Prince Edward MRT Station
CC32 Prince Edward 爱德华太子 பிரின்ஸ் எட்வர்ட் Prince Edward | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Operated by | SMRT Trains (SMRT Corporation) (Circle Line) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Taxi, Bus | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 2 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | CC32 | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Prince Edward MRT Station (CC32) is a future underground Mass Rapid Transit station on the Circle Line in Downtown Core, Singapore. The station was announced as part of the Stage 6 of the Circle Line and is slated for completion by 2025.
The station took its name from the nearby Prince Edward Road.
History
This station was first announced on 29 October 2015.[1]
Prince Edward station will be located near Bestway Building, Hock Teck See Temple and Masjid Haji Muhammad Salleh. The Land Transport Authority (LTA) said that these buildings will not be affected by construction works.
It added that while all efforts have been made to minimise land acquisition, four part lots of private land consisting of open areas, grass verges, container stacking lots and driveways will be acquired. LTA said as these lots will only be partially affected, the landowners will be able to remain in their current premises.[2]
Station Layout
L1 | Street Level | 76 Shenton, 78 Shenton, Bestway Building, Hock Teck See Temple, Masjid Haji Muhammad Salleh |
B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter |
B2 | Platform A | Circle Line (future service) anticlockwise ↺ via NS27 CC33 TE20 Marina Bay → |
Island platform, doors will open on the right | ||
Platform B | Circle Line (future service) clockwise ↻ via CC32 Cantonment ← |
Exits
- A: Hock Teck See Temple
- B: 76 Shenton, 78 Shenton
References
- ↑ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Circle Line 6 - Becoming A Full Circle". Land Transport Authority. 29 October 2015.
- ↑ "With final 3 stations, Circle Line will come 'full circle' by 2025". Channel NewsAsia. 2015-10-29. Retrieved 2016-09-15.