Luinoā€“Milan railway

Luinoā€“Milan railway
Overview
Status in use
Locale Lombardy, Italy
Termini Luino
Milan
Operation
Opened 17 March 1884
Owner RFI
Operator(s) TiLo, Trenord
Technical
Track gauge 1,435 mm (4 ft 8 1ā„2 in) standard gauge
Electrification 3 kV DC
Route map
Legend
from Cadenazzo
50.715 Luino 204 m
43.876 Porto Valtravaglia 216 m
42.092 CaldĆØ 213 m
Laveno (2935 m)
Saronnoā€“Laveno railway (FN)
RFI-FN connection
36.148
31.236
Laveno-Mombello 206 m
Mombello (1136 m)
to Oleggio
27.970 Sangiano 223 m
23.596 Besozzo 231 m
19.126 Travedona-Biandronno 249 m
15.965 Ternate-Varano Borghi 258 m
Del Ronco (1585 m)
9.517 Mornago-Cimbro 274 m
5.161 Besnate 277 m
from Domodossola / from Porto Ceresio
0.000 Gallarate 242 m
see Domodossolaā€“Milan railway
Milano Centrale 130 m

Luinoā€“Milan railway is a railway line in Lombardy, Italy.

The railway line was opened on 17 March 1884,[1] to provide, together with the Luinoā€“Oleggio railway, a second access to the Gotthard railway.

Notes

  1. ā†‘ Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 dicembre 1926

See also

Media related to Gallarateā€“Laveno railway at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.