Hillview MRT Station

 DT3 
Hillview
山景
ஹில்வியூ
Hillview
Rapid transit

Platform of Hillview
Location 510 Upper Bukit Timah Road
Singapore 678211
Coordinates 1°21′45″N 103°46′03″E / 1.362472°N 103.767389°E / 1.362472; 103.767389
Operated by SBS Transit DTL
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 2
Disabled access Yes
Other information
Station code  DT3 
History
Opened 27 December 2015
Services
Preceding station   Mass Rapid Transit   Following station
towards Bukit Panjang
Downtown Line
towards Chinatown
Location

Hillview MRT Station (DT3) is an underground Mass Rapid Transit station on the Downtown Line situated at Upper Bukit Timah. The station serves the Upper Bukit Timah corridor at the junction between Upper Bukit Timah Road and Hillview Avenue. The vicinity is largely residential, with commercial buildings such as the Rail Mall within walking distance.[1]

The section of track between Hillview and Beauty World stations is the longest between any two stations on the Downtown Line. There exists a basic structural provisions for a possible future station (also known as a "box station") along this section of track.[2]

Art in Transit

"What Remains" by Darren Soh is an artwork that documents the remnants of the KTM railway line.

Station layout

L1 Street Level Rail Mall
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform B Downtown Line towards  DT19  NE4  Chinatown via  DT5  Beauty World
Island platform, doors will open on the right
Platform A Downtown Line towards  DT1  BP6  Bukit Panjang via  DT2  Cashew

Exits

Transport connections

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
Downtown Line
to DT1 Bukit Panjang 6.12am 6.33am 12.44am
to DT19 Chinatown 5.34am 5.54am 11.39pm

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.