USS Sculptor (AK-103)

USS Sculptor (AK-103), underway in San Francisco Bay, 13 December 1944.
History
United States
Name:
  • D. W. Harrington
  • Sculptor
Namesake: The constellation Sculptor
Ordered: as a Type EC2-S-C1 hull, MCE hull 1671[1]
Builder: California Shipbuilding Corporation, Terminal Island, Los Angeles, California
Yard number: 204[1]
Way number: 10[1]
Laid down: 18 May 1943
Launched: 10 June 1943
Sponsored by: Mrs. S. E. Joseph
Acquired: 22 June 1943
Commissioned: 10 August 1943
Decommissioned: 26 February 1946
Struck: 12 March 1947
Identification:
Fate: Returned to MARCOM, 8 March 1946, laid up in the National Defense Reserve Fleet, James River Group, Lee Hall, Virginia
Status: sold, 15 January 1947
GreeceGreece
Name: Dimosthenis Pantaleon
Owner: P. & V. Pantaleon
Acquired: 27 January 1947
Fate: scrapped, 1969
General characteristics [2]
Class and type: Crater-class cargo ship
Type: Type EC2-S-C1
Displacement:
  • 4,023 long tons (4,088 t) (standard)
  • 14,550 long tons (14,780 t) (full load)
Length: 441 ft 6 in (134.57 m)
Beam: 56 ft 11 in (17.35 m)
Draft: 28 ft 4 in (8.64 m)
Installed power:
Propulsion:
Speed: 12.5 kn (14.4 mph; 23.2 km/h)
Capacity:
  • 7,800 t (7,700 long tons) DWT
  • 444,206 cu ft (12,578.5 m3) (non-refrigerated)
Complement: 16 officers 190 enlisted
Armament:

USS Sculptor (AK-103) was an Crater-class cargo ship commissioned by the US Navy for service in World War II. Sculptor was named after the constellation Sculptor. She was responsible for delivering troops, goods and equipment to locations in the Asiatic-Pacific Theater.

Construction

Sculptor was laid down 18 May 1943, under Maritime Commission (MARCOM) contract, MC hull No. 1671, as the Liberty ship SS D. W. Harrington, by California Shipbuilding Corporation, Terminal Island, Los Angeles, California; launched on 10 June 1943; sponsored by Mrs. S. E. Joseph; acquired by the Navy on 22 June 1943; and commissioned on 10 August 1943, Lieutenant Commander George C. Bosson in command.[3]

Service history

Sculptor served in the Naval Transportation Service (NTS), making six voyages from San Francisco, California, supplying advanced bases in the western Pacific. She sailed on her first voyage on 28 August 1943, towing a section of the floating dock, ABSD-1, and delivered it and other cargo at Espiritu Santo on 2 October. After carrying Lend-Lease material to New Zealand, she returned to San Francisco on 23 November.[3]

On her second voyage, beginning on 27 December, she towed a repair barge, YRDH-1, and carried a deck cargo of an LCT in sections to Espiritu Santo. After arriving there on 1 February 1944, she made voyages between advanced bases until departing from Espiritu Santo on 20 April, for San Francisco, where she arrived on 12 May.[3]

Sculptor's remaining voyages followed the pattern of the first two. She sailed from San Francisco on 3 June, with a section of ABSD-2 in tow, and made local cargo voyages in the Southwest Pacific between 15 July and 29 September, before returning to San Francisco on 24 October.[3]

After overhaul, she sailed again on 16 December, with two YF (covered barges) in tow which she exchanged at Pearl Harbor for YFD-64. This large dry dock was delivered by the combined efforts of Sculptor, and a sister ship, at San Pedro Bay, Leyte, Philippine Islands, on 13 February 1945. Sculptor then carried cargo between advanced bases until 28 April, and returned to San Francisco on 21 May.[3]

On 15 June 1945, the cargo ship left San Diego with two 83' US Coast Guard cutters on deck and a barge in tow. The tow was dropped at Pearl Harbor, and the remainder of the cargo was offloaded at Saipan after arrival on 13 July.[3]

The ship returned to San Francisco on 1 September, and began her sixth and last Navy voyage on 29 September. She delivered cargo to Saipan and Guam, and sailed from Guam on 23 December, for the East Coast of the United States.[3]

Post-war decommissioning

Sculptor arrived at Baltimore, Maryland, on 21 February 1946, and was decommissioned there on 26 February. The ship was redelivered to MARCOM on 8 March, and struck from the Navy List on 12 March 1946.[3]

On 15 January 1947, she was sold to the Greek shipping firm P. & V. Pantaleon for $544,506. She was removed from the National Defense Reserve Fleet, James River Group, Lee Hall, Virginia, on 27 January 1947. She was renamed SS Dimosthenis Pantaleon, under which name she remained in service until she was scrapped at Trieste, Italy, in 1969.[4]

Awards

Sculptor's crew members were eligible for the following medals:[2]

Notes

    Citations

    Bibliography

    Online resources


    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.