Line 11, Shanghai Metro

Line 11, Shanghai Metro
 11 
Overview
Type Rapid transit
System Shanghai Metro
Status Chenxiang Road and Yanyu Road still under construction, other stations operate normally.
Locale Shanghai, China
Kunshan, Jiangsu, China
Termini Jiading North/Huaqiao
Disney Resort
Stations 38
Daily ridership 920,000 (2017 peak)[1]
Operation
Opened December 31, 2009
Operator(s) Shanghai No.2 Metro Operation Co., Ltd.
Character

Underground (from Yuqiao to Taopu Xincun and Shanghai Ciruit Station)

Elevated (from Disney Resort to Luoshan Road and Nanxiang to North Jiading and East Changji Road to Huaqiao)
Technical
Line length 82.4 km (51.20 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead lines (1500 volts DC)
Operating speed 100 km/h (62 mph)

Line 11 is a northwest-southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city also and it is the second intercity metro in China after the Guangfo Metro, and the first that crosses a provincial boundary. It has two services: Service A (the Main Line) runs between North Jiading and Disney Resort, while Service B (the Branch Line) runs between Huaqiao in Kunshan and Sanlin. The two services share the same route and stations between Jiading New City and Sanlin and stop at these stations at alternate 5-minute intervals. The line is colored brown on system maps.

To scale map of Shanghai Metro Line 11

Service routes

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
Disney Resort 迪士尼 0.00 0.00 Pudong
Kangxin Highway 康新公路 5.08 5.08
Xiuyan Road 秀沿路 2.32 7.40
Luoshan Road 罗山路  16  1.78 9.18
Yuqiao 御桥 2.51 11.69
Yanyu Road 严御路 1.73 13.42
Pusan Road 浦三路 1.46 14.88
East Sanlin 三林东 1.58 16.46
Sanlin 三林 1.21 17.67
Oriental Sports Center 东方体育中心  6   8  3.13 20.8
Longyao Road 龙耀路 2.14 22.94 Xuhui
Yunjin Road 云锦路 0.76 23.70
Longhua 龙华  12  1.01 24.71
Shanghai Swimming Center 上海游泳馆 1.39 26.10
Xujiahui 徐家汇  1   9  1.85 27.95
Jiaotong University 交通大学  10  0.88 28.83 Changning
Jiangsu Road 江苏路  2  2.08 30.91
Longde Road 隆德路  13  1.35 32.26 Putuo
Caoyang Road 曹杨路  3   4  0.98 33.24
Fengqiao Road 枫桥路 0.81 34.05
Zhenru 真如 1.05 35.10
Shanghai West Railway Station 上海西站 China Railway China Railway High-speed Shanghaixi 1.35 36.45
Liziyuan 李子园 1.45 37.90
Qilianshan Road 祁连山路 1.35 39.25
Wuwei Road 武威路 1.32 40.57
Taopu Xincun 桃浦新村 1.59 42.16
Nanxiang 南翔 3.13 45.29 Jiading
Chenxiang Road 陈翔路 2.36 47.65
Malu 马陆 3.40 51.05
Jiading Xincheng 嘉定新城 2.90 53.95
Baiyin Road 白银路 1.89 55.84
West Jiading 嘉定西 3.29 59.13
North Jiading 嘉定北 1.94 61.07
Shanghai Circuit 上海赛车场 3.15 64.22 Jiading
East Changji Road 昌吉东路 5.27 69.49
Shanghai Automobile City 上海汽车城 2.25 71.74
Anting 安亭 1.84 73.58
Zhaofeng Road 兆丰路 1.12 74.70 Kunshan
(Suzhou, Jiangsu)
Guangming Road 光明路 3.29 77.99
Huaqiao 花桥 1.27 79.26

History

The 1st phase of Line 11, which runs from Jiading North to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Shanghai Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

SegmentDate openedLength
Jiangsu Road — North Jiading 31 December 2009 33.0 km (20.51 mi)
Jiading Xincheng — Anting 29 March 2010 12.8 km (7.95 mi)
East Changji Road 26 April 2011 Infill station
Luoshan Road — Jiangsu Road 31 August 2013 19.2 km (11.93 mi)
Anting — Huaqiao 16 October 2013 7.0 km (4.35 mi)
Kangxin Highway — Luoshan Road 19 December 2015 10.4 km (6.46 mi)
Disney Resort — Kangxin Highway 26 April 2016 1.8 km (1.12 mi)

Rolling Stock

Type Time of manufacturing Series Sets Assembly Notes
Type A 2008–2013 AC16 72 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Zhuzhou

References

  1. "上海地铁客流再创新高" (in Chinese). Sina Weibo. 2017-03-10. Retrieved 2017-03-13.
  2. "Archived copy". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
  3. "沪轨交9号线二期、11号线北段一期31日开通试运营".
  4. 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
  5. Metro extension to open next year
  6. 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  7. "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.