STS-111
Endeavour approaches the ISS | |
Mission type |
ISS logistics Crew rotation |
---|---|
Operator | NASA |
COSPAR ID | 2002-028A |
SATCAT no. | 27440 |
Mission duration | 13 days, 20 hours, 35 minutes, 56 seconds |
Distance travelled | 9,300,000 kilometres (5,800,000 mi) |
Spacecraft properties | |
Spacecraft | Space Shuttle Endeavour |
Launch mass | 116,523 kilograms (256,889 lb) |
Landing mass | 99,385 kilograms (219,106 lb) |
Payload mass | 12,058 kilograms (26,583 lb) |
Crew | |
Crew size | 7 |
Members |
Kenneth D. Cockrell Paul S. Lockhart Philippe Perrin Franklin Chang-Diaz |
Launching |
Valery G. Korzun Peggy A. Whitson Sergei Y. Treshchov |
Landing |
Yuri I. Onufrienko Carl E. Walz Daniel W. Bursch |
Start of mission | |
Launch date | 5 June 2002 21:22:49 UTC |
Launch site | Kennedy LC-39A |
End of mission | |
Landing date | 19 June 2002 17:58:45 UTC |
Landing site | Edwards Runway 22 |
Orbital parameters | |
Reference system | Geocentric |
Regime | Low Earth |
Perigee | 349 kilometres (217 mi) |
Apogee | 387 kilometres (240 mi) |
Inclination | 51.6 degrees |
Period | 91.9 minutes |
Docking with ISS | |
Docking port |
PMA-2 (Destiny forward) |
Docking date | 7 June 2002 16:25 UTC |
Undocking date | 15 June 2002 14:32 UTC |
Time docked | 7 days, 22 hours, 7 minutes |
(L-R): Philippe Perrin, Paul S. Lockhart, Kenneth D. Cockrell, Franklin R. Chang-Diaz |
STS-111 was a space shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. STS-111 resupplied the station and replaced the Expedition 4 crew with the Expedition 5 crew. It was launched on 5 June 2002, from Kennedy Space Center, Florida.
Crew
Position | Launching Astronaut | Landing Astronaut |
---|---|---|
Commander | Kenneth D. Cockrell Fifth spaceflight | |
Pilot | Paul S. Lockhart First spaceflight | |
Mission Specialist 1 | Philippe Perrin, CNES Only spaceflight | |
Mission Specialist 2 | / Franklin Chang-Diaz Seventh and last spaceflight | |
Mission Specialist 3 | Valery G. Korzun, RKA Expedition 5 Second spaceflight ISS Commander/Soyuz Commander |
Yuri I. Onufrienko, RKA Expedition 4 Second spaceflight ISS Commander/Soyuz Commander |
Mission Specialist 4 | Peggy A. Whitson Expedition 5 First spaceflight ISS Flight Engineer |
Carl E. Walz Expedition 4 Fourth spaceflight ISS Flight Engineer |
Mission Specialist 5 | Sergei Y. Treshchov, RKA Expedition 5 First spaceflight ISS Flight Engineer |
Daniel W. Bursch Expedition 4 Fourth spaceflight ISS Flight Engineer |
Mission highlights
STS-111, in addition to providing supplies, rotated the crews aboard the International Space Station, exchanging the three Expedition 4 members (1 Russian, 2 American) for the three Expedition 5 members (2 Russian, 1 American).
The Multi-Purpose Logistics Module (MPLM) carried experiment racks and three stowage and resupply racks to the station. The mission also installed a component of the Canadarm2 called the Mobile Base System (MBS) to the Mobile Transporter (MT) (which was installed during STS-110); This was the second component of the Canadian Mobile Servicing System, or MSS. This gave the mechanical arm the capability to "inchworm" from the U.S. Lab fixture to the MBS and travel along the Truss to work sites.
STS-111 was the last flight of a CNES astronaut, the French agency having disbanded its astronaut group and transferred them to the ESA.
Spacewalks
Mission | Spacewalkers | Start – UTC | End – UTC | Duration | Mission | |
---|---|---|---|---|---|---|
39. | STS-111 EVA 1 |
Franklin R. Chang-Diaz Philippe Perrin |
9 June 2002 15:27 |
9 June 2002 22:41 |
7 h, 14 min | Attached Power and Data Grapple Fixture to P6 Truss |
40. | STS-111 EVA 2 |
Franklin R. Chang-Diaz Philippe Perrin |
11 June 2002 15:20 |
11 June 2002 20:20[1][2] |
5 h, 00 min | Attached Mobile Base System to Mobile Transporter |
41. | STS-111 EVA 3 |
Franklin R. Chang-Diaz Philippe Perrin |
13 June 2002 15:16 |
13 June 2002 22:33 |
7 h, 17 min | Replace Canadarm2 wrist joint |
Attempt | Planned | Result | Turnaround | Reason | Decision point | Weather go (%) | Notes |
---|---|---|---|---|---|---|---|
1 | 30 May 2002, 7:44:26 pm | scrubbed | --- | weather | 40% | thunderstorms and electrical activity | |
2 | 31 May 2002, 7:21:52 pm | scrubbed | 0 days, 23 hours, 37 minutes | weather | 31 May 2002, 9:45 am | 80% | scrubbed before tanking had begun, concerns of continued bad weather including hail |
3 | 5 Jun 2002, 5:22:48 am | success | 4 days, 10 hours, 1 minute | initial plans for Monday launch were delayed due to nitrogen valve problems[3] |
Media
- Launch video (3 mins 11 secs)
- Landing video (2 mins 29 secs)
See also
- List of human spaceflights
- List of International Space Station spacewalks
- List of Space Shuttle missions
- List of spacewalks and moonwalks 1965–1999
- Outline of space science
References
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.
- ↑ http://spaceflight.nasa.gov/shuttle/archives/sts-111/eva/index.html
- ↑ http://spaceflight.nasa.gov/spacenews/reports/sts111/STS-111-14.html
- ↑ "Launch delayed because of nitrogen valve problem". CBS News. 2002-06-01. Retrieved 30 August 2009.
External links
Wikimedia Commons has media related to STS-111. |
- NASA mission archive
- NASA mission summary
- Status reports – Detailed NASA status reports for each day of the mission.
- STS-111 Video Highlights