Little India MRT Station

 NE7  DT12 
Little India
小印度
லிட்டில் இந்தியா
Little India
Rapid transit

Interior of Downtown Line's Little India MRT station
Location 60 Bukit Timah Road
Singapore 229900
62 Bukit Timah Road
Singapore 229902
Coordinates 1°18′24″N 103°50′57″E / 1.306725°N 103.849175°E / 1.306725; 103.849175
Operated by SBS Transit (ComfortDelGro) (North East Line)
SBS Transit DTL (Downtown Line)
Line(s)
Platforms Island
Tracks 4
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 3
Disabled access Yes
Other information
Station code  NE7  DT12 
History
Opened 20 June 2003 (North East Line)
27 December 2015 (Downtown Line)
Electrified Yes
Previous names Kandang Kerbau
Services
Preceding station   Mass Rapid Transit   Following station
towards HarbourFront
North East Line
towards Punggol
towards Bukit Panjang
Downtown Line
towards Chinatown
Location
Signage of Downtown Line's Little India Station
Platform of North East Line's Little India MRT station
Little India MRT station exits
Interior of NE7 Little India Station
Exterior view of Little India Station

Little India MRT Station (NE7/DT12) is an underground Mass Rapid Transit interchange station on the North East Line and the Downtown Line located at the boundary of the planning areas of Kallang and Rochor, Singapore. The station derives its name from the ethnic district of Little India.[1]

This station was built in the heart of Little India, with Tekka Centre and The Verge within walking distance of the station.

History

Before the station was built, it was called Kandang Kerbau. It was renamed to Little India to reflect the station's heritage since 2001.

On 20 December 2012, train services on the North East Line was delayed due to a train fault. A statement from SBS Transit said there was no train service between Punggol and Little India due to a train fault. Free bus rides were made available at designated bus stops near affected NEL stations. At about 5.18 pm, all train services resumed. SBS Transit has apologised for the inconvenience caused.[2][3]

A commuter's leg got trapped in the gap between the MRT train and the station platform on 24 April 2013. She says she was pushed. Madam Ong told The Straits Times about her ordeal at Little India station, during the morning rush-hour. She had been standing by the doors while taking a crowded train on the North-East Line from Farrer Park to HarbourFront when she was "pushed". The secretary in her 40s said, "About three people exiting the train pushed me from the back, even though I was trying to give way by stepping out of the train first so they could get out." It was then that her left leg slipped into the 10 cm platform gap and got trapped.[4]

No one was injured in a fire that broke out at a Downtown Line worksite along Race Course Road on the evening of 26 March 2014. The Land Transport Authority (LTA) told Yahoo Singapore that a “small fire” had broken out at a “localised area” within the worksite of the Downtown Line Little India MRT station. “There is also no impact to DTL2 construction progress,” added a spokesperson for the LTA, who added that the fire was put out by 10pm, after it first broke out about half an hour earlier.[5]

Art in Transit

The artwork featured in the North East Line section features Memoirs of the Past by S. Chandrasekaran. The animal paintings echos the past of Little India when buffalo stables were seen.

The Downtown Line section features "Woven Field" by Grace Tan. It features a landscape of tessellated triangular configurations inspired by the singhaulia woven patterns commonly seen in the traditional sari.

Station layout

L1 Street Level
B1 NEL Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transfer Linkway
B2 Mezzanine Transfer Linkway between North East and Downtown Line Concourses
DTL Concourse Faregates, Ticketing Machines, Station Control, Transfer Linkway
Platform A North East Line towards  NE1  CC29  HarbourFront via  NE6  NS24  CC1  Dhoby Ghaut
Island platform, doors will open on the right
Platform B North East Line towards  NE17  PTC  Punggol via  NE8  Farrer Park
B3 Platform B Downtown Line towards  DT19  NE4  Chinatown via  DT13  Rochor
Island platform, doors will open on the right
Platform A Downtown Line towards  DT1  BP6  Bukit Panjang via  DT11  NS21  Newton

Exits

Transport connections

Rail

Destination First Train Last Train
Mon – Fri Sat Sunday &
Public Holiday
Daily
North East Line
to NE1 HarbourFront 6.04am 6.03am 6.24am 11.49pm
to NE17 Punggol 5.56am 6.11am 6.31am 12.06am
Downtown Line
to DT1 Bukit Panjang 6.07am 6.07am 6.30am 12.24am
to DT19 Chinatown 5.53am 5.53am 6.13am 11.59pm

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.