Neu-Edingen/Mannheim-Friedrichsfeld station

Neu-Edingen/Mannheim-Friedrichsfeld
Deutsche Bahn
Through station
Location Edingen-Neckarhausen, Baden-Württemberg
Germany
Coordinates 49°26′55″N 8°34′49″E / 49.4487°N 8.5804°E / 49.4487; 8.5804Coordinates: 49°26′55″N 8°34′49″E / 49.4487°N 8.5804°E / 49.4487; 8.5804
Line(s)
Platforms 5 (formerly 7)
Other information
Station code 3927
DS100 codeRMF[1]
IBNR8000631
Category3[2]
Website www.bahnhof.de
History
Opened 1912 (1912)
Traffic
Passengers ca. 20,000 daily
Services
Preceding station   DBAG   Following station
TerminusRB 44
Mainz–Ludwigshafen railway
toward Mainz Hbf
Ladenburg
toward Bensheim
RB 60
Main-Neckar Railway
Mannheim ARENA/Maimarkt
toward Mannheim Hbf
Ladenburg
RB 68
Main-Neckar Railway
Heidelberg-Pfaffengrund/Wieblingen

Neu-Edingen/Mannheim-Friedrichsfeld station (formerly Mannheim-Friedrichsfeld) is a separation station in the Mannheim district of Friedrichsfeld on the border with the municipality of Edingen-Neckarhausen in the German state of Baden-Württemberg. All rail tracks are in Mannheim, only the station building is located on the territory of the Edingen-Neckarhausen hamlet of Neu-Enghien. It is classified by Deutsche Bahn as a category 3 station.[2] It is planned mto integrate the station into the Rhine-Neckar S-Bahn.[3]

History

In 1838 the Main-Neckar Railway was planned to connect Frankfurt to Mannheim and Heidelberg. The BensheimHeidelberg section was opened together with the branch from Mannheim and thus the whole length of the Main-Neckar Railway was completed on 1 August 1846 in Friedrichsfeld. In order for both cities to be treated equally, a break-of-gauge station had to be built by the Main-Neckar Railway and the Grand Duchy of Baden State Railway.

On 1 June 1880 the line from Mannheim-Friedrichsfeld to Schwetzingen was put into operation, which is almost exclusively used by freight traffic. In preparation for it, the station was substantially rebuilt in 1879/80. Electric lighting was installed in Friedrichsfeld station in 1896. In 2016, Mannheim-Friedrichsfeld station was renamed Neu-Edingen/Mannheim-Friedrichsfeld.

Platforms

Friedrichsfeld station has an extensive system of tracks. Five of the seven platform tracks that were previously available for passenger services are still in use at the “home” platform and two island platforms.

The numbering begins on the east side of the station building.

The former island platform between tracks 6 and 7 has been largely removed.

The platforms of the Mannheim-Friedrichsfeld station are not barrier-free for the disabled. To get to the platforms of tracks 2 to 5, it is necessary to use an underpass from platform 1. A door of the entrance building leads to a staircase leading to the pedestrian underpass to the platforms.

Rail services

Mannheim-Friedrichsfeld station belongs to the fare zone of the Verkehrsverbund Rhein-Neckar (Rhine-Neckar Transport Association, VRN). The first continuous test run from Frankfurt to Heidelberg took place on 27 July 1846.

Mannheim-Friedrichsfeld station is now (2013) used by Regionalbahn trains from Mannheim towards Bensheim in preparation for the future operations of the Rhine-Neckar S-Bahn as well as Regionalbahn services (designated as Stadt-Express services) from Heidelberg to Frankfurt am Main. The station is also the starting point of Regionalbahn services via Mannheim to Mainz, which in the weekday peak hour occasionally begin or end in Bensheim. From Monday to Friday, in the morning a Regional-Express service from Frankfurt to Mannheim stops at the station and in the evening a Regional-Express service from Frankfurt to Heidelberg stops at the station.

Line Route Frequency
RE 60 FrankfurtDarmstadtBensheimWeinheimNeu-Edingen/Mannheim-FriedrichsfeldMannheim Individual services
RE 60 Frankfurt – Darmstadt – Bensheim – Weinheim – Neu-Edingen/Mannheim-FriedrichsfeldHeidelberg Individual services
RB 44 (Bensheim – Heppenheim – Weinheim –) Neu-Edingen/Mannheim-Friedrichsfeld – Mannheim – LudwigshafenWormsMainz Every 60 minutes
RB 60 Bensheim – Heppenheim (Bergstr) – Weinheim (Bergstr) – Neu-Edingen/Mannheim-Friedrichsfeld – Mannheim (– continuing as RB44) Individual services
RB 67 Frankfurt – Darmstadt – Bensheim – Weinheim – Neu-Edingen/Mannheim-FriedrichsfeldHeidelberg Hbf Mo–Fr two train pairs, Sa+Su one train pair
RB 68 Frankfurt – Darmstadt – Bickenbach – Bensheim – Heppenheim – Weinheim – Neu-Edingen/Mannheim-Friedrichsfeld – Heidelberg Every 60 minutes

Notes

  1. Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. 1 2 "Stationspreisliste 2017" [Station price list 2017] (PDF) (in German). DB Station&Service. 18 November 2016. Retrieved 14 December 2016.
  3. "S-Bahn-Stopp erhält neuen Namen" (in German). morgenweb. 18 January 2012. Retrieved 6 May 2013.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.