Nyon–St-Cergue–Morez Railway

The Nyon–St-Cergue–Morez railway (NStCM), French: Chemin de Fer Nyon–St. Cergue–Morez, is a narrow gauge railway in western Switzerland which nowadays operates between Nyon, on the northern shore of Lake Geneva and the French border at La Cure, the La Cure–Morez section having closed in 1958. The railway reaches a height of 1,228 metres (4,029 feet) above sea level at the Col de la Givrine and it is the highest in the Jura Mountains.

Nyon–St-Cergue–Morez railway
Overview
Type Commuter rail
Locale Vaud, Switzerland
Termini

Nyon

La Cure
Stations 17
Services 1
Operation
Opened 1916
Technical
Line length 26.70 km (16.59 mi)
Number of tracks 1
Track gauge 1,000 mm (3 ft 3 38 in)
Electrification Overhead lines, 1500 V DC (since 1985)
Operating speed 0 mph (0 km/h)
Highest elevation 1,232 m (4,042 ft)
Nyon–La Cure
0km / 0hour Nyon 395 m
Gare souterraine210 m
1.1 / 0:01 Les Plantaz 420 m
Depot
2.4 / 0:02 La Vuarpiliere
3.0 / 0:03 L'Asse 466 m
Asse-Viadukt74 m
4.4 / 0:06 Trélex 501 m
Colline-Viadukt110 m
6.4 / 0:10 Givrins 554 m
7.5 / 0:12 Genolier 562 m
8.5 / 0:14 Sus-Châtel 598 m
9.8 / 0:16 La Joy-Clinique
11.1 / 0:19 Le Muids 715 m
12.1 / 0:20 Bassins 756 m
Tunnel Bassins116 m
13.9 / 0:24 Arzier 842 m
17.1 / 0:29 La Chevrerie-Monteret 970 m
19.1 / 0:32 St Cergue 1047 m
Tunnel St-Cergue99 m
22.1 / 0:37 Les Pralies 1146 m
23.3 / 0:39 La Givrine 1208 m
27.0 / 0:45 La Cure 1155 m
Swiss / French border
27,3 La Cure (F) 1152 m
29,5 Les Rousses 1110 m
Sous-les-Barres 940 m
Tunnel Sous-les-Barres96 m
33,8 Gouland 895 m
Tunnel Turu58 m
La Doye
Pont de la Bienne
Morez Ecole
38,2 Morez Ville 701 m
39,1 Morez SNCF 734 m
Railcars on shed : ACMV/BBC Type Be4/4 205 in 'new livery' (left) alongside SWS/SAAS Type BDe4/4 231 ex-CJ No.606, photographed at Saint-Cergue.

History

The line, built to 1,000 mm (3 ft 3 38 in) gauge, was opened in three sections, the first from Nyon, a town on the shores of Lake Geneva, to the Jura mountain resort village of Saint-Cergue on 12 July 1916, then to the French border at La Cure, opened on 18 August 1917. The third section, built by the French Company Chemins de fer électriques du Jura (CFEJ), taking the line over the border was opened to the French town of Morez on 7 March 1921 giving a total length of 39 km (24 mi). In effect this small line linked the Swiss railways main line from Geneva to Lausanne to that of the Chemin de Fer Paris, Lyon, Mediterranee (PLM) (from 1938 this was the SNCF). With the exception of the period from 1940 to 1948 this enabled direct services to operate on a daily basis, although wintertime conditions often made this a difficult feat. Because of its steep gradients the line was electrified from the outset at the unusual, if not unique, 2,200 Volts DC. The 12-kilometre (7.5 mi) French section from La Cure to Morez closed on 28 September 1958.

The line

Originally the line commenced outside the main station in Nyon and after passing below the Swiss Federal Railways main line it climbed steadily, steeply in places taking large curves to ease the gradient, to the mountain resort of St. Cergue. From here it runs alongside the road through the Col de la Givrine, with a summit of 1,232 m (4,042 ft). above sea level, to the village of La Cure, nowadays its upper terminus. It was here the line crossed the French border and again running alongside the road, passing the village of Les Rousses it duly arrived in the streets of Morez. The line then descended steeply to terminate in front of the PLM station.

Locomotives and Rolling Stock

No. Type Seats: 2nd+1st Builders Details Date Built Notes.
1 ABDe4/4 20+5 SWS/BBC 1916Sold 1982, Chemin de fer de la Mure
2 ABDe4/4 30+6 CGV/BBC 19361961 ex-CFEJ No.2:Withdrawn 1986
3 ABDe4/4 18+6 D&B/BBC 19241961 ex-CFEJ No.1:Scrapped after accident 1980
5 ABDe4/4 20+5 SWS/BBC 1916Sold 1986, Chemin de fer de la Mure
6 ABDe4/4 20+5 SWS/BBC 1916Withdrawn 1983
10 ABDe4/4 10+5 SWS/BBC 1918Sold 1992, Chemin de fer de la Mure
11 ABDe4/4 10+5 SWS/BBC 1918Sold 1992, Chemin de fer de la Mure
201Be4/4 40ACMV/BBC 1985
202Be4/4 40ACMV/BBC 1985
203Be4/4 40ACMV/BBC 1985
204Be4/4 40ACMV/BBC 1985
205Be4/4 40ACMV/BBC 1986
211BDe4/4 24ACMV/ABB 1991baggage area but fewer seats
221BDe4/4 40 1936Ex-LEB No.22, 1991
231BDe4/4 32SWS/SAAS 1953Ex-CJ No.606, 2003
232BDe4/4 32SWS/SAAS 1953Ex-CJ No.607, 2007
251XTm2/2 Beilhack/Deutz1984Fitted with Hiab lifting equipment.
261Tm2/2 O&K/Deutz 1958Type MV4A, Wks No.25845. Rebuilt 1996.
301Bt 52ACMV/BBC 1985driving trailer
302Bt 52ACMV/BBC 1985driving trailer
303Bt 52ACMV/BBC 1985driving trailer
304Bt 52ACMV/BBC 1985driving trailer
305Bt 52ACMV/BBC 1986driving trailer
331Bt 48SIG/SAAS 1952driving trailer, ex-CJ No.705
341B 66SWS 1949ex BTI B41 in 1978 ex BD B41 in 1969
342B 66SWS 1949ex BTI B42 in 1978 ex BD B42 in 1969
381D SWS 1913ex-YSteC DZ 62 ex PTT (RhB) Z4° 76 ex 88 1955 rebuilt with bogies ex Z° 26 ex 321

Abbreviations

Modernisation

The earliest section to open, that in Switzerland, continued after the closure of the French section and in the 1980s was part of a modernisation programme. The overline line voltage was changed from 2,200 Volts DC to the more common 1,500 Volts DC[1] and automatic block signalling was installed. Work to modernise the infrastructure and implement the voltage change took place throughout 1984 and 1985. The St. Cergue–La Cure section was changed to the new, reduced voltage in mid-October 1985 and the Nyon–St. Cergue section followed on 5 December 1985.[1] As part of this modernisation, new rolling stock was purchased, and arrived starting in autumn 1985. These were new automotrice (powered driving railcars) and matching voitures pilote (driving trailers). During the transitional phase in the line voltage, the old cars were able to continue in service after the reduction in voltage, but at reduced speed. The old stock ran for the last time on 20 December 1985, and from 21 December all service was operated by the new trains.[1]

Plans were put forward in 1999 to extend the line some 2.5 km (1.6 mi) over the French border to the village of Les Rousses but this did not prove cost effective to the communities involved and was rejected. In 2004, the Nyon terminus was moved to a two platform underground station on the north side of the main line approached by escalators from the station underpass.

Preservation

The original “automotrice”, of which 7 were built, were heavy duty vehicles and could haul several trailer cars. Two of these have survived, restored to working order, at the Chemin de Fer de la Mure near Grenoble. Two other examples were sold to the same railway but have yet to be restored. Some trailer cars have also survived including No. B7 which has been restored at the Blonay–Chamby museum railway near Montreux and another example at the Chemin de Fer Voies Ferrees du Velay in Haute Loire. The vehicles carried a dark red livery.

References

  1. 1 2 3 Cross, Barry; Hofmann, Pierre (April 1994). "Nyon – St. Cergue – Morez: An international light rail line". Light Rail & Modern Tramway. UK: Ian Allan Publishing. pp. 87–93. ISSN 0964-9255.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.