Kolkata Metro Line 6
Kolkata Metro Line 6 | |
---|---|
Overview | |
Type | Rapid transit |
System | Kolkata Metro |
Status | Under Construction |
Locale | Kolkata, India |
Termini |
Kavi Subhash (south) Jai Hind (north) |
Stations | 24 |
Daily ridership | 500000 (projected) |
Website | KMRC |
Operation | |
Opened | 2018 (5km) |
Operator(s) | KMRC |
Character |
|
Technical | |
Line length | 29.10 kilometres (18.08 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC[1] using third rail |
Operating speed | 80 km/h (designed) |
A connection between New Garia and the Airport (29.1 km) via E M Bypass, Saltlake and Rajarhat has started; it will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport. The work on this New Garia-Airport line was inaugurated by Mamata Banerjee on 7 February 2011 with a project deadline of six years.[2] The link between Kavi Subhas (New Garia) and the airport, to be set up at a cost of Rs4 billion, will have 24 stations with the terminal Airport station being an underground one.
Work for construction of the terminal station at New Garia for the 32-km Kavi Subhash-Airport (via Rajarhat) Metro project finally resumed on 14th February 2017 with Rail Vikas Nigam Ltd (RVNL) demarcating the plot they require for the purpose.
The 5km stretch from New Garia to Ruby Hospital is expected to start from 2018.
Stations
The stations, as declared of now, will be named after eminent personalities.[2]
Line 6 | |||||||||
---|---|---|---|---|---|---|---|---|---|
No. | Station Name | Location | Opening | Connections | Layout | Coordinates | Notes | ||
English | Bengali | Hindi | |||||||
1 | Jai Hind | জয় হিন্দ | जय हिंद | Netaji Subhash Chandra Bose International Airport | Under construction | Kolkata Metro Line 4 (Under Construction); Biman Bandar railway station | Underground | Also known as Biman Bhandar | |
2 | Kazi Nazrul Islam Avenue | কাজী নজরূল ইসলাম সরনী | काज़ी नज़रुल इस्लाम सरनी | Kaikhali | Under construction | Elevated | Also known as VIP Road | ||
3 | New Town | নিউ টাউন | न्यू टाउन | Newtown | Under construction | Elevated | Also known as Chinar Park | ||
4 | Titumir | তিতুমীর | तितुमिर | Newtown | Under construction | Elevated | |||
5 | Sub CBD 2 | সাব সিবিডি ২ | सब सीबीडी २ | Newtown | Under construction | Elevated | Also known as Akankha 5-point crossing | ||
6 | Convention Centre | কনভেনশন সেন্টার | कन्वेंशन सेंटर | Newtown | Under construction | Elevated | Also known as Nawabpur | ||
7 | Prakriti Tirtha | প্রকৃতি তীর্থ | प्रकृति तीर्थ | Newtown | Under Construction | Elevated | Also known as Eco Park | ||
8 | Baanijya Tirtha | বাণিজ্য তীর্থ | वाणिज्य तीर्थ | Newtown | Under construction | Elevated | Also known as Newtown CBD/Kalashetra | ||
9 | Rabindra Tirtha | রবীন্দ্র তীর্থ | रवीन्द्र तीर्थ | Newtown | Under construction | Elevated | Also known as Narkelbagan | ||
10 | Vivek Tirtha | বিবেক তীর্থ | विवेक तीर्थ | Newtown | Under construction | Elevated | Also known as Sub CBD 1 | ||
11 | Nazrul Tirtha | নজরুল তীর্থ | नज़रुल तीर्थ | Newtown | Under construction | Elevated | Also known as Newtown Bus Stand | ||
12 | Bidhannagar Limit | বিধাননগর লিমিট | बिधाननगर लिमिट | Newtown | Under construction | Elevated | Also known as Technopolis | ||
13 | Salt Lake Sector V | সল্ট লেক সেক্টর ৫ | सौल्ट लेक सेक्टर ५ | Salt Lake Sector V | Under construction | Kolkata Metro Line 2 (Under Construction) | Elevated | ||
14 | Nicco Park | নিক্কো পার্ক | निक्को पार्क | Salt Lake Sector V | Under construction | Elevated | |||
15 | Gour Kishore Ghosh | গৌর কিশোর ঘোষ | गौर किशोर घोष | Salt Lake Sector V | Under construction | Elevated | Also known as Chingrighata | ||
16 | Varun Sengupta | বরুন সেনগুপ্ত | वरुण सेनगुप्ता | EM Bypass | Under construction | Elevated | Also known as Barataman Bhawan | ||
17 | Ritwik Ghatak | ঋত্বিক ঘটক | ऋत्विक घटक | Science City | Under construction | Elevated | Also known as Science City | ||
18 | VIP Bazaar | ভি আই পি বাজার | वी आई पी बाजार | VIP Bazaar | Under construction | Elevated | |||
19 | Hemanta Mukherjee | হেমন্ত মুখোপাধ্যায় | हेमंत मुखर्जी | DESUN More crossing | Under construction | Elevated | Also known as Kasba Golpark | ||
20 | Kavi Sukanta | কবি সুকান্ত | कवि सुकांत | Kalikapur | Under construction | Elevated | Also known as Kalikapur | ||
21 | Jyotindra Nath Nandi | যতীন্দ্র নাথ নন্দী | ज्योतिंद्र नाथ नंदी | Mukundapur | Under construction | Elevated | Also known as Mukundapur | ||
22 | Satyajit Ray | সত্যজিৎ রায় | सत्यजीत राय | Bagha Jatin/Peerless Hospital | Under construction | Elevated | Also known as Bagha Jatin | ||
23 | Kavi Subhash | কবি সুভাষ | कवि सुभाष | New Garia | 7 October 2010 | Kolkata Metro Line 1 and New Garia Railway station (Eastern Suburban Railways) | At Grade | Also known as New Garia | |
See also
- Kolkata Metro
- List of Kolkata metro stations
- Kolkata Metro Rolling Stock
- List of rapid transit systems
- Kolkata tram
- Kolkata Lightrail
- Kolkata Monorail
- Kolkata Suburban Railway
References
- ↑
- 1 2 "Rail set to take over East-West". The Telegraph. Calcutta, India. 8 February 2011.