Midland Highway (Tasmania)

Midland Highway
Tasmania
Midland Highway, at Dysart
General information
Type Highway
Length 176 km (109 mi)
Route number(s) National Highway 1
(Hobart-Launceston)
Former
route number
State Route 1[1]
Major junctions
South end Brooker Highway Granton, Hobart
 
North end Bass Highway Launceston, Tasmania
Location(s)
Region Tasmania
Major settlements Perth, Epping Forest, Campbell Town, Ross, Oatlands, Bagdad, Brighton, Bridgewater
Highway system

  • Infobox instructions
  • guidelines
  • examples
  • talk
Map of Midland Highway, Tasmania

The Midland Highway (also known as the Midlands Highway) is one of Tasmania's major inter-city highways, running for 176 kilometres (109 mi) between Hobart and Launceston. It is part of the AusLink National Network and is a vital link for road freight to transport goods to and from the two cities. It represents a major north–south transportation corridor in Tasmania and has the route 1 designation as part of the National Highway. The highway consists of various traffic lane arrangements, the most common being two lanes one in each direction, with overtaking options and at-grade intersections. At both the Launceston and Hobart sections of the highway there are small portions of grade-separated dual carriageway.

History

Surveyor Grimes marked out the track from Hobart to Launceston in 1807, and Governor Macquarie followed the route in 1811 when he visited the colony accompanied by his wife. The party took five and a half days to complete the journey.

Macquarie again visited the colony in 1821, when the road was fit for a carriage, but his journal records many different sections, and it was not until 1831 that the first regular coach service was operated by J. E. Cox.

The first mailman, Robert Taylor, was appointed in 1816, he walked, leaving Hobart and Launceston on alternate Sundays and carrying the mail in a pack.

The first record of movement between the two centres was in 1821 when then Governor Lachlan Macquarie selected sites for towns on the highway.

It was known as the 'Main Road' or 'Hobart Road' for most of its history. In the 1930s it became known as the Midland Highway, and in the 2000s - it also had 'The Heritage Highway' label applied to it.

The route of the highway originally ran between Hobart and Launceston, and passed through the localities which are now known as: Bridgewater, Brighton, Pontville, Mangalore, Bagdad, Dysart, Kempton, Melton Mowbray, Jericho, Oatlands, Antill Ponds, Woodbury, Tunbridge, Ross, Campbell Town, Conara Junction, Cleveland, Epping Forest, Perth, Breadalbane and Kings Meadows.

Recent upgrades

A number of two lane bypasses of towns and villages have been constructed since the early 1980s, including the Jericho bypass, which was opened to traffic in January 1982.[2]

Construction of grade separated dual carriageways leading south of Launceston and north of Hobart provided new superior facilities for Midland Highway traffic and shortened the route officially designated the Midland Highway.

On 21 June 1983, what was then referred to as the ‘Hobart Northern Outlet Road’ was opened to traffic. Now called the Brooker Highway, this completed a grade-separated dual carriageway between Claremont Interchange and Granton in the northern suburbs of Hobart.[3]

Construction of the first stage of the Launceston Southern Outlet between Glen Dhu and Strathroy commenced in February 1981 and comprised the construction of 7.4 km of dual carriageway and included three major bridges, namely the Mt Pleasant Interchange, the Westbury Road Overpass and the Glen Dhu Overpass. The highway opened to traffic between the Glen Dhu interchange and the temporary connection onto the old Midland Highway at Jinglers Creek, Strathroy.[4] The extension of the Launceston Southern Outlet Road between Breadalbane and Strathroy opened to traffic on 28 August 1987. This extension included the construction of 3.7 km of dual carriageway and a roundabout, linking the Outlet Road with the Midland Highway and Evandale Main Road.[5] The third and final section of the Launceston Southern Outlet opened to traffic on 24 May 1988. The road works involved construction of 1 km of dual carriageway between Glen Dhu Overpass and the Frankland Street/Wellington Street intersection.[6]

In October 2012, the Brighton Bypass was officially opened, six months ahead of schedule. This bypass is a grade separated dual carriageway of the towns of Brighton and Pontville, just beyond Hobart’s northern suburbs. The total cost of the bypass was A$191 million.[7]

In 2002, a railway line underpass was constructed near Symmons Plains, south of Perth, to create a grade separated rail crossing on the highway itself. Significant numbers of overtaking lanes have also been extended or created.

Future

There has been mounting pressure for the Highway to be upgraded to a four-lane carriageway for 20 years to fall in line with the Auslink network of highways such as the Hume and Pacific as it is Tasmania's most heavily travelled stretch of long highway.

The State and federal Liberal Parties have pledged $400 million to the funding of a dual-carriageway highway between Hobart and Launceston.[8] The Liberal Party's claim is that when taking into account the Brighton Bypass, the Southern Outlet and the 34 km of overtaking lanes, there are 120 km (75 mi) of single-carriageway road on the Midland Highway.[8] The Australian Labor Party stated that the 400 million-dollar budget is grossly underfunded,[9] and could not possibly be constructed for that price.

The Liberal Party defended the accusations that the $3 million/km budget[8] is too low by stating that they are not planning any new road alignments or bypasses, just adding new lanes to the existing alignment. They have not stated if they plan to include grade separation or T-junctions and roundabouts. Should both the federal and state Liberal Parties win the next elections, they plan to upgrade this remaining stretch of road from 2014 progressively.[10]

Currently, there are several projects/proposals;

Brighton

The 9.5 km (5.9 mi) bypass on the southern stretch of the Highway was recently opened as part of the Southern Transport Investment Program, A Transport masterplan for the southern part of the Highway. The Transport study also caters for the Bagdad Bypass and the replacement of the ageing Bridgewater Bridge

Perth

The Perth Bypass is proposed to be constructed in 2 stages starting with the South Perth bypass which will result in a direct route to Illawarra Main Road - A vital link road to the Bass Highway.[11] There are also plans to Duplicate the Midland Highway Between Perth and Launceston.[12]

See also

Notes

  1. Former State Route Numbering System in Tasmania, Ozroads: the Australian Roads Website. Retrieved on 30 January 2008.
  2. Report for year 1981-1982, Parliament of Tasmania, Department of Main Roads, 1983, p. 23
  3. Report for year 1982-1983, Parliament of Tasmania, Department of Main Roads, 1984, p. 21
  4. Annual Report 1984-1985, Tasmania, Department of Main Roads, 1985, p. 18
  5. Annual Report 1987-1988, Tasmania, Department of Main Roads, 1988, p. 30
  6. Annual Report 1987-1988, Tasmania, Department of Main Roads, 1988, p. 32
  7. Annual Report 2012-13, Tasmanian Government, Department of Infrastructure, Energy and Resources, 2013, p. 7
  8. 1 2 3 http://tasliberal.com.au/policy/four-lane-midland-highway
  9. http://www.themercury.com.au/article/2010/02/19/128891_tasmania-news.html
  10. http://www.liberal.org.au/news.php?Id=4831
  11. http://www.dier.tas.gov.au/__data/assets/pdf_file/0009/81945/Burnie_to_Hobart_Freight_Corridor_Illawarra_Main_Road_Upgrades_and_South_Perth_Bypass.pdf
  12. http://www.dier.tas.gov.au/__data/assets/pdf_file/0004/81958/Burnie_to_Hobart_Freight_Corridor_Midland_Highway_-_Duplication,_Perth_to_Breadalbane_01.pdf

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.