Line 2, Suzhou Rail Transit
Line 2, Suzhou Rail Transit | |
---|---|
2 | |
Overview | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Status | In operation |
Termini |
Qihe Sangtiandao |
Stations | total 35 stations, first phase are 22 stations (6 Elevated Stations, 16 Underground Stations), second phase are 13 stations. |
Operation | |
Owner | Suzhou Rail Transit Co., Ltd |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Character | Elevated and Underground |
Technical | |
Line length | 40.4 kilometres (25.1 mi) |
Track length | 79.2m |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | overhead wire |
Line 2 is the main north-south line of Suzhou Rail Transit. The length of first phase is 26.557 km, among them, 6.57 km is elevated, 19.146 km is underground and 0.67 km is open wide. The line's first phase started from Suzhou North Railway Station (高铁苏州北站) and ended in Baodaiqiao South Station (宝带桥南站) near Baodai Bridge (宝带桥). The line goes across five districts of Suzhou, including 22 stations(17 underground, 5 overhead). The first phase part was started to operation on December 28, 2013.[1]
The length of second phase is 14.347 km, which started from Qihe Station (骑河站) to Fuxiang Lu Station (富翔站) for north expand section, and Yinzhong Lu Station (尹中路站) to Sangtiandao Station (桑田岛站) for east expand section. The second phase part was started to trial operation on September 24, 2016.[2]
Opening timeline
Segment | Date opened | Length |
---|---|---|
Suzhou North — Baodaiqiao South | 28 December 2013 | 26.557 km (16.50 mi) |
Qihe — Suzhou North | 24 September 2016 | 2.2 km (1.37 mi) |
Baodaiqiao South — Sangtian Dao | 11.643 km (7.23 mi) |
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Qihe | 骑河 | 0.00 | 0.00 | Xiangcheng | ||
Fuxiang Lu | 富翔路 | 0.88 | 0.88 | |||
Suzhou North Railway Station | 高铁苏州北站 | 1.08 | 1.96 | |||
Dawan | 大湾 | 1.51 | 3.47 | |||
Fuyuan Lu | 富元路 | 1.98 | 5.45 | |||
Likou | 蠡口 | 1.70 | 7.15 | |||
Xutu Gang | 徐图港 | 1.40 | 8.55 | |||
Yangchenghu Zhonglu | 阳澄湖中路 | 1.00 | 9.55 | |||
Lumu | 陆慕 | 1.93 | 11.48 | |||
Pinglonglu East | 平泷路东 | 1.64 | 13.12 | |||
Pinghe Lu | 平河路 | 0.81 | 13.93 | Gusu | ||
Suzhou Railway Station | 苏州火车站 | 4 | 1.06 | 14.99 | ||
Shantang Jie | 山塘街 | 1.62 | 16.61 | |||
Shi Lu | 石路 | 0.96 | 17.57 | |||
Guangji Nanlu | 广济南路 | 1 | 0.81 | 18.38 | ||
Sanxiang Square | 三香广场 | 0.88 | 19.26 | |||
Laodong Lu | 劳动路 | 0.62 | 19.88 | |||
Xujiang Lu | 胥江路 | 0.77 | 20.65 | |||
Tongjing Park | 桐泾公园 | 0.73 | 21.38 | |||
Youlian | 友联 | 1.24 | 22.62 | Wuzhong | ||
Panli Lu | 盘蠡路 | 3 | 1.10 | 23.72 | ||
Xinjia Qiao | 新家桥 | 1.08 | 24.80 | |||
Shihu Donglu | 石湖东路 | 4 | 1.62 | 26.42 | ||
Baodaiqiao South | 宝带桥南 | 1.88 | 28.30 | |||
Yinzhong Lu | 尹中路 | 1.50 | 29.80 | |||
Guoxiang | 郭巷 | 0.90 | 30.70 | |||
Guoyuan Lu | 郭苑路 | 1.02 | 31.72 | |||
Yinshan Lake | 尹山湖 | 1.07 | 32.79 | |||
Dushuhu South | 独墅湖南 | 0.89 | 33.68 | Gusu | ||
Dushuhu Neighbor Center | 独墅湖邻里中心 | 2.03 | 35.71 | |||
Yueliang Wan | 月亮湾 | 0.91 | 36.62 | |||
Songtao Jie | 松涛街 | 1.23 | 37.85 | |||
Jingu Lu | 金谷路 | 1.75 | 39.60 | |||
Jinshang Lu | 金尚路 | 1.33 | 40.93 | |||
Sangtian Dao | 桑田岛 | 1.07 | 42.00 | |||
Operations
Intervals
Weekdays & Weekends | ||
---|---|---|
Period | Time | Intervals |
weekdays morning rush hours(Peak) | 7:45 — 9:00 | 6m10s |
weekdays evening rush hours(Peak) | 17:00 — 19:00 | 6m10s |
weekends daily rush hours(Peak) | 11:00 — 20:40 | 6m10s |
Other hours(Normal) | Exclude above rush hours | 6m50s |
Fares
Fares start at 2.00 Yuan (¥) and can take 6 kilometers (km), 6 km to 16 km every additional 1.00 Yuan (¥) can take 5 km, 16 km to 30 km every additional 1 Yuan (¥) can take 7 km, 30 km and above every additional 1 Yuan (¥) can take 9 km, so the whole journey of Line 2 is 8 Yuan (¥).
References
- ↑ 2号线施工6月底结束 12月28日试营运. 扬子晚报 (in Chinese). 2013-02-22. Retrieved 2013-03-25.
- ↑ "终于定了!苏州轨交2号线延伸线明天正式开通". 新华报业网. 2016-09-23.
- ↑ http://sz.sohu.com/20131226/n392423828.shtml