Sabroom railway station
Sabroom railway station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Indian Railway Station | |||||||||||
Location |
NH44, Sabroom, South Tripura district, Tripura India | ||||||||||
Elevation | 33 metres (108 ft) | ||||||||||
Owned by | Indian Railways | ||||||||||
Operated by | Northeast Frontier Railway | ||||||||||
Line(s) | Agartala-Sabroom Rail Line | ||||||||||
Platforms | 2 | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Standard (on ground station) | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
Other information | |||||||||||
Status | Construction - New Line | ||||||||||
Station code | SABRM | ||||||||||
Zone(s) | Northeast Frontier Railway | ||||||||||
Division(s) | Lumding railway division | ||||||||||
Electrified | No | ||||||||||
Services | |||||||||||
|
Sabroom railway station is a proposed railway station in South Tripura district, Tripura, India. Its code is SABRM. It will serve Sabroom town[1] and will be last station in Tripura state. It will be on the bank of Feni River near Bangladesh border.
Details
The station lies on the 113 km long 1,676 mm (5 ft 6 in) broad gauge Agartala-Sabroom railway line which comes under the Lumding railway division of the Northeast Frontier Railway zone of Indian Railways. It is a single line without electrification. The 43 km long segment from Agartala to Udaipur near Mata Tripura Sundari temple was completed in 2016 and has became operational with two trains running on this segment.[2][3][4][5]
Track laying on the remaining 70 km long part of the section in underway.
The track may be extended from Sabroom to Akhaura and Chittagong port in Bangladesh as agreed by the prime ministers of the both countries.