Kembangan MRT Station
EW6 Kembangan 景万岸 கெம்பாங்கான் Kembangan | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Platform level of Kembangan MRT station. | |||||||||||
Location |
55 Sims Avenue East Singapore 416551 | ||||||||||
Coordinates | 1°19′15.54″N 103°54′46.23″E / 1.3209833°N 103.9128417°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | EW6 | ||||||||||
History | |||||||||||
Opened | 4 November 1989 | ||||||||||
Previous names | Frankel | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Kembangan MRT Station (EW6) is an above-ground Mass Rapid Transit station on the East West Line in Bedok, Singapore. The station is situated at the junction of Sims Avenue East and Jalan Kembangan, right above the Siglap Canal. It is near several private landed properties and condominiums. The station colour is emerald green.
History
As with most of the above-ground stations built in the past along the East West Line, it was built without platform screen doors. After several successful test at Jurong East, Yishun and Pasir Ris and eventually, installation of the half-height screen doors to prevent commuters from falling onto the train tracks. Installation started in December 2010 and the platform screen doors started operations on 25 February 2011 with Kallang.[1]
This station is also installed with Rite Hite Revolution High Volume, Low Speed (HVLS) fans, and started operating since 14 July 2012 together with Paya Lebar.
Privacy screens were installed from Kembangan MRT Station to Lorong Mydin to minimise noise impact from residents, from September 2016.
Station layout
L2 | Platform A | East West Line towards EW1 Pasir Ris via EW5 Bedok → East West Line towards CG2 Changi Airport via EW5 Bedok → (Transfer at EW4 CG Tanah Merah) |
Island platform, doors will open on the right | ||
Platform B | East West Line towards EW33 Tuas Link via EW7 Eunos ← | |
L1 | EWL Concourse | Faregates, Ticketing Machines, Station Control, |
Street Level | Kembangan Plaza |
Exits
- A: Sims Avenue East, Waringin Walk, Siglap Close/Opera Estate (by bus 42)
- B: Kampong Kembangan Estate (by bus 42)
Transport connections
Rail
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
East West Line | ||||||
to EW1 Pasir Ris | 6.15am | 6.43am | 12.26am | |||
to EW33 Tuas Link | 5.42am | 6.08am | 11.37pm |
References
- ↑ Wong, Siew Ying (January 26, 2008). "Above-ground MRT stations to have platform screen doors by 2012". Channel NewsAsia. Archived from the original on July 30, 2012. Retrieved February 1, 2012.
External links
Wikimedia Commons has media related to Kembangan MRT Station. |