Qinghuayuan Railway Station
Coordinates: 39°58′52″N 116°20′01″E / 39.98111°N 116.33361°E Qinghuayuan railway station (simplified Chinese: 清华园站; traditional Chinese: 清華園站; pinyin: qīng huá yuán zhàn) was a railway station in Beijing.
History
The construction work of the station was completed in 1910. The station was located near the east gate of Tsinghua University. In early 1950s, the old station moved to its new location, about 0.5 kilometers south to the former station. The new station located south to 4th Ring Road, just east to the later built elevated Beijing Subway line 13.
The station is named after Tsinghua Park.
It is closed on November 1, 2016.
Schedules
28 passenger trains stopped at the station before it ceased operation:
Train No. | Arrive | Depart | Stops | |
---|---|---|---|---|
S201 | 06:17 | 06:25 | 8 min | Beijing North – Yanqing |
S202 | 07:26 | 07:27 | 1 min | Yanqing – Beijing north |
S287 | 08:03 | 08:04 | 1 min | Beijing North – Shacheng |
S203 | 08:04 | 08:05 | 1 min | Beijing North – Yanqing |
S204 | 08:02 | 08:06 | 4 min | Yanqing – Beijing north |
S206 | 08:22 | 08:23 | 1 min | Yanqing – Beijing north |
S208 | 09:38 | 09:39 | 1 min | Yanqing – Beijing north |
4471 | 09:19 | 09:55 | 36 min | Beijing North – Longhua |
S209 | 11:02 | 11:03 | 1 min | Beijing North – Yanqing |
S210 | 12:03 | 12:04 | 1 min | Yanqing – Beijing North |
S214 | 13:03 | 13:04 | 1 min | Yanqing – Beijing North |
S213 | 13:19 | 13:20 | 1 min | Beijing North – Yanqing |
S216 | 14:52 | 14:53 | 1 min | Yanqing – Beijing North |
S217 | 15:29 | 15:30 | 1 min | Beijing North – Yanqing |
4472 | 16:21 | 16:23 | 2 min | Longhua – Beijing North |
S218 | 16:34 | 16:35 | 1 min | Yanqing – Beijing North |
S220 | 17:10 | 17:17 | 7 min | Yanqing – Beijing North |
S222 | 17:32 | 17:33 | 1 min | Yanqing – Beijing North |
S221 | 17:46 | 17:47 | 1 min | Beijing North – Yanqing |
S224 | 18:45 | 18:46 | 1 min | Yanqing – Beijing North |
S223 | 18:44 | 18:47 | 3 min | Beijing North – Yanqing |
S225 | 19:16 | 19:17 | 1 min | Beijing North – Yanqing |
S226 | 21:02 | 21:03 | 1 min | Yanqing – Beijing North |
S227 | 21:33 | 21:34 | 1 min | Beijing North – Yanqing |
S228 | 21:29 | 21:35 | 6 min | Yanqing – Beijing North |
S230 | 22:10 | 22:11 | 1 min | Yanqing – Beijing North |
S229 | 22:08 | 22:12 | 4 min | Beijing North – Yanqing |
S232 | 22:54 | 22:55 | 1 min | Yanqing – Beijing North |
Schedule updated on Jul. 1st, 2015. Note: Trains with the number 7xxxx have been cancelled due to the opening of Line S2.
Wikimedia Commons has media related to Qinghuayuan_Railway_Station. |
Preceding station | China Railway | Following station | ||
---|---|---|---|---|
Terminus | Beijing–Baotou Railway
Jingzhang Railway | towards Baotou |
||
Beijing Suburban Railway | ||||
towards Huangtudian | BCR Line S2 |