NTrak

An NTrak layout set up for operations at Trainfest, a model train show in Milwaukee, WI in 2004.

NTrak is one of several model railroad module standards. It is the most popular standard for use in United States N scale. NTrak allows modellers to participate in a large layout but only invest a small amount of space at their own home. They can interchange their module with any club or group that follows NTrak standards.

History

The first prototype NTrak modules were designed and built by Ben Davis, then they were first displayed in 1973 at the Model Railroad Industry Association show in Costa Mesa, California. Following their success at this show, the modules made their debut at the 1974 National Model Railroad Association's national convention in San Diego, California. Ben was a founding member of the Belmont Shores Model Railroad Club; the club, which has helped launch the model manufacturing careers of many of its members, is now considered by many as the organization where NTrak started.

Module standards

NTrak modules are marked by their standard three running tracks (two are "mainline" tracks and the third is the "branchline" track) that are required on all modules. These three tracks are set on 1.5-inch (38 mm) centers near the viewing side of the modules. The tracks are labeled from the viewing aisle by color, starting with Red for the outermost (closest to the viewing aisle) track, Yellow for the center track and Blue for the innermost track. The three tracks are electrically isolated from each other and from any other (optional) tracks on the module.

Most modules are built with a surface area of 2 by 4 feet (0.61 by 1.22 m). The official standard allows up to an extra 6 inches (152.4 mm) of surface area on either the aisle or operator's side or both (which can lead to a module that is 3 feet (0.91 m) wide). Module lengths are typically extended in 2-foot (0.61 m) increments, but can be almost any length, limited by the modeler's abilities to build and transport the modules. Modules built to non-standard lengths must be built with consideration of the standard lengths; where appropriate, the modeler must also build a short bridge module so that the module set uses up a section of layout that is evenly divisible by 4-foot (1.22 m)-long modules.

Modules are connected electrically with two-conductor Cinch Jones plugs. Although these connectors are becoming harder and harder to obtain for many modelers, and despite continuing discussions on a new standard connector, the Cinch Jones is still used as the standard.

Recent proposals have recommended that Anderson Powerpoles should be used for electrical connections. In addition, new standards have been written to comply with the new National Fire Code. These include the prohibition of module-mounted power strips. These new standards are available for review at the NTRAK website.

Alternatives

In recent years other, often complementary, module standards have cropped up to address perceived deficiencies with NTrak's standard.

oNeTrak

A oNeTrak module

One example of these perceived deficiencies is the requirement for NTrak modules to have three mainline tracks. On the prototype, except in a few areas where traffic density dictates the need for three (or more) mainline tracks, most mainlines throughout North America are single or double track.

oNeTrak is designed around the concept of a single track mainline and as such allows for a greater range of railroad scenes to be modeled compared to Ntrak. oNeTrak also allows for more prototypical operations as trains on a single track main often have to meet and/or pass each other during operation of the layout.

Smart-N

Smart-N is designed around the concept of a double track mainline. (Smart-N is now better referred to as T-Trak).

Bend Track

Bend Track is designed around a double track mainline which traverses each module twice, once on each side, with flexible module shape and no "pit" area.

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.