Metro 4 (Mumbai Metro)

Metro 4
Overview
Other name(s) Line 4
Type Metro
System Mumbai Metro
Status Under Construction
Locale Mumbai and Thane, Maharashtra, India
Termini Kasarvadavali
Wadala
Stations 32
Operation
Operator(s) Mumbai Metro
Character Elevated
Technical
Line length 32.32 km (20.08 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

Metro 4 of the Mumbai Metro is part of the metro system for the city of Mumbai, India. The 32.32 km (20.08 mi) line is fully elevated, and consists of 32 stations from Wadala to Kasarvadavli. It is estimated to cost of ₹14,549 crore.[1]

Planning

The Maharashtra Cabinet approved the Metro 4 corridor on 27 September 2016. Half of the project cost will be funded by the Centre and the State Government, while the remaining will be financed through loans from the Asian Development Bank and the World Bank.[2][3]

The foundation stone for Metro 4 was laid by Prime Minister Narendra Modi on 24 December 2016.[4] The MMRDA invited bids for civil work on the corridor on 4 January 2017.[5][6][7] The tenders for construction of viaducts and stations were divided into 5 packages - Wadala to Amar Mahal Junction, Garodia Nagar to Surya Nagar, Gandhi Nagar to Sonapur, Mulund Fire Station to Majiwada and Kapurbawdi to Kasarvadavali.[8][9] Metro 4 was tendered alongside Metro 2B. L&T, Afcons Infrastructure, Tata, NCC and JMC, Reliance Infrastructure-RdE, JKumar Group, ITD Cementation, CHEC-TPL bid for packages on both Metro 2B and Metro 4. A total of 10 firms and/or consortia submitted bids for the two lines, two of whom (Simplex Infrastructures and a consortium of GHEC-RCC-JV-China) bid exclusively for Metro 2B packages.[10][11]

The Maharashtra Coastal Zone Management Authority granted Coastal Regulation Zone (CRZ) to the project in February 2017. Over 1 km of the line passes over water bodies in Bhakti Park and Wadala, both areas classified as Coastal Regulation Zone II where CRZ rules limit construction activities. 48 piers are proposed to built in the CRZ II. The MMRDA will construct metro car depots for the line on a 30 hectare plot at Owala village in Thane district and another in Vikhroli.[12]

The MMRDA utilized a drone to carry out survey work for Metro 4. The drones were fitted with 360 degrees camera that provide up to 3 millimeter accuracy. The aerial survey takes less time than a regular survey, achieves greater accuracy and helps protect against false claims for compensation.[13]

In March 2017, the MMRDA stated that it was conducting a pre-feasbility study on extending the line from Wadala to Mumbai General Post Office in South Mumbai, via the Mumbai Port Trust. The proposed 8 km extension is estimated to cost 300 crore per km.[14][15]

The MMRDA plans to begin construction of the line in July 2017.[16]

Stations

32 stations are being planned on Line 4.

# Station[17] Grade Connections Status
1 Kasarvadavali Elevated None Under Construction
2 Vijay Garden Elevated None Under Construction
3 Dongari Pada Elevated None Under Construction
4 Tikuji-Ni-Wadi Elevated None Under Construction
5 Manpada Elevated None Under Construction
6 Kapurbawdi Elevated None Under Construction
7 Majiwada Elevated None Under Construction
8 Cadbury Junction Elevated None Under Construction
9 Mahapalika Marg Elevated None Under Construction
10 RTO Thane Elevated None Under Construction
11 Thane Teen Haath Naka Elevated None Under Construction
12 Mulund Naka Elevated None Under Construction
13 Mulund Fire Station Elevated None Under Construction
14 Sonapur Elevated None Under Construction
15 Shangrila Elevated None Under Construction
16 Bhandup Metro Elevated None Under Construction
17 Bhandup Mahapalika Elevated None Under Construction
18 Naval Housing Elevated None Under Construction
19 Gandhi Nagar Elevated None Under Construction
20 Surya Nagar Elevated None Under Construction
21 Vikhroli Metro Elevated None Under Construction
22 Godrej Company Elevated None Under Construction
23 Shreyes Cinema Elevated None Under Construction
24 Lakshmi Nagar Elevated None Under Construction
25 Pant Nagar Elevated None Under Construction
26 Garodia Nagar Elevated None Under Construction
27 Amar Mahal Junction Elevated Line 2 Under Construction
28 Siddharth Colony Elevated None Under Construction
29 Suman Nagar Elevated None Under Construction
30 Anik Nagar Bus Depot Elevated None Under Construction
31 Wadala TT Elevated None Under Construction
32 Bhakti Park Metro Elevated None Under Construction

The car depot will be located at Owale.[1]

References

  1. 1 2 "Everything you need to know about Metro 2B and Metro 4 | Free Press Journal". Free Press Journal. Retrieved 12 February 2017.
  2. "Maharashtra Cabinet Gives Go-Ahead For Two Metro Lines". NDTV.com. Retrieved 14 October 2016.
  3. "Mumbai to get two more Metro Rails". Business Standard India. 27 September 2016. Retrieved 14 October 2016.
  4. "MMRDA invites civil work bids for two Metro projects". The Times of India. Retrieved 10 February 2017.
  5. "MMRDA invites bids for 2 metro projects". dna. 5 January 2017. Retrieved 10 February 2017.
  6. "MMRDA invites tenders for design, construction of stations, viaducts for new Metro routes". The Indian Express. 5 January 2017. Retrieved 10 February 2017.
  7. "Racing against 2021 deadline, Maharashtra opens bids for two more Metro lines". Hindustan Times. 5 January 2017. Retrieved 10 February 2017.
  8. Correspondent, Special. "MMRDA invites tenders for Metro-2B and 4". The Hindu. Retrieved 12 February 2017.
  9. "Mumbai commute to get faster, firms queue up to build two more Metro lines". Hindustan Times. 13 May 2017. Retrieved 13 May 2017.
  10. "MMRDA receives interest from domestic, foreign firms for metro". India Today. Retrieved 13 May 2017.
  11. "R Infra, 10 others bid for Metro-2B, Metro-4 corridors". Asian Age. 13 May 2017. Retrieved 13 May 2017.
  12. "Wadala-Thane metro line clears CRZ hurdle - Mumbai Mirror -". Mumbai Mirror. Retrieved 27 February 2017.
  13. "MMRDA plans drone survey for other Metro lines". The Indian Express. 7 March 2017. Retrieved 7 March 2017.
  14. "MMRDA plans to extend Metro-IV route from Wadala to GPO". The Times of India. Retrieved 17 March 2017.
  15. "Mumbai Metro's Thane-Wadala line likely to be extended to CST/GPO | Latest News & Updates at Daily News & Analysis". dna. 16 March 2017. Retrieved 17 March 2017.
  16. "Mumbai: MMRDA plans to begin work on five more Metro lines by December". The Indian Express. 7 April 2017. Retrieved 7 April 2017.
  17. "Line 4-Project Features-Stations". MMRDA. Retrieved 2017-06-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.