InterCity 225

InterCity 225

An InterCity 225 on the East Coast Main Line
Type and origin
Power type Electric
Builder BREL, GEC-Alsthom, Metro Cammell
Build date 1988—1991 [1]
Total produced 31 nine-carriage units [2]
Specifications
Configuration:
  UIC Bo′Bo′+2′2′+...+2′2′+2′2′
Performance figures
Maximum speed 140 mph (225 km/h) (Design)
125 mph (201 km/h) (Service)
161.7 mph (260.2 km/h) (Record)
Power output 6,300 horsepower (4.7 MW)
Career
Operators British Rail
GNER
National Express East Coast
East Coast
Virgin Trains East Coast
Disposition In service
Project Mallard refurbished First Class carriage

The InterCity 225 is an electric high speed train in the United Kingdom, comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train project,[3][4] which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro Cammell in Birmingham and Breda (under sub-contract) in Italy, again borrowing heavily from the Advanced Passenger Train. The trains were designed to operate at up to 140 mph (225 km/h) in regular service, but are limited to 125 mph (200 km/h) principally due to a lack of cab signalling and the limitations of the current overhead line equipment. They are used on services from London King's Cross to Newark North Gate, Leeds, Bradford Forster Square, Skipton, York, Newcastle, Edinburgh Waverley and Glasgow Central.

Service history

The InterCity 225 entered service with British Rail on the East Coast Main Line in 1990. The units also operate on a small section of the West Coast Main Line (WCML) between Carstairs and Glasgow. When the line north of Newcastle is closed, they are hauled by diesel locomotive to Carlisle via the Tyne Valley line from where they operate north via the WCML under their own power. In 1996, as part of the privatisation of British Rail, all InterCity 225s were sold to Eversholt Rail Group, which currently leases them to Virgin Trains East Coast (VTEC).

The InterCity 225 has a top service speed of 140 mph (225 km/h); during a test run on Stoke Bank between Peterborough and Gratham an Intercity 225 reached 161.7 mph (260.2 km/h). However, except on High Speed 1, which is equipped with cab signalling, British signalling does not allow trains to exceed 125 mph (201 km/h) in regular service, due to the impracticality of correctly observing lineside signals at high speed.

Between 2001 and April 2006, HSBC Rail funded with support from GNER, Bombardier Transportation, Alstom and others a complete rebuilding and refurbishment programme for both the Class 91 and Mark 4 coaches, called Project Mallard.

Capacity and Formation

The formation of the InterCity 225 sets is below:- [5]

The total numbers of seats are 406 Standard and 129 First, giving the train an overall capacity of 535 seats.

Replacements

As part of the Intercity Express Programme, 30 nine-car electric trains are to replace Intercity 225 sets by 2020.[6]

Future

Although it originally envisaged all InterCity 225 would be withdrawn by 2020, in May 2016 VTEC was awarded extra paths for London to Edinburgh services that will see a fleet of six to eight trains retained.[7] In June 2017, Alliance Rail Holdings announced it planned to use InterCity 225s on its proposed London Euston to Blackpool North WCML services.[8]

References

  1. thejunction.org.uk, rolling stock: class 91, Retrieved on 04-07-2007
  2. Oliver Keating, The Inter-city 225, Retrieved on 04-07-2007
  3. "The Design and Development of the Class 91 Locomotive", P J Donnison and G R West, Main Line Railway Electrification Conference 1989 - Proceedings of the Institute of Electrical Engineers, 1989.
  4. "The design, manufacture and assembly of the British Rail Class 91, 25kV 225km/h locomotive", M L Broom and G W Smart, Proceedings of the Institute of Mechanical Engineers Vol. 205, 1990.
  5. http://static.eastcoastcdn.co.uk/cdn-1cc20728db77bf5/documents/pdfs/seat%20maps/mallard%20coach2011.pdf
  6. East Coast Main Line IEP train order confirmed Railway Gazette International 18 July 2013
  7. VTEC and FirstGroup granted East Coast Main Line paths Railway Gazette International 12 May 2016
  8. Alliance drops Pendolino plan as Southampton paths identified Railway Gazette International 19 July 2017

Further reading

Media related to British Rail Class 91 at Wikimedia Commons
Media related to British Rail Mk4 coaches at Wikimedia Commons
Media related to British Rail Mk4 DVT at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.