Panamax

General characteristics Panamax
Tonnage: 52,500 DWT
Length: 289.56 m (950 ft)
Beam: 32.31 m (106 ft)
Height: 57.91 m (190 ft)
Draft: 12.04 m (39.5 ft)
Capacity: 5,000 TEU
Notes: Opened 1914
General characteristics New Panamax
Tonnage: 120,000 DWT
Length: 366 m (1,201 ft)
Beam: 49 m (161 ft)
Height: 57.91 m (190 ft)
Draft: 15.2 m (50 ft)
Capacity: 13,000 TEU
Notes: Opened 2016
The two ships seen here seem almost to be touching the walls of the Miraflores Locks.

Panamax and New Panamax (or Neopanamax) are terms for the size limits for ships travelling through the Panama Canal. Formally, these limits and requirements are published by the Panama Canal Authority (ACP), titled "Vessel Requirements".[1] These requirements also describe topics like exceptional dry seasonal limits, propulsion, communications, and detailed ship design.

The allowable size is limited by the width and length of the available lock chambers, by the depth of water in the canal, and by the height of the Bridge of the Americas since that bridge's construction. These dimensions give clear parameters for ships destined to traverse the Panama Canal and have influenced the design of cargo ships, naval vessels, and passenger ships.

Panamax specifications have been in effect since the opening of the canal in 1914. In 2009 the ACP published the New Panamax specification[2] which came into effect when the canal's third set of locks, larger than the original two, opened on 26 June 2016. Ships that do not fall within the Panamax-sizes are called post-Panamax.

The increasing prevalence of vessels of the maximum size is a problem for the canal, as a Panamax ship is a tight fit that requires precise control of the vessel in the locks, possibly resulting in longer lock time, and requiring that these ships transit in daylight. Because the largest ships traveling in opposite directions cannot pass safely within the Culebra Cut, the canal effectively operates an alternating one-way system for these ships.

Ship dimensions

An officer monitors the clearance of the cruise ship Ryndam as she traverses the lock.
USS Missouri, one of the Iowa-class battleships, makes a very tight fit as she passes through the Miraflores Locks of the Panama Canal in October 1945.

Panamax is determined principally by the dimensions of the canal's original lock chambers, each of which is 110 ft (33.53 m) wide, 1,050 ft (320.04 m) long, and 41.2 ft (12.56 m) deep. The usable length of each lock chamber is 1,000 ft (304.8 m). The available water depth in the lock chambers varies, but the shallowest depth is at the south sill of the Pedro Miguel Locks and is 41.2 ft (12.56 m) at a Miraflores Lake level of 54 ft 6 in (16.61 m). The clearance under the Bridge of the Americas at Balboa is the limiting factor on a vessel's overall height for both Panamax and Neopanamax ships; the exact figure depends on the water level.

The maximum dimensions allowed for a ship transiting the canal using the original locks and the new locks (New Panamax) are:[1]

Length

Overall (including protrusions): 950 ft (289.56 m). Exceptions:

New Panamax increases allowable length to 366 m (1,201 ft).[2]

Width (beam)

Width over outer surface of the shell plating: 106 ft (32.31 m). General exception: 107 ft (32.61 m), when draft is less than 37 ft (11.3 m) in tropical fresh water.

New Panamax increases allowable width to 49 m (161 ft).[2]

Draft

39.5 ft (12.04 m) in Tropical Fresh Water (TFW). The name and definition of TFW is created by ACP using the freshwater Lake Gatún as a reference, since this is the determination of the maximum draft. The salinity and temperature of water affect its density, and hence how deep a ship will float in the water. Tropical Fresh Water (TFW) is fresh water of Lake Gatún, with density 0.9954 g/cm3, at 29.1 °C (84 °F).[3] The physical limit is set by the lower (seaside) entrance of the Pedro Miguel locks. When the water level in Lake Gatún is low during an exceptionally dry season the maximum permitted draft may be reduced. Such a restriction is published three weeks in advance, so ship loading plans can take appropriate measures.

New Panamax increases allowable draft to 15.2 m (49.9 ft),[2] however due to low rainfall, the canal authority limited draft to 43 feet when the new locks opened in June 2016, increasing it to 44 feet (13.41 meters), in August "based on the current level of Gatun Lake and the weather forecast for the following weeks."[4]

Air draft

190 ft (57.91 m) measured from the waterline to the vessel's highest point; limit also pertains to New Panamax and Balboa harbor. Exception: 205 ft (62.5 m) when passage at low water (MLWS) at Balboa is possible.

All exceptions are typically allowed only after specific request and an investigation, and on a once- or twice-only basis.

Cargo capacity

A Panamax cargo ship would typically have a DWT of 65,000–80,000 tonnes, but its maximum cargo would be about 52,500 tonnes during a transit due to draft limitations in the canal.[5] New Panamax ships can carry 120,000 DWT.[6] Panamax container ships can carry 5,000 twenty-foot equivalent units (TEU); with 13,000 TEU for New Panamax vessels.

Records

The longest ship ever to transit the original locks was San Juan Prospector, now Marcona Prospector, an ore-bulk-oil carrier that is 973 ft (296.57 m) long, with a beam of 106 ft (32.31 m).[7] The widest ships to transit are the four Iowa-class battleships (Iowa, New Jersey, Missouri, and Wisconsin), which have a maximum beam of 108 ft (33 m), leaving less than 6 in (15 cm) margin of error between the ships and the walls of the locks.[8]

Expansion plans

As early as the 1930s, new locks were proposed for the Panama Canal to ease congestion and to allow larger ships to pass. The project was abandoned in 1942.

On October 22, 2006, the Panama Canal Authority (with the support of the Electoral Tribunal) held a referendum for Panamanian citizens to vote on the Panama Canal expansion project. The expansion was approved by a wide margin, with support from about 78% of the electorate. Construction began in 2007, and after several delays, the new locks opened for commercial traffic on 26 June 2016.[9]

Neopanamax

The plans to build another set of larger locks led to the creation of the Neopanamax or New Panamax ship classification, based on the new locks' dimensions of 427 m (1,401 ft) in length, 55 m (180 ft) in beam, and 18.3 m (60.0 ft) in depth.[2] Naval architects and civil engineers began taking into account these dimensions for container ships.[10] Since the completion of the expansion in June 2016, the Panama Canal is able to handle vessels with overall length of 366 m (1201 feet), 49 meters beam and 15.2 meters draft.[2] and cargo capacity up to 13,000 twenty-foot equivalent units (TEU);[11] previously, it could only handle vessels up to about 5,000 TEU.[12] The Neopanamax standard will be able to accommodate ships up to 120,000 DWT.[6]

Impact on world ports

Navigational clearance under the Bayonne Bridge in New York harbor is being increased to accommodate New Panamax ships. The lower roadway will be removed once the new upper roadway is operational.

Several ports, including the ports of New York and New Jersey, Norfolk, and Baltimore, all on the East Coast of the United States, have already increased their depth to at least 50 feet (15 m) to accommodate New Panamax ships; the Port of Miami has recently approved the same in a project known as the "Deep Dredge"[13] and will be the closest deep-water port to the Panama Canal in the US. Liverpool is building a new container terminal, Liverpool2, where ships berth in the tidal river rather than in the enclosed docks, to coincide with the opening of the widened Panama Canal locks. In Halifax a major expansion of the South End Container Terminal was completed in 2012, extending the pier and increasing the berth depth from 14.5 to 16 metres (48 to 52 ft).[14] The Port Authority of New York and New Jersey is raising the clearance of the Bayonne Bridge to 215 feet (66 m), at a cost of $1.3 billion, due in late 2017, to allow New Panamax ships to reach container port facilities at Port Newark–Elizabeth Marine Terminal. Currently, GCT Bayonne, Global Container, can handle the New Panamax ships. Maersk will wait until the Bayonne Bridge is raised. As of April 2012, a controversy between Savannah, Georgia, and Charleston, South Carolina, over limited federal funding for dredging/deepening projects—including both state and federal lawsuits filed by environmental groups in both states opposing the techniques planned to be used in dredging the Savannah River—also revolves around attracting the business of carriers whose fleets include New Panamax vessels. Jacksonville, Florida, is pursuing its "Mile Point" project with the prospect of deepening the St. John's River in anticipation of Post-Panamax traffic; Mobile, Alabama, has completed the deepening of its harbor to 45 feet (14 m) for the same reason; and other ports seem likely to follow suit.

Impact on existing ships

Due to the expansion, demand for 'Old Panamax' ships has plummetted, resulting in ships being traded at scrap value. Some ships only 7 years old have been sold for scrap. [15] [16]

Comparison of sizes

Comparison of bounding box of Panamax and Neopanamax with some other sizes in isometric view.
Original locks Panamax Third locks[n 1] Neo-Panamax[n 1]
Length 320.04 m (1,050 ft) 294.13 m (965 ft) 427 m (1,400 ft) 366 m (1,200 ft)
Width 33.53 m (110 ft) 32.31 m (106 ft) 55 m (180 ft) 49 m (161 ft)
Draft[n 2] 12.56 m (41.2 ft) 12.04 m (39.5 ft) 18.3 m (60 ft) 15.2 m (50 ft)
TEUs 5,000 13,000
Tonnage 52,500 DWT 120,000 DWT
  1. 1 2 New Panamax sizes are published in the metric system[2]
  2. Draft in Tropical Freshwater (TF)

Post-Panamax ships

Post-Panamax or over-Panamax denote ships larger than Panamax that do not fit in the original canal locks, such as supertankers and the largest modern container and passenger ships. The first known post-Panamax ship was the RMS Queen Mary, launched in 1934, built with a 118-foot beam as she was intended solely for North Atlantic passenger runs. When she was moved to Long Beach, California, as a tourist attraction in 1967, a lengthy voyage around Cape Horn was necessary.[17] The first post-Panamax warships were the Japanese Yamato-class battleships, launched in 1940.[18] Until World War II, the United States Navy required that all of their warships be capable of transiting the Panama Canal. The first US Navy warship design to exceed Panamax limits was the Montana-class battleship, designed circa 1940 but never built. The limit was specifically removed by the Secretary of the Navy on 12 February 1940, with the (never-realized) prospect of a new set of 140-foot wide locks to be built for the Canal.[19] The Essex-class aircraft carriers were designed with a folding deck-edge elevator to meet Panamax limits; the limit did not apply to subsequent US aircraft carriers.[20]

Even with the larger locks that went into service in 2016, there are still ships that cannot pass through the Panama Canal. These include Mærsk E-class and Maersk Triple E class container ships, TI-class supertankers, and Valemax ore carriers, all of which are too wide for the new locks. Furthermore, while the world's largest cruise ships, Oasis of the Seas, Allure of the Seas and the Harmony of the Seas will fit within the new locks, they are too tall to pass under the Bridge of the Americas even at low tide unless the Bridge of the Americas is raised.

See also

References

  1. 1 2 "Vessel Requirements" (PDF). Panama Canal Authority..
  2. 1 2 3 4 5 6 7 Manuel E. Benítez, ACP (2009-01-19). "Dimensions for Future Lock Chambers and "New Panamax" Vessels" (PDF). ACP. Retrieved 2010-05-02.
  3. "Regulation on navigation in Panama Canal Waters" (PDF). The Panama Canal Authority. 1999-06-03. p. 10. Retrieved 2012-12-10.
  4. Canal adds foot to maximum draft of neo-Panamax locks, Joseph Bonney, joc.com, Aug 08, 2016, Accessed December 11, 2016
  5. Modern ship size definitions (PDF), Lloyd's register.
  6. 1 2 "The New Panamax; 13,200-TEU Containership, 120,000 dwt Bulk Carrier". Retrieved 4 January 2014.
  7. Background of the Panama Canal, Montclair State University.
  8. "BB-61 Iowa-class". Retrieved 4 January 2014.
  9. "Panama Canal Opens $5B Locks, Bullish Despite Shipping Woes". The New York Times. Associated Press. 2016-06-26. Retrieved 2016-06-26.
  10. Propulsion Trends in Container Vessels (PDF), MAN B&W Two-stroke Engines.
  11. "Maersk Edinburgh" 13,000 TEU container ship", Fleet (PDF), Rickmers Maritime.
  12. "'Maersk Djibouti' 5,000 TEU container ship", Fleet (PDF), Rickmers Maritime.
  13. "Bill Johnson, Director of the Port of Miami, presented on the Port of Miami’s Deep Dredge Project to the Miami Beach Chamber of Commerce’s…". Retrieved 4 January 2014.
  14. Power, Bill (13 February 2012). "$35m port terminal project nearing completion". Halifax Chronicle-Herald.
  15. http://www.bbc.co.uk/news/business-38653546
  16. http://www.joc.com/maritime-news/ships-shipbuilding/maersk-scrapping-eight-panamax-ships_20161219.html
  17. Tramp to Queen: The Autobiography of Captain John Treasure Jones. The History Press. 2008. ISBN 0752446258.
  18. "Yamato Class Battleship - Japan (Pacific 1940)". Retrieved 4 January 2014.
  19. Friedman, Norman (1985). U.S. Battleships: An Illustrated Design History. Annapolis, Maryland: Naval Institute Press. p. 332. ISBN 978-0-87021-715-9.
  20. "70 years of schemes to improve and enlarge the Panama Canal", p. 1 (Essex-class aircraft carriers were the "last fleet carriers capable of passing through the canal’s original locks"). The paper is linked from Dr. Roger's website, Panama Canal.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.