 2012, four further lines Qiannan (Line 17), Pinghu (Line 18), Pingshan (Line 19) and Fuyong (Line 20) where unveiled. This brings the total planned length of the Shenzhen Metro to 720 km spread out over 20 lines. Aside from the set masterplan, at the 12th Guangdong Provincial People's Congress in January 2014,[78] it was proposed to extend Line 4 beyond the planned Phase III terminus at the Songyuan Bus Terminal in Guanlan. The proposal wanted to further extend this line to reach the future planned Dongguan Metro Line 4 at Tangxia station. This proposal aims to shorten the distance between the two cities in residents' minds, boost tourism industries in both cities and expand housing options. It would also allow for direct connection between Hong Kong and Dongguan. As the area in the proposed area is less developed, the cost in building the line is expected to be reasonable, with a feasibility study yet to be conducted. In addition to metro lines, 5 Pearl River Delta Rapid Transit lines connecting neighboring urban centers in the Pearl River Delta such as Dongguan, Huizhou, Foshan and Guangzhou, totaling 146 km, have also been revealed.[79] In 2016, an even more ambitious masterplan, expanding the previously planned 20 lines to 32, was unveiled. The new plan envisions a 1142 km subway network to be completed by 2030. This will allow for travel between the central and suburban districts to be shortened to 45 minutes and for public transit to make up more than 70% of all motorized trips in Shenzhen.[7]

Expected opening
Line
Expected terminals
Expected length
in km
Expected stations
Current status
After 2022 Bao'an-Longgang Line Shiyan Buji East TBC TBC Planned
107 Line Hongshuwan South Xitou TBC TBC Planned
Sungang Line Laojie Mawan TBC TBC Planned
Central Axe Line Shangsha Guanlan North TBC TBC Planned
Nanshan - Longgang(Longhua) Line TBC TBC TBC TBC Planned
Map of Shenzhen Metro in 2030 (lines 17– 32 not included due to lack of available information)

Fares and tickets

Metro rides are priced according to distance travelled, and fares vary from 2 RMB to 14 RMB.[80] Since December 2010 fares are based on a usage fee (2 RMB) + a distance fee. The distance fee is 1 RMB for each 4 km from 4 km to 12 km; after that 1 RMB for each 6 km from 12 km to 24 km and finally 1 RMB for every 8 km over 24 km distance.[81] For passengers who wish to ride on business coach in line 11, they have to pay 3 times the amount of price that calculated by the regulations above.

Distance (km) Fares (RMB) [82]
0~12 1+1/per 4km
12~24 5+1/per 6km
over 24 7+1/per 8km

Children under the height of 120 cm or aged below 6 may ride for free when accompanied by an adult.[83] The metro also offers free rides to senior citizens over the age of 65, the physically disabled and military personnel. Tickets for children between 120 cm and 150 cm, or aged between 6 and 14 years, or middle school students, are half priced.

Metro fares can be paid for with single-ride tokens, multiple-ride Shenzhen Tong cards or 1- day passes.[84]

Tokens

When using cash, a RFID token (NXP Mifare Classic) is purchased and used for a single, non-returnable journey. There are two different types of tokens that showing in yellow or green color. Yellow RFID tokens is used for business coach of line 11 only. All ticket vending machines offer both English and Chinese interface. The purchaser touches a station name to calculate the fare. After payment, a green token is dispensed, which must be scanned at the entrance station and deposited at the exit station. A penalty fare applies should a token be lost. Also, people who purchased Green tokens will NOT ALLOWED to take the business coach in line 11 directly. Instead, they must get off at any transfer stations with line 11 and purchase a separate yellow token in order to ride the business coach.

Note that as of 2015 many machines accept only 5 or 10 RMB notes. The token(s) are only valid at the station where issued. Passengers are unable to buy an extra token for return journey prior to departure. Baggage X-Ray machines are located at each station, and may be manned during peak hours.

Shenzhen Tong cards

Shenzhen Tong is similar to the Octopus card system used on the MTR rail lines in Hong Kong. The multiple fare card stores credit purchased at stations. The card can be used by waving it in front of the card reader located at all entrances and exits to the subway system. Riders who pay for metro fare with a card receive a 5% discount. Since March 1, 2008, riders who pay for a bus fare with a card and then a subway fare within 90 minutes receive an additional 0.4 RMB discount on the subway fare. Card users pay a distance based fare.

Since June 30, 2011, cards containing both a Shenzhen Tong and Hong Kong Octopus chip have been available in both Shenzhen and Hong Kong. There are plans to further integrate the two systems, and for a new card which will be accepted all over Guangdong province and China's two SARs.[85][86]

Unlike Hong Kong Octopus Cards, Shenzhen Tong cards cannot be sold back to the stations or have faults dealt with by SZMC. Instead, the customer must go to the offices of Shenzhen Tong. Students studying in Shenzhen can use the Shenzhen Tong to receive a 50% discount.

Note that all sorts of discounts will not applicable for people who wish to ride business coach in line 11.

Metro 1-day passes

Metro 1-day pass is a smart card that allowed the card holder have unlimited access of the metro system in 24 continuous hours. Passengers can purchase an 1-day pass for RMB 20 in the service center in any metro station. The pass will be activated and the passenger will have 24 continuous hour for unlimited access after the first entrance. When the pass expired, the pass is no longer available for entering a station but able to exiting a station and finish a journey in 27.5 hours. The 1-day passes are not applicable for business coach in line 11.

Station facilities, amenities and services

Some stations have toilets (free of charge), and public telephones. SZMC also operates luggage storage facilities in the concourse above Luohu Station. Mobile phone service is available throughout the system provided by China Mobile, China Telecom, and China Unicom.[87]

Like the Hong Kong MTR, Guangzhou, and Foshan metros, station announcements are in Mandarin, Cantonese and English. Some announcements, such as train arrival, are in Mandarin and English only. Cantonese, an important local language, is chosen for the local Cantonese population as well as Cantonese speakers in the Canton (Guangdong) province, Hong Kong and Macau.

Equipment

Rolling Stock

Bombardier rolling stock on Line 1

Line 1

Line 2

Line 3

Line 4

Line 5

Line 7

Line 9

Line 11

Signalling system

On Line 1 and Line 4, Siemens Transportation Systems supplied 7 (Phase 1) and 6 (Phase 2) LZB 700 M continuous automatic control systems; 7 (Phase 1) and 6 (Phase 2) electronic Sicas ESTT interlockings; the Vicos OC 501 operations control system with 2 operations control centers, fall-back level with Vicos OC 101 and RTU (FEP), 230 (Phase 1) and 240 (Phase 2) FTG S track vacancy detection units.[88]

Line 2 and Line 5 use Casco CBTC system with 2.4 GHz frequencies, and so the system has suffered frequent problems with interference from consumer Wi-Fi equipment.[89] By the end of November 2012, CASCO solved the problem on Lines 2 and 5 by switching to their standard solution with frequency diversity on 2 different channels.

See also

References

  1. 1 2 "Shenzhen Metro". exploremetro. Retrieved May 27, 2014.
  2. "厉害了我的深圳地铁!单日客流达506万人次"". 读特. 2017-05-02.
  3. 1 2 "2016年交通运输运营指标统计年报" (in Chinese). 深圳市交通运输委员会. 2017-02-06.
  4. 1 2 深圳市统计局 (December 2, 2008). "深圳市2011年国民经济和社会发展统计公报".
  5. ""【深圳】2011年地铁达177公里 长过香港地铁" 星岛网讯" (in Chinese). Archived from the original on 2013-09-23.
  6. UK, DVV Media. "Shenzhen Metro adds two lines". Railway Gazette. Retrieved 2016-10-30.
  7. 1 2 "关于地铁2号线东延线、地铁3号线西延线线站位初步方案" (PDF).
  8. "WORK ON 4 NEW METRO LINES TO START THIS YEAR". Shenzhen Daily. 9 February 2017. Retrieved 9 February 2017.
  9. Shenzhen Metro Line 1, from Luohu to Airport East was put into a trial operation
  10. photo of ongoing construction in Shekou
  11. (Chinese) Wang, Xiaoqing (王晓晴) and Qiu, Gang (邱刚), "深圳地铁3号线动工 2009年建成通车" southcn.com December 27, 2005
  12. (Chinese) 深圳地铁3号线规划线路图 August 21, 2008
  13. (Chinese) Wang, Xiaoqing (王晓晴) "深圳地铁5号线全面开工" Xinhua September 19, 2008
  14. 深圳市统计局. "2005年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Chinese). Archived from the original on January 25, 2013.
  15. 深圳市统计局 (December 2, 2008). "深圳市2006年国民经济和社会发展统计公报" (in Chinese).
  16. 深圳市统计局 (December 2, 2008). "深圳市2007年国民经济和社会发展统计公报" (in Chinese).
  17. 深圳市统计局 (March 24, 2009). "深圳市2008年国民经济和社会发展统计公报" (in Chinese).
  18. 深圳市统计局 (April 27, 2010). "深圳市2009年国民经济和社会发展统计公报" (in Chinese).
  19. 深圳市统计局 (April 28, 2011). "深圳市2010年国民经济和社会发展统计公报" (in Chinese).
  20. 深圳市统计局. "2011年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Chinese). Archived from the original on December 4, 2012.
  21. "深圳地铁客流量 去年猛增近七成" (in Chinese). 深圳商报. January 10, 2013.
  22. "深圳市2013年国民经济和社会发展统计公报" (in Chinese). 深圳市统计局. April 8, 2014.
  23. 1 2 "2014年度全市交通运输运营主要概况及分析" (in Chinese). Retrieved January 16, 2015.
  24. 深圳市交通运输委员会 (2016-01-19). "2015年12月交通运输运营指标统计月报".
  25. 杨丽,杨德明 (2012). "深圳市城市轨道交通网络化客流变化研究". 现代城市轨道交通 (in Chinese). 6.
  26. 陈煜 (2011). "深圳地铁运营对轨道交通客流预测的启示". 铁道工程学报 (in Chinese). 8.
  27. 彭森 (August 21, 2005). "从7米到140米——深南大道的宽度之谜" (in Chinese). 深圳晚报.
  28. 深圳经济特区总体规划简介[J]. 城市规划,1986,06:9–14.
  29. 深圳市地铁有限公司 (2007). 深圳地铁一期工程建设与管理实践.上册 (in Chinese). 北京: 人民交通出版社. ISBN 978-7-114-06262-9.
  30. 1 2 "深圳地铁十年始获"出生证"" (in Chinese). 深圳新闻网. June 22, 2011.
  31. 1 2 3 张家识 (1999). "深圳地铁一期工程建设前期工作回顾". In 陈锡贤. 地下铁道文集:中国土木工程学会隧道及地下工程分会地下铁道专业委员会第十三届学术交流会论文选 (in Chinese). 深圳: 海天出版社. ISBN 7-80615-959-2.
  32. "深圳地铁网络框架15年前基本敲定" (in Chinese). 深圳特区报. June 25, 2011.
  33. "深圳地铁"十年怀胎"终圆梦". 深圳特区报. 2010-04-10.
  34. 1 2 "深圳地鐵一期工程主要里程碑時間" (in Chinese). 深圳新闻网. Archived from the original on 2012-12-02.
  35. "深圳地铁皇岗站正式开通" (in Chinese). Archived from the original on 2007-09-30. Retrieved 2007-07-01.
  36. "關於我市近期建設地鐵線路及站點命名的通告" (in Chinese). Retrieved 2012-11-22.
  37. "New Line Naming Scheme". Shenzhen Metro Group Official Weibo. Shenzhen Metro Group. Retrieved October 23, 2013.
  38. 1 2 "地铁不如期完工,我主动请求处分". 南方日报. 2007-02-01.
  39. "网友声讨"进度慢",市长强调"拖不起",地铁建设"蚯蚓速度"". 南方日报. 2007-01-19.
  40. ""地铁不如期完工,我主动请求处分"_新闻中心_新浪网". news.sina.com.cn. Retrieved 2016-10-30.
  41. "2011年5地铁贯通深圳-搜狐新闻". news.sohu.com. Retrieved 2016-10-30.
  42. "City to spend 48b yuan on 3 Metro lines". Shenzhen Daily. Retrieved 2012-07-28.
  43. "The Shenzhen urban rail transportation recent construction plan approval (2011–2016)". National Development and Reform Commission. Retrieved 2012-08-27.
  44. "Public notice (draft)". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-08-27.
  45. "龙岗加快地铁16号线建设准备". 深圳商报. Retrieved 2012-08-27.
  46. "地铁16号线 2014年初开工". 深圳商报. Retrieved 2012-08-27.
  47. SZ to advance Metro Line 16 work-szdaily多媒体数字报刊平台
  48. "深圳交委称早7点以前或实行地铁票价优惠". 南方网. December 5, 2012.
  49. "我市召开轨道交通建设指挥部会议,地铁16号线有望提前开工". 深圳市交通运输委员会. January 7, 2013.
  50. "市地铁集团首席规划师刘卡丁:16号线力争提前建设,暂时不到龙岗中心城". 南方日报. December 5, 2012.
  51. "地铁10号线 终点在平湖---深圳都市报". dtzbd.sznews.com. Retrieved 2017-01-04.
  52. 1 2 "深圳地铁20号线站点一览 附最新线路规划图 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2017-01-04.
  53. 深圳地鐵-地鐵5號線南延段破土動工
  54. 网易. "深圳地铁20号线开工建设 将接驳穗莞深城际和东莞地铁_金羊网新闻_网易新闻". news.163.com. Retrieved 2016-11-28.
  55. "深圳地铁6号线拟年底开建 11号线预计后年通车". 搜房网. June 10, 2014.
  56. 1 2 地铁6号线10号线预计2019年通车-深圳晚报
  57. "地铁6号线10号线预计2019年通车".
  58. 刘世雄,陈福贵 (2013). "深圳地铁6号线运营成本测算研究". 现代城市轨道交通. 1.
  59. 地铁10号线预计本月开工|10号线|地铁|轨道_新浪新闻
  60. 深圳地铁10号线拟年底开工 2019年12月开通
  61. http://jt.sz.bendibao.com/news/2016617/772214.htm
  62. 1 2 3 4 5 6 "深圳地铁7,9,11号线明年开通 今年将增加铁路始发列车". 本地宝. 2015-03-31. Retrieved 2015-04-07.
  63. 1 2 3 4 5 "8号线用磁悬浮相对经济 现有线路除1号线外都要延长". 深圳晚报. February 19, 2014. Retrieved 2014-02-19.
  64. http://jt.sz.bendibao.com/news/2016617/772214_2.htm
  65. "深圳地铁3号线东延工程正式开工 计划2020年底开通- 新华网". www.gd.xinhuanet.com. Retrieved 2016-08-25.
  66. http://jt.sz.bendibao.com/news/2016818/778763.htm
  67. 深圳地铁9号线西延线前海段动工 - 中国轨道交通协会官网
  68. "深圳地铁4号线北延线正式施工 各大站点示意图曝光 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-09-18.
  69. 深圳地铁6条延长线线路图!看看哪些经过你家 - 深圳本地宝
  70. "未来五年深圳再建五条地铁". 南方都市报. Retrieved 2012-08-27.
  71. "轨道交通近期建设规划方案". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-08-27.
  72. http://www.sutpc.com/ad.asp
  73. 1 2 3 "深圳地铁四期规划来了!新增5条线,与东莞地铁对接方案出炉 - 市场 -深圳乐居网". sz.house.sina.com.cn. Retrieved 2017-01-04.
  74. "深圳地铁12号线最快明年开工建设 工期5年 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-10-28.
  75. "深圳地铁14号线提前至明年开建 深惠两段同步动工 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-09-18.
  76. "深圳地铁17号线什么时候开工? - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-09-18.
  77. "轨道线网规划方案". Shenzhen Urban Planning and Land Resources Committee. Retrieved 2012-11-21.
  78. "Dongguan Metro connection called for". Shenzhen Daily. Retrieved 2014-01-22.
  79. "Four more Metro lines planned". Shenzhen Daily. Retrieved 2012-11-21.
  80. (Chinese) fare information
  81. New Metro fares announced
  82. Business coach fears is three times as matching normal coach fears.
  83. (Chinese) SZMC fare policy
  84. types of tickets
  85. One smartcard to rule them all: Guangdong, HK team up to offer unified travel card | The Nanfang
  86. Guangdong and Hong Kong Linked by One Transportation Card _Life of Guangzhou
  87. "features". southcn.com. Retrieved 2012-08-27.
  88. "Metro Lines 1 and 4, Shenzhen, China". Archived from the original on 2009-02-04. Retrieved 2008-07-06.
  89. "Pocket Wi-Fi hotspots paralyse Chinese metro lines."
Wikimedia Commons has media related to:
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.