Line 3, Harbin Metro

Line 3, Harbin Metro
 3 
Overview
Type Rapid transit
System Harbin Metro
Status Operational
Locale Harbin, Heilongjiang, China
Stations Total: 37.6 km (23.36 mi)
Phase I: 5.25 km (3.26 mi)
Phase II: 32.35 km (20.10 mi)
Services 1
Operation
Opened Phase I: 26 January 2017
Phase II (Southeast): 2020
Phase II (Northwest): 2022
Owner Harbin Government
Operator(s) Harbin Metro Group Corporation
Character Underground
Technical
Line length Total: 3
Phase I: 5
Phase II: 31(Southeast: 20, Northwest: 11)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 3 of the Harbin Metro (Chinese: 哈尔滨地铁三号线; pinyin: Hāěrbīn Dìtiě Sān Hào Xiàn) a rapid transit line running in a circle around central Harbin. Under environmental evaluation since 2 March 2012 and stated for construction in 2014, Phase I will be operational by 2017. Line 3 will be 37.6km km long with 35 stations.[1][2] On January 28, 2017 the first section connecting Harbin West Railway Station to Line 1. The section is 5.45 km long.[3]

Stations

Station name Connections Distance
km
Location
English Chinese
Chengxianglu 城乡路 -1.30 -1.30 Daoli
Harbin West Station 哈尔滨西站 0.00 0.00 Nangang
Harbindajie 哈尔滨大街 0.70 0.70
Haxidajie 哈西大街 1.10 1.80
Yidaeryuan 医大二院  1  1.65 3.45

References

  1. "哈尔滨市地铁3号线通过环评" (in Chinese). 黑龙江省人民政府主办. Archived from the original on 4 May 2014. Retrieved 3 May 2014.
  2. "哈尔滨地铁3号线一期春节前通车试运营" (in Chinese). Retrieved 26 September 2016.
  3. 刘博. "哈尔滨地铁3号线一期工程通车试运营 迎来"换乘"时代-东北网黑龙江(东北网)-东北网". heilongjiang.dbw.cn. Retrieved 2017-02-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.