Line 5, Chongqing Rail Transit

Line 5, Chongqing Rail Transit
 5 
Overview
Native name 重庆轨道交通5号线
Type Rapid transit
System Chongqing Rail Transit
Status Under construction
Locale Chongqing, China
Termini The EXPO Center
Dashiba
Stations 10
Line number 5
Operation
Planned opening December 2017 (2017-12)
Operator(s) Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length 19.2 km (11.9 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 1500 V DC Overhead line
Operating speed 120 km/h (75 mph) (Peak)
Route map as of 2018

Yuegang Ave.
Chunxuan Ave.
Left arrow Line 10 to Wangjiazhuang
Line 10 to Liyuchi Right arrow
Central Park W.  10 
Lujiagou
Ganyue Ave.
Yuhegou
The Expo Garden Center  3 [lower-alpha 1]
Danhe
Huxia St.
Chongguang
Hemu Rd.
Renhe
Dazhulin Depot
Xingfu Square
Left arrow Line 6 to Beibei
Ranjiaba  6   0 
Dalongshan  6 
       
Dalongshan  6 
Line 6 to Chayuan Right arrow
Dashiba
Zhongshutuo
Hongyancun Bridge
across Jialing River
Hongyancun  9 
Xietaizi  1 
Line 1 to Chaotianmen Right arrow
Shiqiaopu  1 
Shixin Rd.
Left arrow Line 1 to Jiandingpo
Bashan
Fengxi Rd.
Left arrow Loop Line
Chongqing W.
Railway Station
 0 
Loop Line Right arrow
Huayansi
Huacheng Rd.
Banshan
Zhongliangshan
Jinjian Rd.
Huayan Center
Zhongliangshan Depot
Tiaodeng  S5 
Notes
  1. Virtual interchange: transport card only, re-entry required.

Line 5 of CRT is a rapid transit line which is expected to be opened in December 2017.[1]

Planned Stations

Phase I

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
5/01 The EXPO Garden Center 园博中心  3  Yubei

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.