Palembang Light Rail Transit

Palembang Light Rail Transit (LRT)
Overview
Locale Palembang, Indonesia
Transit type Light rail transit
Number of lines 1
Number of stations 13
Operation
Operation will start June 2018 (planned)
Operator(s) PT KAI
Technical
System length 25 km (16 mi)
Track gauge 1,067 mm
Electrification 750 VDC
Palembang LRT
S01 Bandara SMB IIAirport interchange
S02 Asrama Haji(PDK)
S03 Kominfo(Dolog)
S04 Telkom
S05 Rumah Sakit Umum Daerah(Pasar KM 5)
S06 Polda
S07 Jalan Demang Lebar Daun(Angkatan 45)
S08 Palembang Icon(Palembang Square)
S09 Pasar Cinde
S10 Amperaferry/water interchange

Ampera Bridge
S11 Polresta
S12 Jakabaring
S13 Ogan Permata Indah
Depot

The Palembang Light Rail Transit (Palembang LRT) is a light rail transit system that currently is under construction in Palembang, Indonesia and connect Sultan Mahmud Badaruddin II International Airport and Jakabaring stadium complex. The project is built to facilitate the 2018 Asian Games[1][2] It will start to operate in June 2018, two months before the Asian Games. As of May 2017, the progress of the construcrion is 40%.[3] The project is estimated to cost Rp9.4 trillion (US$707.51 million).[4]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.