List of power stations in Pakistan
This is a list of Power Stations in Pakistan. Pakistan had a total installed power generation capacity of almost 25 GW in 2017. However, dependable or de-rated capacity is approximately 19 GW during the year, due to variety of factors, whereas demand for electricity is increasing at an average annual rate of eight per cent. And according to World Energy Statistics 2011, published by IEA, Pakistan's per capita electricity consumption is one-sixth of the World Average. World average per capita electricity consumption is 2730 kWh compared to Pakistan's per capita electricity consumption of 451 kWh. International Energy Agency has forecast that total electricity demand of the country will be 49,078 MW in 2025.[1]
Pakistan has an installed electricity generation capacity of 25,100 MW in 2017.[2] The average demand is 22,000 MW and the shortfall is between 5,000 and 6,000 MW. Oil (35.2 per cent), hydel (29.9 per cent), gas (29 per cent), and nuclear, solar and imported (6 per cent) are the principal sources. In the next 10 years, peak electricity demand is expected to rise by four to five per cent, which is roughly 1,500 MW. This dismal forecast is due to a lopsided energy mix, diminishing indigenous fuel reserves, increasing circular debt and transmission hold-ups. Pakistan has almost exhausted its gas reserves. Imported oil's price hikes affect the budget and its constant supply cannot be guaranteed. Pakistan has the potential to meet these energy challenges through hydroelectric power, but there are political and environmental issues in building dams. Rationality demands reducing reliance on oil and going for alternatives. The development of alternatives does not happen overnight. Pakistan will have to rely on imported fuels for the interim period at a huge cost. LNG is difficult to import, using coal has environmental issues, using shale gas also has environmental issues attached with it, and wind power has transmission network challenges.[3] With total estimated coal reserves of over 186bn tonnes, Pakistan ranks sixth among coal-rich countries. Yet, coal's potential has not been exploited adequately.[4]
Thermal
In service
Station | Location | Coordinates | Capacity (MW) | Notes | Refs |
---|---|---|---|---|---|
Kot Addu Power Company Limited | Muzaffargarh, Punjab | 24°54′21″N 66°41′41″E / 24.9057°N 66.6946°E | 1,350 | Multi Fuel-Fired Thermal Station. | [5][6][7][8] |
Hub Power Company Limited (HUBCO) | Hub, Balochistan | 1,292 | Furnace Oil Fired Plant. | [9] | |
Hubco Narowal Power Plant (HNPP) | Narowal, Punjab | 32.059067, 74.781222, | 225 | Furnace Oil Fired Plant. | |
Nishat Power Limited | Lahore, Punjab | 31.122560, 73.905405 | 200 | Furnace Oil Fired Plant. | |
Nishat Chunian Power Limited | Lahore, Punjab | 200 | Furnace Oil Fired Plant. | ||
Saba Power Company Limited | Sheikhupura, Punjab | 31.733013, 73.873654 | 125 | Furnace Oil Fired Plant. | [6] |
Southern Electric Power Company Limited | Raiwind, Lahore | 31.291388, 74.249188 | 136 | Furnace Oil Fired Plant. | |
Tapal Energy Ltd | Karachi, Sindh | 24.999713, 66.906860 | 126 | Furnace Oil Fired Plant. | |
Japan Power Generation (Pvt) Limited | Raiwind, Punjab | 31.325566, 74.262225 | 135 | Furnace Oil Fired Plant. | |
Kohinoor Energy Limited | Lahore, Punjab | 31.263200, 74.187321 | 131 | Furnace Oil Fired Plant. | |
Liberty Power Tech | Faisalabad, Punjab | 200 | Furnace Oil Fired Plant. | ||
Pak Gen (Pvt) Limited Thermal Power Station | Muzaffargarh, Punjab | 30°06′19″N 71°09′49″E / 30.10528°N 71.16361°E | 1350 | Furnace Oil Fired Plant. | |
Jamshoro Power Station | Jamshoro, Sindh | 25°28′20″N 68°15′58″E / 25.47222°N 68.26611°E | 850 | Oil and Natural Gas-Fired Thermal Station. | [6][10] |
Bin Qasim Power Plant I | Karachi, Sindh | 24.785546, 67.358929 | 1,260 | Oil and Natural Gas-Fired Thermal Station | [6] |
Sitara Energy Limited | Faisalabad, Punjab | 31.533111, 73.393330 | 85 | Diesel and Natural Gas Fired Plant. | |
Saif Power Limited | Sahiwal, Punjab | 30.696164, 73.260541 | 225 | Diesel and Natural Gas Fired Plant. | |
Altern Energy Limited | Fateh Jang, Punjab | 29 | Gas Fired Diesel Engine. | ||
Attock Refinery Ltd | Rawalpindi, Punjab | 18 | Heavy Fuel Oil | [11] | |
Natural Gas
In service
Station | Location | Coordinates | Capacity (MW) | Notes | Refs |
---|---|---|---|---|---|
Guddu Thermal Station | Guddu, Sindh | 28°25′38″N 69°41′49″E / 28.42722°N 69.69694°E | 2,402 | Combined Cycle Power Plant | [6][12] |
Foundation Power Company (Daharki) Limited | Daharki, Sindh | 27.985137, 69.673544 | 185 | Combined Cycle Power Plant | |
Uch-I, II Power Plant | Dera Murad Jamali, Balochistan | 28.582798, 68.171539 | 1000 | Combined Cycle Power Plant[13] | |
Nandipur Power Project | Gujranwala, Punjab | 32.245294, 74.270007 | 425 | Combined Cycle Power Plant[14][15] | |
Habibullah Coastal Power (Pvt) Company | Quetta, Balochistan | 140 | Combined Cycle Power Plant | [16][17] | |
WAPDA Quetta Thermal Power Station | Quetta, Balochistan | 30°26′38″N 66°59′49″E / 30.44389°N 66.99694°E | 35 | Combined Cycle Power Plant | [18] |
Liberty Power Project | Daharki, Sindh | 235 | Combined Cycle Power Plant | ||
Rousch (Pakistan) Power Plant | Kabirwala, Punjab | 30°34′06″N 72°08′24″E / 30.56833°N 72.14000°E | 450 | Combined Cycle Power Plant | [16][19] |
Engro Powergen Qadirpur Limited | Ghotki, Sindh | 28°01′37″N 69°21′47″E / 28.02694°N 69.36306°E | 227 | Combined Cycle Power Plant | [20] |
Halmore Power Generation Company Limited | Sheikhupura, Punjab | 225 | Combined Cycle Power Plant | ||
Orient Power Company Limited | Kasur, Punjab | 229 | Combined Cycle Power Plant | [16] | |
Saif Power Limited | Sahiwal, Punjab | 229 | Combined Cycle Power Plant | ||
Bin Qasim Power Plant II | Karachi, Sindh | 24.781873, 67.359767 | 560 | Combined Cycle Power Plant | [6] |
Fauji Kabirwala Power Company | Kabirwala, Punjab | 30.524865, 71.954946 | 157 | Combined Cycle Power Plant | |
Sapphire Electric Company Limited | Muridke, Punjab | 234 | Combined Cycle Power Plant | ||
Sindh Nooriabad Power Company Pvt Ltd | Jamshoro, Sindh | 100 | Combined Cycle Power Plant | ||
Haveli Bahadur Shah Power Plant | Jhang, Punjab | 1,230 | Combined Cycle Power Plant | ||
Bhikki RLNG-based Power Project | Sheikhupura, Punjab | 1,180 | Combined Cycle Power Plant | ||
Under construction or proposed
Station | Location | Capacity (MW) | Status |
---|---|---|---|
Balloki Power Plant | Balloki, Punjab | 1,223 | Under construction. To be operational by Aug 2017. |
Grange Holdings Power Plant | Arifwala, Punjab | 163 | Under construction.[21] |
Thar Power Plant | Tharparkar, Sindh | 100 | Under construction."[22] |
Kandra Power Company | Sukkur, Sindh | 120 | LOI issued.[23] |
Rahim Yar Khan Power Plant | Rahim Yar Khan, Punjab | 1200 | LOI issued.[24] |
Bin Qasim Power Station III | Karachi, Sindh | 900 | LOI issued.[25] |
Coal
In Service
Station | Location | Capacity (MW) | Notes |
---|---|---|---|
Lakhra Coal Power Station | Jamshoro, Sindh | 150 | Operational.[4] |
Sitara Chemical Industries Ltd | Faisalabad, Punjab | 40 | Operational since Sep 2016.[26] |
Fauji Fertilizer Power Plant | Karachi, Sindh | 118 | Operational since Feb 2017.[27] |
Sahiwal Coal Power Project | Sahiwal, Punjab | 1320 | Operational since May 2017.[28][29] |
Under Construction and Proposed
Station | Location | Capacity (MW) | Notes |
---|---|---|---|
Maple Leaf Power Ltd | Mianwali, Punjab | 40 | Under construction. To be operational by Mar 2018.[30] |
Port Qasim Coal Power Project | Karachi, Sindh | 1320 | Under construction. To be operational by May 2018.[31] |
Sindh Engro Coal Power Project | Tharparkar, Sindh | 660 | Under construction. To be operational by Jun 2019.[32] |
Hub Coal Power Project | Hub, Balochistan | 1320 | Under construction. To be operational by Aug 2019.[33][34] |
Siddiqsons Energy Ltd | Karachi, Sindh | 330 | Under construction. To be operational by 2019.[35] |
Lucky Electric Power | Karachi, Sindh | 660 | Under construction. To be operational by 2020.[36] |
ThalNova Power Pvt Ltd | Tharparkar, Sindh | 330 | Under construction. To be operational by 2020.[37] |
Thar Energy Ltd | Tharparkar, Sindh | 330 | Under construction. To be operational by 2020.[38] |
K-Electric Coal Power Plant | Karachi, Sindh | 700 | Under construction. To be operational by 2021.[39] |
Sugarcane Husk Power Project | Muzaffargarh, Punjab | 120 | Under construction.[40] |
Gwadar Coal Power Project | Gwadar, Balochistan | 300 | LOI issued.[41][41] |
Jamshoro Coal Power Project | Jamshoro, Sindh | 600 | LOI issued.[42] |
Oracle Coalfields PLC | Tharparkar, Sindh | 1320 | LOI issued.[43][44] |
Hydroelectricity
In service
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Tarbela Dam | Tarbela, Khyber Pakhtunkhwa (KPK) | 34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E | 3,478 | Operational since 1974. 1410 MW Tarbela-IV Extension is underway to be completed by June 2018 and increase the capacity to 4,888 MW.[45] Feasibility study of Tarbela-V Extension has been completed that would generate additional 1,320 MW electricity and increase the capacity to 6,208 MW in almost four years.[46][47][48][49][50] |
Ghazi-Barotha Hydropower Project | Attock, Punjab | 33°46′48″N 72°15′35″E / 33.78000°N 72.25972°E | 1,450 | Operational since 2002; Run-of-the-river |
Mangla Dam | Mirpur, AJK | 33°08′31″N 73°38′42″E / 33.14194°N 73.64500°E | 1,150 | Operational since 1967. Mangla Refurbishment Project is under construction wherein the generating units of Mangla Hydel Power Station will be refurbished by closing down one tunnel (two generating units) at a time. First two units will be refurbished by December 2018, the next two by December 2019 and the other two by December 2020.Refurbishment of all the 10 generating units will be completed by the year 2024. After undergoing refurbishment project is completed capacity will increase by another 310 MW.[51][52][53][54] |
Warsak Dam | Peshawar, KPK | 34°09′50″N 71°21′29″E / 34.16389°N 71.35806°E | 243 | Operational since 1960. Dam completely silted up; Power generation by Run of the river. Extension and rehabilitation is being planned.[55] The total cost of the rehabilitation project €162 million is being co-financed with the KfW (€40 million), EIB (€4.5 million), AFD (€41.5 million) and Pakistan government contributions.[56][57] |
Chashma Barrage | Chashma, Punjab | 184 | Operational since 2001. | |
Allai Khwar Hydropower Project | Mansehra, KPK | 121 | Operational since 2013. | |
New Bong Escape Hydropower Plant | Mirpur, AJK, | 84 | Operational since 2013. | |
Patrind Hydropower Plant | Muzaffarabad, Abbottabad District, Azad Kashmir | 150 | Operational since April 2017. | |
Khan Khwar Hydropower Project | Shangla District, KPK | 72 | Operational since 2012. | |
Duber Khwar hydropower project | Kohistan District, KPK | 130 | Operational since 2013. | |
Jinnah hydropower project | Jinnah Barrage, Punjab | 96 | Operational since 2013. | |
Jagran-I Dam | Neelum Valley, AJK | 34°36′1.52″N 73°45′44.20″E / 34.6004222°N 73.7622778°E | 30.4 | Operational since 2000. |
Gomal Zam Dam | South Waziristan, FATA | 17.4 | Operational since 2013. | |
Satpara Dam | Skardu | 17.3 | Operational since 2012. | |
Rasul Barrage Hydropower Project | Mandi Bahauddin, Punjab | 32°40′49″N 73°31′15″E / 32.68028°N 73.52083°E | 22 | Operational since 1952. |
Jabban Hydropower Plant (Malakand-I) | Malakand District | 22 | Operational since 1935. | |
Dargai Hydropower Plant (Malakand-II) | Malakand District, Dargai | 20 | Operational since 1953. | |
Malakand-III Hydropower Project | Dargai, Malakand District, KPK | 81 | Operational since 2008. | |
Shadiwal Hydropower Plant | Shadiwal Warriach, Punjab, UJC | 32°37′10″N 74°14′30″E / 32.61944°N 74.24167°E | 13.5 | Operational since 1961. |
Chichonki Malian Hydropower Plant | Sheikhupura, Upper Chenab Canal [58] | 31°47′39″N 74°6′54″E / 31.79417°N 74.11500°E | 13.2 | Operational since 1959. |
Nandipur Hydropower Plant | Gujranwala, Upper Chenab Canal [58] | 13.8 | Operational since 1963. | |
Naltar-I, Nalter-II Hydropower Project | Gilgit, Naltar River | 2.28 | Operational. | |
Naltar-IV Hydropower Plant | Gilgit, Naltar River | 18 | Operational since 2007. | |
Naltar-V Hydropower Project | Gilgit, Naltar River | 14.4 | Operational since 2016. | |
Kurram Garhi Hydropower Plant | Kurram Garhi, KPK, Kuchkot Canal | 4 | Operational since 1958. | |
Reshun | Chitral | 4.5 | Operational since 1991. | |
Renala Khurd Hydropower Plant | Renala Khurd, Okara District, Lower BariDoab Canal | 30°53′1″N 73°35′42″E / 30.88361°N 73.59500°E | 1.1 | Operational since 1925. |
Darawat Dam | Jamshoro District, Sindh, Nai Baran River | 0.45 | Operational since 2014. | |
Machai Dam | Mardan District, KPK, Machai Canal | 1 | Operational. | |
Ranolia Hydropower Plant | Kohistan District, KPK | 17 | Operational since 2016. | |
Pakpattan Hydropower Plant | Pakpattan, Punjab | 2.82 | Operational since 2016. | |
Machai Hydropower Plant | Mardan District, KPK | 2.6 | Operational since 2016. | |
Daral Khwar Hydropower Plant | Swat District, KPK | 36.6 | Operational since 2016. | |
PAEC Chashma Hydel Dam | Chashma, Mianwali District, Punjab | 1.2 | Operational since 2000. | |
Kathai Dam | Muzaffarabad, AJK, Hattian Bala District, Kathai Nullah | 3.2 | Operational since 1995. | |
Kundal Shahi Hydropower Project | Neelam Valley, GB | 2 | Operational since 1992. | |
Kel Htdropower Project | Muzaffarabad, AJK | 0.45 | Operational. | |
Leepa Dam | Leepa Valley, Muzaffarabad, AJK | 2 | Operational. | |
Jari Dam | Mirpur, Azad Kashmir | 1 | Operational. | |
Chitral Hydel Power Station | Lutkho River, Chitral | 1 | Operational since 1975. | |
Singul Dam | Gilgit | 1.2 | Operational. | |
Pion Dam | Gah | 1 | Operational. | |
Sermik Dam | Skardu | 1 | Operational. | |
Basho-I Dam | Skardu | 1 | Operational. | |
Tormik-I Dam | Roundu Valley, GB | 1 | Operational. | |
Haramosh Dam | Gilgit | 1 | Operational. | |
Bubind Dam | Astore | 0.64 | Operational. | |
Gilgit Dam | Gilgit | 10.63 | Operational. | |
Skardu-I Dam | Skardu | 6.96 | Operational. | |
Skardu-II, III Dams | Skardu | 1.64 | Operational. | |
Chilas-I Dam | Chilas | 5.62 | Operational. | |
Hunza Dam | Hunza Valley, GB | 5.13 | Operational. | |
Shyok Dam | Shyok Valley, GB | 4.85 | Operational. | |
Astore Dam | Astore | 3.11 | Operational. | |
Kachura-II Dam | Skardu | 3 | Operational. | |
Ghizar Dam | Ghizer District, GB | 2 | Operational. | |
Thak Dam | Chilas | 2.00 | Operational.[59] | |
Phandar Dam | Ghizer District, GB | 2 | Operational. | |
Bordas Dam | Ghanche | 2 | Operational. | |
Kharmang Dam | Kharmang Valley, GB | 1.89 | Operational. | |
Yasin Dam | Ghizer District, GB | 1.61 | Operational.[59] | |
Bunnar Chilas Dam | Diamer District, GB | 1.5 | Operational.[59] | |
Roundu Dam | Roundu Valley, GB | 1.52 | Operational.[59] | |
Kar Gah-I, II, III, IV, V, VI, VII Hydropower Project | Gilgit | 13.34 | Operational.[59] | |
Hisper-I Dam | Nager Valley | 1 | Operational.[59] | |
Naz Bar Dam | Yasin Valley | 1 | Operational.[59] | |
Jaglot-I, II Htdropower Project | Jaglot | 1.32 | Operational.[59] | |
Chalt Dam | Nagar Valley | 1 | Operational.[59] | |
Khyber-I, II Dams | Gilgit | 2 | Operational.[59] | |
Shigar Dam | Skardu | 1 | Operational.[59] | |
Shirting Dam | Skardu | 1 | Operational.[59] | |
Sher Qila Dam | Gilgit | 1.11 | Operational.[59] | |
Parishing/Louse | Astore | 1 | Operational.[59] | |
Darel-I, II Dams | Ghanche | 1.2 | Operational.[59] | |
Bunner Dam | Chilas | 1 | Operational.[59] | |
Tangir Dam | Chilas | 1 | Operational.[59] | |
Boladas-I Dam | Hunza Valley, GB | 0.64 | Operational.[59] | |
Khunjerab Dam | Gujrab River | 0.59 | Operational.[59] | |
Gol Dam | Skardu | 0.4 | Operational.[59] | |
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Das Hydropower Project | Various Locations in GB | 2 | Operational.[59] | |
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, Kachura-I, Darel Hydropower Project | Various Locations in GB | 1.5 | Operational.[59] | |
Khaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I, Thally-I, Mendi, Stak Hydropower Project | Various Locations in GB | 1.85 | Operational.[59] | |
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Mehdabad, Nomal, Pari Hydropower Project | Various Locations in GB | 1.5 | Operational.[59] | |
Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahmadabad-I, II, Chalt-I, Sosat Hydropower Project | GB | 1 | Operational.[59] | |
Jalalabad Dam | Gilgit | 1 | Operational.[59] | |
Hasanabad-I, II, III, IV, V Dams | Hunza Valley | 2 | Operational.[59] | |
Dumsum Dam | Gah | 1.5 | Operational.[59] | |
Balagond Dam | Gah | 1.5 | Operational.[59] | |
Ishkuman-I, II Dams | Ishkuman | 2.38 | Operational.[59] | |
Ashuran Dam | 1.2 | Operational.[59] | ||
Thall Dam | 0.4 | Operational.[59] | ||
Bumborat, Rashang HPP, Matta HPP, Shishi, Karora, Kalam HPP, Keyal, Kaghan, Duber, Jalkot, Gram Chashma, Damori, Keel, Pattika, Chinari, Serai, Kumrat HPPs | Various Locations in KPK | 2.2 | Operational.[59][60][61] |
Under construction
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Naltar-III Hydropower Project | Naltar, Gilgit-Baltistan | 16 | Under construction. To be operational by Nov 2017.[62] | |
Shagarthang Hydropower Project | Skardu, Gilgit-Baltistan | 26 | Under construction. To be operational by Mar 2018.[63][64] | |
Neelum–Jhelum Hydropower Plant | Muzaffarabad, Azad Kashmir | 34°23′34″N 73°43′08″E / 34.39278°N 73.71889°E | 969 | Under construction. To be operational by May 2018.[65] |
Jabori Hydropower Plant | Mansehra, KPK | 10.2 | Under construction. To be operational by May 2018 [66][67] | |
Karora Hydropower Plant | Shangla, KPK | 11.8 | Under construction. To be operational by May 2018 [66][68] | |
Tarbela Dam Extension-IV | Tarbela, KPK | 34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E | 1,410 | Under construction. To be operational by Jun 2018.[69][70] |
Golen Gol Hydropower Project | Chitral, KPK | 106 | Under construction. To be operational by Aug 2018.[71] | |
Kurram Tangi Dam | North Waziristan, FATA | 83.4 | Under construction. To be operational by Apr 2019.[72] | |
Gulpur Hydropower Project | Gulpur, Azad Kashmir | 102 | Under construction. To be operational by Oct 2019.[73] | |
Koto Hydropower Plant | Lower Dir, KPK | 40.8 | Under construction. To be operational by 2019.[74] | |
Lawi Hydropower Plant | Chitral, KPK | 69 | Under construction. To be operational by 2019.[75] | |
Harpo Hydropower Project | Skardu, Gilgit-Baltistan | 34.5 | Under construction. To be operational by 2019.[76] | |
Jagran-II Hydropower Project | Neelum, Azad Kashmir | 48 | Under construction. To be operational by Feb 2020.[77] | |
Keyal Khwar Hydropower Project | Kohistan, KPK, Indus River | 128 | Under construction. To be operational by Aug 2020.[78] | |
Gorkin-Matiltan Hydropower Project | Swat, KPK | 84 | Under construction. To be operational by 2020.[79] | |
Karot Hydropower Project | Rawalpindi, Punjab | 720 | Under construction. To be operational by 2021.[80] | |
Dasu Dam- Stage I | Dasu, KPK | 2,160 | Under construction. To be operational by 2022 [81] | |
Suki Kinari Hydropower Project | Mansehra, KPK | 870 | Under construction. To be operational by 2022.[82] | |
Kohala Hydropower Project | Muzaffarabad, Azad Kashmir | 1124 | Under construction. To be operational by 2022. | |
Taunsa Barrage Hydropower Plant | Muzaffargarh, Punjab | 120 | Under construction.[83] | |
Pakpatan Hydropower Project | Pakpatan, Punjab | 2.82 | Under construction.[84] | |
Marala Hydropower Project | Sialkot, Punjab | 7.64 | Under construction.[85] | |
Chianwali Hydropower Project | Gujranwala, Punjab | 5.38 | Under construction.[86] | |
Deg Outfall Hydropower Project | Gujranwala, Punjab | 4.04 | Under construction.[87] | |
Okara Hydropower Project | Gujranwala, Punjab | 4.16 | Under construction.[88] | |
Chashma Hydel Power Project | Mianwali, Punjab | 5.0 | Under construction.[89] | |
Naulong Dam | Jhal Magsi, Balochistan | 4.4 | Under construction.[90] | |
Nai Gaj Dam | Dadu, Sindh | 4.2 | Under construction.[91] | |
Garuk Dam | Kharan District, Balochistan | 0.3 | Under construction.[92] | |
Pelar Dam | Awaran District, Balochistan | 0.3 | Under construction.[93] | |
Proposed
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Athmuqam Dam | Athmuqam, Azad Kashmir | 350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation announced in October 2016 that it won the contract for construction.[94] | |
Turtonus-Uzghor Dam | Chitral, KPK | 58 | Ready to be constructed. China's Sinohydro Corp. Ltd. and Pakistan-based Sachal Engineering Works Private Ltd won the contract for construction. | |
Mahl Hydropower Project | Azad Kashmir | 34°55′N 73°34′E / 34.917°N 73.567°E | 590 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[90] |
Nekherdim-Paur Dam | Chitral, KPK | 80 | Ready to be constructed. CTG won contract for construction.[94] | |
Chakothi-Hattian Hydropower Project | Muzaffarabad, AJK | 500 | Ready for construction. Chinese firm won the contract for construction. | |
Hanzel Hydropower Project | Hanzel, Gilgit | 20 | Ready to be constructed. Cost estimate $63 million.[95] | |
Ghowari Hydropower Project | Gilgit-Baltistan | 30 | Ready to be constructed. Cost estimate $80 million.[96] | |
Diamer-Bhasha Dam | Chilas, Gilgit-Baltistan | 4,500 | Ready to be constructed. Cost estimate $14 billion.[97] | |
Tarbela Dam Extension-V | Tarbela, KPK | 34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E | 1,410 | Ready to be constructed. Cost estimate $796 million.[47][98] |
Kotli Hydropower Project | Kotli District, AJK | 102 | Ready to be constructed.[90] Cost estimate $170 million.[99] | |
Bara Dam | Tirah, Khyber Agency | 5.8 | Ready to be constructed.[100][101][101][102][103] | |
Munda Dam | Mohmand Agency, FATA, Swat River | 34°21′11″N 71°31′58″E / 34.35306°N 71.53278°E | 800 | Ready to be constructed.[100][101][102][103] Cost estimate $1.149 billion.[90] |
Bunji Hydropower Project | Astore District, Gilgit-Baltistan | 35°39′N 74°36′E / 35.650°N 74.600°E | 7,100 | Ready to be constructed. MOU signed wwith China’s National Energy Administration.[104] Cost estimate $6.8 billion.[90] |
Patan hydropower Project | Patan Village, Indus River | 2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[101][102][103][91] Cost estimate $6 billion.[105] | |
Thakot Hydropower Project | Battagram District, KPK | 34°45′N 72°55′E / 34.750°N 72.917°E | 4,000 | Ready for construction. MOU signed with China’s National Energy Administration[101][102][103] Cost estimate $6 billion.[105] |
Sharmai Hydropower Project | Upper Dir, KPK | 150 | Ready for construction. Pakhtunkhwa Energy Development Organization (PEDO) and a consortium of Sinohydro and Lahore-based Sapphire Electric Co. signed agreement for construction. Cost estimate $698.3 million. [66] | |
Phandar Hydropower Project | Ghizer District, Gilgit-Baltistan | 81 | Detailed engineering design or tender of documents under process.[100][103] Cost estimate $128 million .[105] | |
Basho Hydropower Station | Skardu, GB, Indus River | 28 | Detailed engineering design or tender of documents under process.[100][101] Cost estimate $40 million.[105] | |
Tank Zam Dam | Hinis Tangi, KPK, Tank Zam River | 25.5 | Feasibility studies completed.[101] Cost estimate $234 million.[90] | |
Kaigah Hydropower Project | Kaigah, KPK, Indus River | 548 | Feasibility studies completed.[106] | |
Hingol Dam | Lasbela District, Hingol River, Balochistan | 3.5 | Feasibility studies completed. Cost estimate $311 million.[90] | |
Lower Spat Gah hydropower project | Kohistan District, KPK, Indus River | 665 | Feasibility studies completed.[101][102][103] Cost estimate $697 million.[90] | |
Akhori Dam | Akhori, Punjab, Haro River | 600 | Feasibility studies ongoing. Cost estimate $1.6 billion.[105] | |
Middle Palas hydropower project | Kohistan, KPK | 373 | Feasibility studies ongoing.[101][102][103] Cost estimate $763 million.[90] | |
Upper Palas hydropower project | Kohistan, KPK | 160 | Feasibility studies ongoing.[101][102][103] Cost estimate $763 million.[90] | |
Madian Hydropower Project | Swat, KPK, Swat River | 157 | Feasibility studies ongoing.[106] | |
Shushai-Zhendoli Hydropower Project | Chitral, KPK | 144 | Financing is being arranged for these projects by selling shares in the existing projects.[66] | |
Shogosin Hydropower Project | Chitral, KPK | 132 | Financing is being arranged for these projects by selling shares in the existing projects.[66] | |
Latambar Dam | Karak District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Mairoobi Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Jaroba Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Naran Dam | Mansehra District, Khyber Pukhtunkhwa | 188 | EOI invited.[107] | |
Gorband Hydropower Project | Shangla District, KPK | 14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107][108] | |
Nand Bahar Dam | Battagram District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Mojigram Shagoor Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Astar Rabooni Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Arkari Gol Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Shringal Dam | Upper Dir District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Patrak Barikot Dam | Swat District, Khyber Pukhtunkhwa | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Segokatch Dam | Chitral District, KPK | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[107] | |
Taunsa Hydropower Project | 135 | IPP, RFP has been accepted.[109] | ||
Naran Hydropower Project | 188 | IPP, RFP has been accepted.[110] | ||
Shigo Kas Hydropower Project | 102 | EOI invited.[111] | ||
Arkari Gol Hydropower Project | 99 | EOI invited.[112] | ||
Bata Kundi Hydropower Project | 96 | EOI invited.[113] | ||
Ghorband Khwar Hydropower Project | 21 | EOI Iinvited.[114] | ||
Nandihar Khwar Hydropower Project | 12 | EOI invited.[115] | ||
Tangir Hydropower Project | Tangir Valley, Chilas, GB | 15 | Proposed. Cost estimate $30.967 million.[90] | |
Winder Dam | Lasbela District, Winder River, Balochistan | 0.3 | Proposed. Cost estimate $148 million.[90] | |
Daraban Zam Dam | Dera Ismail Khan, KPK, Khora River | 0.75 | Proposed. Cost estimate $69 million.[90] | |
Ghabir Dam | Ghabir River | 0.15 | Proposed. Cost estimate $121 million.[90] | |
Papin Dam | Rawalpindi District, Wadala Kas | 0.3 | Proposed. Cost estimate $101 million.[90] | |
Rajhdani Dam | Kotli District, AJK Poonch River | 132 | EOI invited.[94] | |
Azad Pattan Hydropower Project | Azad Pattan, Sudhnoti, Jehlum River, Azad Kashmir | 650 | Proposed. LoS issued. | |
Kalam Asrit | Kalam, Khyber Pakhtunkwa | 197 | LoS issued. | |
Gabral Kalam | Kalam, Khyber Pakhtunkwa | 101 | LoS issued. | |
Bhadi Dhoba Hydropower Project | Haveli District | 1 | Proposed. | |
Galeter Hydropower Project | Kotli District | 1 | Proposed.[116] | |
Saridoa Cross Hydropower Project | Bhimber District | 1.7 | Proposed. | |
Chamfall Hydropower Project | Hattian District | 6.4 | Proposed.[116] | |
Guddu Hydropower Station | Kashmore, Sindh | 33 | Proposed. | |
Harighel Hydropower Project | 53 | Proposed. | ||
Sehra Hydropower Project | Azad Kashmir, Poonch River | 130 | Proposed. | |
Nagdar Hydropower Project | Neelum, AJK, Jagran River | 25 | Proposed.[117] | |
Duwarian Hydropower Project | Hattian Bala, AJK, Jagran River | 29 | Proposed.[118] | |
Asrit-Kedam Hydropower Project | Kalam, KPK, Swat River | 215 | Proposed. | |
Karang Hydropower Project | 458 | Proposed. | ||
Shogo-Sin Hydel Dam | 132 | Proposed. | ||
Balakot Hydropower Project | Mansehra, Khyber Pakhtunkhwa | 300 | Proposed.[119] | |
Shushgai Zhendoll | 144 | Proposed. | ||
Yogo, Pakistan | 500 | Proposed. | ||
Thor Hydropower Project | 3.6 | Proposed.[90] | ||
Yulbo Hydropower Project | 3000 | Proposed.[105] | ||
Shyok Hydropower Project | 520 | Proposed.[105] | ||
Tungus Hydropower Project | 2200 | Proposed.[105] | ||
Skardu Dam | Skardu | 1600 | Proposed.[105] | |
Dudhnial Hydropower Project | 960 | Proposed.[105] | ||
Kundal Shahi Hydropower Project | 960 | Proposed.[105] | ||
Trappi Hydropower Project | 32 | Proposed.[105] | ||
Nandihar Hydropower Project | Battagram, Khyber Pukhtunkhwa | 10 | Proposed.[120] | |
Mujigaram Shagore Hydropower Project | Chitral, Khyber Pukhtunkhwa | 51 | Proposed.[121] | |
Istaro Booni Hydropower Project | Chitral, Khyber Pukhtunkhwa | 52 | Proposed.[122] | |
Arkari Gol Hydropower Project | Chitral, Khyber Pukhtunkhwa | 79 | Proposed.[123] | |
Nuclear
In service
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
(KANUPP-1) | Karachi, Sindh | 24°50′41″N 66°47′20″E / 24.84472°N 66.78889°E | 85 | Operational since 1972.[124] |
(CHASNUPP-1) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 320 | Operational since Jun 2000. |
(CHASNUPP-2) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 320 | Operational since Mar 2011. |
(CHASNUPP-3) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 340 | Operational since Oct 2016. |
Under construction or proposed
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
(CHASNUPP-4) | Mianwali, Punjab | 32°23′20″N 71°27′45.5″E / 32.38889°N 71.462639°E | 340 | Under construction. To be operational by Oct 2017.[125] |
(KANUPP-2) | Karachi, Sindh | 1100 | Under construction. To be operational by Jun 2020.[126] | |
(KANUPP-3) | Karachi, Sindh | 1100 | Under construction. To be operational by Apr 2021.[127] | |
(CHASNUPP-5) | Mianwali, Punjab | 1000 | Under construction. [128] | |
Coastal Nuclear Power Project | Hub, Balochistan | 2200 | Proposed.[124] | |
Renewables
Wind Power
According to a USAID report, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which only the Sindh corridor can produce 40,000 megawatts.
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Jhimpir Wind Power Plant | Jhimpir, Sindh | 56.4 | Operational since 2009. | |
Jhimpir Wind Energy Project | Jhimpir, Sindh | 49.6 | Operational since Dec 2012. | |
Three Gorges First Wind Farm Pakistan Ltd-I | Jhimpir, Sindh | 49.5 | Operational since Dec 2014. | |
Foundation Wind Energy–I & II Pvt Ltd | Gharo, Sindh | 100 | Operational since Jan 2015. | |
Sapphire Wind Power Pvt Ltd | Gharo, Sindh | 52.8 | Operational since Nov 2015. | |
Yunus Energy Ltd | Jhimpir, Sindh | 50 | Operational since Sep 2016. | |
Metro Wind Power Co Ltd | Jhimpir, Sindh | 50 | Operational since Sep 2016. | |
Tenaga Generai Ltd | Gharo, Sindh | 49.5 | Operational since Oct 2016. | |
Gul Ahmed Wind Power Ltd | Jhimpir, Sindh | 50 | Operational since Oct 2016. | |
Master Wind Energy Ltd | Jhimpir, Sindh | 52.8 | Operational since Oct 2016. | |
FFC Energy Ltd | Jhimpir, Sindh | 50 | Operational since Oct 2016. | |
Zorlu Enerji Pakistan | Jhimpir, Sindh | 56.4 | Operational since Oct 2016. | |
Tapal Wind Energy Ltd | Jhimpir, Sindh | 30 | Operational since Oct 2016. | |
HydroChina Dawood Power Ltd | Gharo, Sindh | 49.5 | Operational since Apr 2017. | |
Sachal Engineering Works Pvt Ltd | Jhimpir, Sindh | 49.5 | Operational since Jun 2017.[129] | |
United Energy Ltd | Jhimpir, Sindh | 100 | Under construction. To be operational by Jun 2017.[130] | |
Thatta Power Plant | Jhimpir, Sindh | 50 | Under construction. To be operational by Oct 2017.[131] | |
Harappa Solar Pvt Ltd | Jhimpir, Sindh | 18 | Under construction. To be operational by Dec 2017.[132] | |
AJ Power Pvt Ltd | Jhimpir, Sindh | 12 | Under construction. To be operational by Dec 2017.[133] | |
Hawa Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by Feb 2018.[130] | |
Jhampir Wind Power Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by Feb 2018.[130] | |
Access Electric Pvt Ltd | Jhimpir, Sindh | 21.5 | Under construction. To be operational by Mar 2018.[134] | |
BukhshSolar Pvt Ltd | Jhimpir, Sindh | 10 | Under construction. To be operational by Mar 2018.[135] | |
Safe Solar Power Pvt Ltd | Jhimpir, Sindh | 10 | Under construction. To be operational by Mar 2018.[136] | |
Blue Star Hydel Pvt Ltd | Jhimpir, Sindh | 1 | Under construction. To be operational by Mar 2018.[137] | |
Tricon Boston Corporation | Jhimpir, Sindh | 150 | Under construction. To be operational by Mar 2018.[130][138] | |
Three Gorges Second Wind Farm Pakistan Ltd-II | Jhimpir, Sindh | 50 | Under construction. To be operational by Sep 2018.[139] | |
Three Gorges Second Wind Farm Pakistan Ltd-III | Jhimpir, Sindh | 50 | Under construction. To be operational by Sep 2018.[140] | |
Hartford Alternate Energy | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Western Energy Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Zephyr Power Ltd | Gharo, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Shaheen Foundation | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Norinco International Thatta Power Pvt. Ltd. | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Trans Atlantic Energy Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Act 2 Wind Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Artistic Wind Power Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Harvey Wind Power Project | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Zulikha Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Gul Ahmed Electric Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Metro Wind Power Ltd | Jhimpir, Sindh | 60 | Under construction. To be operational by 2018.[130] | |
Din Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Din Energy Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by 2018.[130] | |
Burj Wind Energy Pvt Ltd | Jhimpir, Sindh | 14 | Under construction. To be operational by 2018.[130] | |
Iran-Pak Wind Power Pvt Ltd | Jhimpir, Sindh | 50 | Under construction. To be operational by Jul 2019.[141] | |
Titan Energy Pakistan (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[130] | |
Dawood Power Pvt Ltd | Gharo, Sindh | 50 | Under construction.[130] | |
Bhambore Wind Project | Gharo, Sindh | 50 | Under construction.[130] | |
MBM Engineering Company | Karachi, Sindh | 1 | Under construction.[142] | |
Gharo Wind Power Plant | Gharo, Sindh | 50 | Under construction. | |
Finerji (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[130] | |
Trident Energy (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[130] | |
Wind Eagle (Pvt) Ltd | Jhimpir, Sindh | 50 | Under construction.[143] | |
Quaid-e-Azam Wind Park | Punjab | 1000 | Under construction.[144] | |
AM Pak Energy | Punjab | 50 | LOI issued.[145] | |
Sany Group | Punjab | 1000 | MOU issued.[146] | |
Solar Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Pakistan Parliament | Islamabad, Pakistan | 1[147] | Operational since Feb 2016.[148][149] | |
Quaid-e-Azam Solar Park | Bahawalpur, Punjab | 400 | Operational since Dec 2016.[150] | |
Fatima Jinnah Park | Islamabad, Pakistan | 1 | Operational since Dec 2016.[151] | |
POF Sanjwal Factory | Islamabad, Pakistan | 5 | Operational since Mar 2017.[152] | |
Bukhsh Solar Pvt Ltd | Lodhran, Punjab | 10 | Under construction. To be operational by Mar 2018.[153] | |
Access Electric Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[154] | |
Safe Solar Power Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[155] | |
Acess Solar Pvt Ltd | Punjab | 11.5 | Under construction. To be operational by Mar 2018.[156] | |
Blue Star Hydel Pvt Ltd | Punjab | 1 | Under construction. To be operational by Mar 2018.[157] | |
Safe Solar Power Pvt Ltd | Punjab | 10 | Under construction. To be operational by Mar 2018.[158] | |
Harappa Solar Pvt Ltd | Sahiwal, Punjab | 18 | Under construction. To be operational by Mar 2018.[159] | |
AJ Power Pvt Ltd | Sahiwal, Punjab | 12 | Under construction. To be operational by Mar 2018.[160] | |
Oursons Pakistan Ltd | Gharo, Sindh | 50 | Under construction. To be operational by Jun 2018.[161][162] | |
Integrated Power Solution | Punjab | 50 | LOI isuued. To be operational by 2019.[163] | |
Jafri and Associates | Punjab | 50 | LOI isuued. To be operational by 2019.[164] | |
Solar Blue Pvt Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[165] | |
Forshine | Punjab | 50 | LOI isuued. To be operational by 2019.[166] | |
ACT Solar (Pvt) Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[167] | |
Siddiqsons Energy Karachi | Punjab | 50 | LOI isuued. To be operational by 2019.[168] | |
ET Solar Pvt Ltd | Punjab | 50 | LOI isuued. To be operational by 2019.[169] | |
R.E Solar-I Pvt Ltd | Punjab | 20 | LOI isuued. To be operational by 2019.[170] | |
R.E Solar-II Pvt Ltd | Punjab | 20 | LOI isuued. To be operational by 2019.[171] | |
Janpur Energy Limited | Punjab | 12 | LOI isuued. To be operational by 2019.[172] | |
Asia Petroleum Ltd | Sindh | 30 | LOI isuued. To be operational by 2019.[173] | |
ET Solar Pvt Ltd | Sindh | 25 | LOI isuued. To be operational by 2019.[174] | |
Crystal Energy Pvt. Ltd | Sindh | 2 | LOI isuued. To be operational by 2019.[175] | |
First Solar | Punjab | 2 | LOI issued. To be operational by 2019.[176] | |
Roshan Power Solar | Kasur, Punjab | 10 | LOI issued.[145] | |
Conergy Solar Project | Bahawalpur, Punjab | 50 | LOI issued.[177] | |
DACC LLC Solar | Sindh | 50 | LOI issued.[145][178] | |
Wah Industries Limited Solar | Taxila, Punjab | 1 | LOI issued.[145] | |
Solar Energy Pakistan Ltd | Thatta, Sindh | 35 | LOI issued.[145] | |
CWE Solar | Bahawalpur, Punjab | 50 | LOI issued.[145] | |
Enertech Holding Company, Kuwait Investment Authority | Quetta, Balochistan | 500 | LOI issued.[179][180] | |
Helios Power Pvt Ltd | Sindh | 50 | LOI issued.[181] | |
Meridian Energy Pvt Ltd | Sindh | 50 | LOI issued.[182] | |
HNDS Energy Pvt Ltd | Sindh | 50 | LOI issued.[183] | |
Canadian Commercial Corporation | Khyber Pakhtunkhwa | 1000 | MOU issued.[184] | |
Baggase Power
Bagasse is the crushed residue of sugarcane. It is an excellent raw material for power generation. Pakistan sugar industry is one of the biggest industry in the world and comprises 81 sugar mills with an annual capacity of about six million tons sugar. The industry crushes about 30 to 40 million tons of sugarcane that yields about 12 million tons of bagasse as an industrial waste that has a potential of generating 3000 MW electricity.[185] According to a recent report by National Electric Power Regulatory Authority (NEPRA), about 16 sugar mills are supplying nearly 120 MW surplus power to electric distribution companies for national grid while many others are producing just enough power for their use only.[186][187]
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
JDW Sugar Mills (Unit- II) | Jhimpir, Sindh | 26.35 | Operational.[188] | |
JDW Sugar Mills (Unit- III) | Jhimpir, Sindh | 26.35 | Operational.[188] | |
RYK Mills Ltd | Rahim Yar Khan, Punjab | 30 | Operational.[188] | |
Chiniot Power Ltd | Chiniot, Punjab | 62.4 | Operational.[188] | |
Mirpurkhas Sugar Power Plant | Mirpurkhas, Sindh | 34.1 | Operational. | |
Sanghar SPP | 32 | Operational. | ||
Shahmurad SPP | 26.5 | Operational. | ||
Mehran SPP | 22.9 | Operational. | ||
JDW Sugar Mill Power plant I | Jhimpir, Sindh | 20.1 | Operational. | |
Kamaila SPP | 20.1 | Operational. | ||
Fatima SPP | 20.1 | Operational. | ||
Khosi SPP | 20.1 | Operational. | ||
Madina SPP | 20.1 | Operational. | ||
Pahrianwall SPP | 20.1 | Operational. | ||
Tandlianwala SPP | 20.1 | Operational. | ||
Sheikhoo SPP | 20.1 | Operational. | ||
Bahawalnagar SPP | 18.5 | Operational. | ||
Bachani Sugar Mill Power Plant | 16.8 | Operational. | ||
Husein SPP | 13.4 | Operational. | ||
Faran SPP | 13.4 | Operational. | ||
Phalia SPP | 13.4 | Operational. | ||
Premier SPP | 13.4 | Operational. | ||
Chashma SPP | 13.4 | Operational. | ||
Punjab SPP | 13.4 | Operational. | ||
Kohinoor SPP | 10.1 | Operational. | ||
Bawani Sugar Mill Power Plant | 10.1 | Operational. | ||
Matiari SPP | 6.7 | Operational. | ||
Layyah Sugar Mills Ltd | Layyah, Punjab | 41 | Under construction. To be operational by Jun 2017.[188] | |
Almoiz Industries Ltd | Mianwali, Punjab | 36 | Under construction. To be operational by Jun 2017.[188] | |
Hamza Sugar Mill Ltd | Rahim Yar Khan, Punjab | 15 | Under construction. To be operational by Dec 2017.[188] | |
Shahtaj Sugar Mills Ltd | Mandi Bahauddin, Punjab | 32 | Under construction. To be operational by Dec 2017.[188] | |
Alliance Sugar Mills Ltd | Ghotki, Sindh | 19 | Under construction. To be operational by Dec 2017.[188] | |
Safina Sugar Mills | Chiniot, Punjab | 20 | Under construction. To be operational by Dec 2017.[188] | |
Eatihad Power Generation | Rahim Yar Khan, Punjab | 67 | Under construction. To be operational by Dec 2017.[188] | |
Sheikhoo Power Ltd | Muzaffargarh, Punjab | 30 | Under construction. To be operational by Sep 2018.[189] | |
Mehran Sugar Mill Ltd | Tando Allahyar, Sindh | 26.5 | Under construction. To be operational by Dec 2018.[190] | |
RYK Energy | Rahim Yar Khan, Punjab | 36 | Under construction. To be operational by 2018.[188] | |
Indus Energy Ltd | Rajanpur, Sindh | 30 | Under construction. To be operational by 2018.[188] | |
Hamza Sugar Mills Unit-II | Rahim Yar Khan, Punjab | 30 | Under construction. To be operational by 2018.[188] | |
Chanar Energy Ltd | Faisalabad, Punjab | 22 | Under construction. To be operational by 2018.[188] | |
Indus Energy Ltd | Punjab | 31 | Under construction. To be operational by 2018.[191] | |
Mirpurkhas Energy Ltd | Sindh | 26 | Under construction. To be operational by 2018.[192] | |
Faran Energy Ltd | Sindh | 26 | Under construction. To be operational by 2018.[193] | |
Biomass Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
University of Agriculture-Biomass Thermal Power | Faisalabad, Punjab | 0.1 | Operational.[194] | |
Biomass Thermal Power Project | Faisalabad, Punjab | 20 | Under construction.[195] | |
Waste Heat Recovery Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Lucky Cement Ltd | Karachi, Sindh | 20 | Operational.[196] | |
Lucky Cement Ltd | Pezu, KPK | 30 | Operational.[197] | |
Imported Power
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Iran | Gwadar, Balochistan | 105 | Operational.[198] | |
Kyrgyzstan/Tajikistan | 1000 | Under construction. | ||
See also
- Electricity in Pakistan
- Energy policy of Pakistan
- List of power stations in Asia
- List of largest power stations in the world
- Iran–Pakistan–India gas pipeline
- Electricity sector in Pakistan
References
- ↑ http://tribune.com.pk/story/208495/dark-days-ahead-electricity-woes-to-worsen-in-future/
- ↑ https://tribune.com.pk/story/1419429/installed-capacity-increases-power-production-falls/
- ↑ http://tribune.com.pk/story/655573/pakistans-energy-security/
- 1 2 http://www.dawn.com/news/1172656
- ↑ "Hub River Power Project Oil Plant". Global Energy Observatory. Retrieved 23 March 2014.
- 1 2 3 4 5 6 "Oil- and Gas-Fired Plants in Pakistan". Gallery. Power Plants Around The World. 10 July 2013. Retrieved 20 March 2014.
- ↑ http://www.brecorder.com/brief-recordings/0/1234108/
- ↑ http://www.dawn.com/news/905704/saudi-group-to-expand-hubco-plant-s-capacity
- ↑ http://www.hubpower.com/our-business/hub-power-station/#ES/
- ↑ "Jamshoro". Global Energy Observatory. Retrieved 20 March 2014.
- ↑ https://www.energyglobal.com/downstream/refining/03112016/man-diesel-turbo-completes-project-in-pakistan/
- ↑ http://globalenergyobservatory.org/form.php?pid=3425
- ↑ http://www.dawn.com/news/1102238/nawaz-launches-uch-ii-power-project
- ↑ http://www.dawn.com/news/1109742/pm-inaugurates-nandipur-power-project
- ↑ http://en.dailypakistan.com.pk/business/nandipur-power-project-soon-to-be-fully-operational-456/
- 1 2 3 "CCGT Plants in Pakistan". Gallery. Power Plants Around The World. 9 February 2014. Retrieved 20 March 2014.
- ↑ "Habibullah Coastal Power CCGT". Global Energy Observatory. Retrieved 24 March 2014.
- ↑ http://globalenergyobservatory.org/list.php?db=PowerPlants&type=Gas
- ↑ "Rousch Power Project CCGT". Global Energy Observatory. Retrieved 23 March 2014.
- ↑ "Engro Powergen CCGT Power Plant". Global Energy Observatory. Retrieved 24 March 2014.
- ↑ http://www.grangepower.co.uk/our-profile.php
- ↑ http://tribune.com.pk/story/894450/energetic-thar-coal-plant-begins-power-generation/
- ↑ http://www.ppib.gov.pk/N_oilgas_with_loi.htm
- ↑ http://dailytimes.com.pk/punjab/11-May-17/cabinet-okays-setting-up-of-1200mw-gas-power-plant
- ↑ http://nation.com.pk/business/11-Jul-2017/k-e-unveils-plan-for-900mw-power-project
- ↑ http://www.dawn.com/news/1281793
- ↑ http://www.brecorder.com/2017/02/06/336427
- ↑ http://www.dawn.com/news/1311066
- ↑ https://tribune.com.pk/story/1419108/nawaz-inaugurates-coal-fired-power-project-sahiwal/
- ↑ https://www.dawn.com/news/1318673/moving-on-with-new-projects
- ↑ http://www.pakistantoday.com.pk/2016/03/07/business/port-qasim-coal-fired-power-project-cpecs-first-project-witnesses-emphatic-progress-on-ground/
- ↑ https://tribune.com.pk/story/1334767/coal-thars-black-gold/
- ↑ http://www.dawn.com/news/1188606/setting-up-of-1400mw-coal-based-power-project-in-thar-approved
- ↑ http://dailytimes.com.pk/business/19-Oct-16/hubco-likely-to-cut-its-2x660mw-coal-project-by-half
- ↑ http://tribune.com.pk/story/949102/coal-based-power-letter-of-support-issued-for-350mw-project/
- ↑ https://www.dawn.com/news/1296567
- ↑ https://tribune.com.pk/story/1381972/chinese-firm-awarded-thar-power-projecthttps://www.thenews.com.pk/print/205954-SECMC-signs-coal-deals-with-TEL-ThalNova/
- ↑ https://www.thenews.com.pk/print/205954-SECMC-signs-coal-deals-with-TEL-ThalNova
- ↑ http://www.dawn.com/news/1092990/ke-to-set-up-coal-power-plant
- ↑ http://nation.com.pk/national/11-Jul-2015/pak-china-working-on-120-mw-power-plant-in-muzaffargarh
- 1 2 https://www.dawn.com/news/1336376/chinese-firm-gets-loi-for-gwadar-coal-power-project
- ↑ http://www.dawn.com/news/1096488/idb-approves-220m-for-jamshoro-power-project
- ↑ http://www.proactiveinvestors.co.uk/companies/news/127237/oracle-coalfields-told-coal-price-for-thar-power-station-127237.html
- ↑ https://www.law360.com/articles/580973/oracle-coalfields-inks-1-3b-deal-for-pakistan-coal-project
- ↑ http://www.dawn.com/news/1167908/another-51m-to-expedite-tarbela-project-completion
- ↑ http://tribune.com.pk/story/965932/tarbela-fifth-extension-project-gets-cdwps-nod/
- 1 2 http://www.dawn.com/news/1167908
- ↑ http://tribune.com.pk/story/671783/wapda-awards-312-million-contract-for-tarbela-4th-extension-hydropower-project/
- ↑ http://tribune.com.pk/story/676559/tackling-energy-crisis-nawaz-inaugurates-tarbela-iv-project/
- ↑ "Hydroelectric Power Plants in Pakistan". Gallery. Power Plants Around The World. 12 October 2013. Retrieved 20 March 2014.
- ↑ http://tribune.com.pk/story/934253/mangla-power-project-to-increase-generation/
- ↑ http://www.wapda.gov.pk/pdf/ManglaR1010.pdf
- ↑ http://www.dawn.com/news/1224280/fresh-bids-for-six-mangla-turbines-received-saving-of-rs4bn-expected
- ↑ http://www.brecorder.com/pakistan/industries-a-sectors/333422-mangla-power-generation-capacity-to-be-enhanced-to-1310-mw.html
- ↑ http://www.pepco.gov.pk/warsak.php
- ↑ http://www.dawn.com/news/1207464/germany-to-lend-40m-euros-for-warsak-power-station
- ↑ http://www.dawn.com/news/1208766/france-announces-rs505bn-credit-for-warsak-project
- 1 2 http://pecongress.org.pk/images/upload/books/12-Mazhar%20Hussain.pdf
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 http://www.ppib.gov.pk/HYDRO.pdf
- ↑ http://www.brecorder.com/fuel-a-energy/193:pakistan/1225445:two-micro-hydro-power-plants-inaugurated-khyber-pakhtunkhwa-government-seeks-to-restart-closed-projects-says-imran/?date=2013-08-27
- ↑ http://www.dawn.com/news/597545/naltar-hydropower-projects-delayed-2
- ↑ http://pamirtimes.net/2011/11/12/shagarthang-hydropower-project-approved/
- ↑ http://resultdon.blogspot.com/2011/11/ecnec-friday-approved-26-mw-shagarthang.html
- ↑ https://tribune.com.pk/story/1358324/wapda-add-2485mw-cheap-electricity-mid-2018/
- 1 2 3 4 5 https://kpkprogress.wordpress.com/tag/ranolia-hpp/
- ↑ http://www.dawn.com/news/1261589/three-power-projects-to-start-generation-by-year-end-in-kp
- ↑ http://www.dawn.com/news/1261589/three-power-projects-to-start-generation-by-year-end-in-kp
- ↑ http://www.dawn.com/news/1167908/another-51m-to-expedite-tarbela-project-completion
- ↑ http://www.pakistantoday.com.pk/2016/10/24/business/tarbela-4th-extension-hydropower-project-faces-further-delay/
- ↑ https://tribune.com.pk/story/1358324/wapda-add-2485mw-cheap-electricity-mid-2018/
- ↑ http://pakobserver.net/kurram-tangi-dam-launch-widely-welcomed/
- ↑ https://www.thenews.com.pk/print/114578-Chinese-firm-gets-LoS-for-1320MW-project-at-Hub
- ↑ http://www.dawn.com/news/1314986/work-on-koto-power-projects-tunnel-completed
- ↑ http://www.dawn.com/news/1314986/work-on-koto-power-projects-tunnel-completed
- ↑ http://www.hydroworld.com/articles/2014/01/germany-s-kfw-agrees-to-help-finance-pakistan-s-35-mw-harpo-hydroelectric-project.html
- ↑ http://www.fwo.com.pk/projects/ongoing-projects/dams-watersupply/493-48-mw-jagran-ii-hpp
- ↑ http://www.wapda.gov.pk/index.php/projects/hydro-power/on-going/keyal-khwar-hydropower-project
- ↑ http://www.dawn.com/news/1261589/three-power-projects-to-start-generation-by-year-end-in-kp
- ↑ http://www.conventuslaw.com/report/shearman-sterling-advises-financiers-on-usd169bn/
- ↑ https://www.dawn.com/news/1319342/chinese-firm-awarded-dasu-dam-contracts
- ↑ http://tribune.com.pk/story/684388/coal-based-ventures-chinese-firm-eyes-up-to-four-plants-at-gadani-power-park/
- ↑ http://tribune.com.pk/story/155524/hydro-power-electricity-project-on-taunsa-barrage/
- ↑ https://tribune.com.pk/story/391473/power-crisis-punjab-earmarks-rs10b-for-energy-projects/
- ↑ https://tribune.com.pk/story/391473/power-crisis-punjab-earmarks-rs10b-for-energy-projects/
- ↑ https://tribune.com.pk/story/391473/power-crisis-punjab-earmarks-rs10b-for-energy-projects/
- ↑ https://tribune.com.pk/story/391473/power-crisis-punjab-earmarks-rs10b-for-energy-projects/
- ↑ https://tribune.com.pk/story/391473/power-crisis-punjab-earmarks-rs10b-for-energy-projects/
- ↑ http://defence.pk/threads/infrastructure-development-in-pakistan.28647/page-387
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 http://www.wapda.gov.pk/pdf/BrochureFODPMarch2011.pdf
- 1 2 http://www.nation.com.pk/business/02-Dec-2013/32-701mw-power-projects-to-be-completed-in-7-years
- ↑ http://www.wapda.gov.pk/index.php/projects/hydro-power/on-going/garuk-dam-project
- ↑ http://www.wapda.gov.pk/index.php/projects/hydro-power/on-going/pelar-dam-project
- 1 2 3 http://tribune.com.pk/story/679362/power-board-approves-projects-of-2630mw-capacity/
- ↑ http://www.dawn.com/news/1210324/ecnec-approves-rs102bn-projects
- ↑ http://pakobserver.net/cdwp-approves-rs130b-development-projects/
- ↑ http://tribune.com.pk/story/628163/new-beginnings-progress-made-on-diamer-bhasha-project/
- ↑ http://tribune.com.pk/story/965932/tarbela-fifth-extension-project-gets-cdwps-nod/
- ↑ http://tribune.com.pk/story/679046/power-sector-govt-opens-bids-for-kotli-hydropower-project/
- 1 2 3 4 http://www.nation.com.pk/pakistan-news-newspaper-daily-english-online/Business/10-Mar-2010/32-dams-to-be-constructed
- 1 2 3 4 5 6 7 8 9 10 "Archived copy". Archived from the original on 2014-07-22. Retrieved 2014-08-27.
- 1 2 3 4 5 6 7 http://www.wapda.gov.pk/htmls/future-index.html
- 1 2 3 4 5 6 7 8 http://www.pakmission-uk.gov.pk/commsection/london/hydro_potential_may09.pdf
- ↑ http://nation.com.pk/business/02-Nov-2016/experts-express-satisfaction-on-njhp-progress
- 1 2 3 4 5 6 7 8 9 10 11 12 "Archived copy" (PDF). Archived from the original (PDF) on 2012-05-11. Retrieved 2014-03-24.
- 1 2 http://www.ppib.gov.pk/N_upcoming_hydel.htm
- 1 2 3 4 5 6 7 8 9 10 11 12 http://www.samaa.tv/pakistan/2015/06/kp-govt-to-construct-three-small-dams-in-karak-nowshera/
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- ↑ http://tribune.com.pk/story/1213603/hydroelectric-power-investor-quotes-lowest-tariff-will-win-project-bid/
- 1 2 http://ppinewsagency.com/116430/ajkcdc-approves-39-development-projects/
- ↑ http://www.dawn.com/news/1236545/ajk-wapda-to-sign-neelum-power-accord
- ↑ http://www.dawn.com/news/1236545/ajk-wapda-to-sign-neelum-power-accord
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- ↑ https://kpkprogress.wordpress.com/category/power-sector/
- 1 2 http://www.world-nuclear.org/info/Country-Profiles/Countries-O-S/Pakistan/
- ↑ http://pakobserver.net/chashma-nuclear-power-plant-unit-3-operational/
- ↑ https://www.thenews.com.pk/print/207350-PAEC-seeks-Rs885-per-unit-for-40-years
- ↑ https://www.thenews.com.pk/print/207350-PAEC-seeks-Rs885-per-unit-for-40-years
- ↑ https://www.pakistantoday.com.pk/2017/08/02/paec-to-generate-8800mw-electricity-by-2030/
- ↑ https://tribune.com.pk/story/1443537/first-pakistan-owned-wind-power-project-starts-operation/
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 http://www.aedb.org/currstatus.htm
- ↑ https://www.thenews.com.pk/print/143202-Irans-energy-firm-intends-to-set-up-wind-power-project
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ https://tribune.com.pk/story/1405212/aedb-approves-solar-projects-add-556-52mw-national-grid/
- ↑ http://renews.biz/104732/adb-boosts-pakistan-wind/
- ↑ http://tribune.com.pk/story/1087394/green-light-nepra-accepts-request-for-wind-power-production/
- ↑ http://tribune.com.pk/story/1087394/green-light-nepra-accepts-request-for-wind-power-production/
- ↑ https://tribune.com.pk/story/1449649/iranian-firm-gets-go-ahead-50mw-wind-project-sindh/
- ↑ http://www.MBM-ENGG.COM
- ↑ "Archived copy". Archived from the original on 2014-03-24. Retrieved 2014-03-24.
- ↑ http://www.dailytimes.com.pk/business/04-Feb-2016/punjab-on-track-to-host-pakistan-s-largest-wind-farm
- 1 2 3 4 5 6 "China Renewable Deals". http://www.dawn.com/wps/wcm/connect/dawn-content-library/dawn/news/home/ DAWN Media Group. Retrieved 2010-12-19. External link in
|publisher=
(help) - ↑ https://tribune.com.pk/story/1479163/chinese-firm-invest-1-5b-developing-wind-farms-punjab/
- ↑ http://www.na.gov.pk/uploads/1429522953_299.pdf
- ↑ http://www.energymatters.com.au/renewable-news/pakistan-parliament-solar-em4786/
- ↑ http://www.dawn.com/news/1239167/parliament-shifts-to-solar-energy
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://www.dawn.com/news/1312286/faced-with-blackouts-islamabads-f-9-park-goes-solar
- ↑ http://pakobserver.net/tanveer-opens-5-04mw-solar-power-plant-at-pof-sanjwal/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://www.dawn.com/news/1316126/k-electric-inks-50mw-solar-power-purchase-agreement
- ↑ https://www.thenews.com.pk/print/171610-Investors-seek-licences-to-set-up-200MW-solar-plants
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://pakobserver.net/national-grid-additional-556-52mw-solar-energy-2018/
- ↑ http://www.pv-tech.org/news/largest_pv_project_in_pakistan_to_be_built_by_conergy
- ↑ "Conergy onboard for largest solar project". http://tribune.com.pk/ Express Tribune. External link in
|publisher=
(help) - ↑ http://www.radio.gov.pk/01-Nov-2016/kuwait-has-shown-keen-interest-to-set-up-ten-50-megawatt-power-plants-in-balochistan
- ↑ http://www.brecorder.com/pakistan/general-news/305540-balochistan-govt-kuwait-firm-inks-mou.html
- ↑ https://www.thenews.com.pk/print/171610-Investors-seek-licences-to-set-up-200MW-solar-plants
- ↑ https://www.thenews.com.pk/print/171610-Investors-seek-licences-to-set-up-200MW-solar-plants
- ↑ https://www.thenews.com.pk/print/171610-Investors-seek-licences-to-set-up-200MW-solar-plants
- ↑ https://cleantechnica.com/2017/03/01/canadian-commercial-corporation-will-another-1-gigawatt-solar-pakistan/
- ↑ https://www.linkedin.com/pulse/20141109070630-190310188-potential-of-bagasse-fired-power-generation-in-pakistan.
- ↑ http://www.dawn.com/news/1136227
- ↑ http://www.psmacentre.com/sgindustry.php?sgid=3
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 http://www.brecorder.com/pakistan/industries-a-sectors/324894-387-mw-to-be-generated-by-2018-from-baggase.html
- ↑ https://tribune.com.pk/story/1399468/licence-sought-bagasse-based-power-plant/
- ↑ http://tribune.com.pk/story/1153868/expanding-business-sugar-mill-set-bagasse-based-power-plant/
- ↑ https://www.thenews.com.pk/print/213180-Three-companies-get-power-generation-licences
- ↑ https://www.thenews.com.pk/print/213180-Three-companies-get-power-generation-licences
- ↑ https://www.thenews.com.pk/print/213180-Three-companies-get-power-generation-licences
- ↑ https://tribune.com.pk/story/1149208/alternative-energy-biomass-power-plant-set-chinese-help/
- ↑ http://pakobserver.net/punjab-approves-rs165m-biomass-thermal-power-project/
- ↑ https://tribune.com.pk/story/1354447/lucky-cement-inaugurates-fifth-whr-plant-produce-10mw-power/
- ↑ https://tribune.com.pk/story/1354447/lucky-cement-inaugurates-fifth-whr-plant-produce-10mw-power/
- ↑ https://tribune.com.pk/story/1323005/iran-ready-increase-electricity-supply-pakistan/