Manila Metro Rail Transit System Line 7
MRT Line 7 | |
---|---|
MRT7 | |
Overview | |
Type | Rapid transit |
System | Manila Universal MRT System |
Status | Under construction |
Locale | Metro Manila and Bulacan |
Termini |
San Jose del Monte North Avenue |
Stations | 14 |
Services | 1 |
Daily ridership |
300,000 (initial) 800,000 (design capacity) |
Operation | |
Opened | April 2020 (Estimated) |
Owner | Universal LRT Corp BVI Ltd (ULC) |
Operator(s) |
Universal LRT Corp BVI Ltd (ULC) Department of Transportation |
Rolling stock | Hyundai Rotem (108 train cars) [1] |
Technical | |
Line length | 22.8 km |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | Not yet known |
The Manila Metro Rail Transit System Line 7 (MRT-7) is an under construction rapid transit line in the Philippines. When completed, the line will be 22.8 kilometers long serviced by 14 stations. The line runs in a northeast direction, starting from North Avenue, Quezon City up to San Jose del Monte, Bulacan. MRT Line 7 will traverse Quezon City and Caloocan in Metro Manila, and will end at San Jose del Monte, Bulacan.
The MRT-7 project will cost an estimated US$ 1.54 billion or PHP 62.7 billion.[2] Under the plan, it will have a combined 44 kilometers of road and rail components stretching from the Bocaue exit of the North Luzon Expressway (NLEX) to the intersection of North Avenue and Epifanio de los Santos Avenue (EDSA). The 22 kilometers, 6-lane asphalt road will connect the NLEX to a major transportation intermodal hub in San Jose del Monte.
History
Universal MRT Corporation, which was composed of a consortium of the Tranzen Group, EEI Corporation and SM Prime Holdings and led by former Finance Secretary Roberto de Ocampo submitted an unsolicited proposal to the Philippine Department of Transportation in 2002. In June 2007, DOTC presented a Swiss Challenge in which four business firms submitted their counter proposal. In January 2008, DOTC announced that the ULC proposal emerged as winner and the contract was signed. San Miguel Corporation acquired a majority stake in Universal MRT Corporation (ULC) in October 2010.[3]
In May 2009, The Investment Coordination Committee (ICC) of the National Economic and Development Authority (NEDA) approved the MRT-7 project. Construction of MRT-7 should have commenced in January 2010, but has been postponed several times.[4]
In January 2016 Hyundai Rotem announced that it won a US$ 440.2m contract with Universal MRT Corporation (ULC) to supply 108 Metro Cars, Signalling, Communication and Power supply systems.[5][6]
In February 2016, San Miguel Corporation started construction related activities including soil testing and surveying.[7]
The project broke ground on April 20, 2016 and its target completion is by April 2020.[8] The event was attended by President Benigno Aquino III and he emphasized that after the completion of the project, 350,000 passengers will benefit from the rail transit everyday.[9]
The planned stations (listed south to north) are:
Station | City |
---|---|
North Avenue | Quezon City |
Quezon Memorial | |
University Avenue | |
Tandang Sora | |
Don Antonio | |
Batasan | |
Manggahan | |
Doña Carmen | |
Regalado Highway | |
Mindanao Avenue | |
Quirino | |
Sacred Heart | Caloocan |
Tala | |
San Jose del Monte | San Jose del Monte, Bulacan |
See also
References
- ↑ http://www.railjournal.com/index.php/asia/hyundai-rotem-trains-for-manila-line-mrt-7.html
- ↑ "SMC vows to finish MRT 7 project by August 2019". Public–Private Partnership Center. 28 April 2014. Retrieved 2 October 2015.
- ↑ "Infrastructure". San Miguel Corporation. Retrieved 2 October 2015.
- ↑ "Construction of MRT-7 seen to start in 2014". Philippine Daily Inquirer. November 29, 2013.
- ↑ Barrow, Keith. "Hyundai Rotem trains for Manila Line MRT-7". Retrieved 2016-07-17.
- ↑ "Hyundai Rotem wins $440mn turn-key project in Philippines – Pulse by Maeil Business News Korea". pulsenews.co.kr. Retrieved 2016-07-17.
- ↑ Daxim L. Lucas (15 Feb 2016). "SMC seals financing for P63B MRT-7 commuter project". Inquirer. Retrieved 15 March 2016.
- ↑ Ces Dimalanta and Emmie Abadilla (20 Apr 2016). "DOTC, SMC break ground for P69.3B MRT-7". Manila Bulletin. Retrieved 20 April 2016.
- ↑ "Construction Begins for MRT Line 7, Connecting QC to Bulacan". PropertyAsiaPH. 20 Apr 2016. Retrieved 6 June 2016.