Downtown Seattle Transit Tunnel

Downtown Seattle Transit Tunnel

Two large tunnel tubes with rails embedded in concrete running into them

The southbound portal at Westlake station
Overview
Other name(s) Metro Bus Tunnel
Line


King County Metro: 41, 74, 101, 102, 150, 255
Sound Transit Express: 550

Location Seattle, Washington, U.S.
System Sound Transit Link light rail, Sound Transit Express, King County Metro
Start 9th Avenue and Pine Street
End 5th Avenue S and S Jackson Street
No. of stations 5
Operation
Work begun March 6, 1987 (1987-03-06)
Opened September 15, 1990 (1990-09-15)
Rebuilt 2005–2007
Reopened September 24, 2007 (2007-09-24)
Owner King County Metro
Operator King County Metro, Sound Transit
Traffic Light rail, bus
Technical
Length 1.3 miles (2.1 km)[1]
No. of tracks Double
Track gauge 4 ft 8 12 in (1,435 mm)
Electrified 1,500 V DC, Overhead catenary[2]
Operating speed 30 mph (48 km/h)
Width 18 ft (5.5 m)
Route map
Downtown Seattle Transit Tunnel

Interstate 5 North

Convention Place
Link light rail
Central Link
to University of Washington
Westlake
University Street
Pioneer Square

International District/Chinatown
Interstate 90 East
SODO Busway
to Interstate 5 South
Link light rail
Central Link
to Angle Lake

 Key 
bus/rail tunnel station

bus only station

The Downtown Seattle Transit Tunnel (DSTT), also referred to as the Metro Bus Tunnel, is a 1.3-mile-long (2.1 km) pair of public transit tunnels in Seattle, Washington, United States. The tunnel serves Downtown Seattle, running west under Pine Street from 9th Avenue to 3rd Avenue, and south under 3rd Avenue to South Jackson Street. It was used only by buses from its opening in 1990 until 2005, and since 2009 it has been shared by buses and light rail. The double-track tunnel and its stations, except Convention Place, constitute parts of the Central Link light rail line, which continues north to the University of Washington station and south through the Rainier Valley to Seattle–Tacoma International Airport as part of Sound Transit's Link light rail network. Its five stations are also served by buses from King County Metro and Sound Transit Express that leave the tunnel north via Interstate 5, south via the SODO Busway, or east via Interstate 90. The DSTT is the busiest section of the Link light rail network, with an average of over 10,000 weekday boardings. It is owned by King County Metro and shared with Sound Transit, who signed a joint-operating agreement after ownership was transferred back to King County in 2002. The Downtown Seattle Transit Tunnel is one of two tunnels in the United States shared by buses and trains, the other being the Mount Washington Transit Tunnel in Pittsburgh, Pennsylvania, and is the only one in the United States with shared stations.

Though proposals for a rapid transit tunnel under 3rd Avenue date back to the 1910s and 1920s, planning for the modern bus and rail Metro Bus Tunnel only began in 1974. The King County Metro Council approved the bus tunnel proposal in November 1983, but construction did not begin until March 1987. The tunnel between Convention Place and Westlake stations was built using the cut-and-cover method, closing Pine Street for 19 months and disrupting nearby retail businesses. The segment from Westlake to the International District was bored with two tunnel-boring machines, heading north from Union Station and finishing within a month of each other. Tests of normal buses and the Breda dual-mode buses built specifically for tunnel routes began in March 1989, with tunnel construction declared complete in June 1990, at a cost of $455 million. Light rail tracks were installed in anticipation of future rapid transit service through the tunnel, which was later found to be poorly insulated and unusable for Link light rail. Soft openings of the five tunnel stations were held from August 1989 to September 1990, with regular bus service beginning on September 15, carrying 28,000 daily passengers in its first year of operation. For the next several years, until June 2004, service in the tunnel was provided exclusively by dual-mode buses, which ran as trolleybuses in the tunnel  like the city's extensive trolleybus system  and as diesel buses on surface streets and freeways.

The tunnel was closed on September 24, 2005, for modification to accommodate both buses and Sound Transit's Central Link light rail trains with shared lanes and platforms. The roadway was lowered to 8 inches (20 cm) and other improvements were made to prepare for light rail service. New hybrid electric buses were moved into the tunnel to replace the Breda fleet, as the overhead wire was replaced for light rail trains. The tunnel reopened on September 24, 2007, and light rail service began on July 18, 2009. A stub tunnel, branching from the main tunnel, was constructed under Pine Street to allow light rail trains to stop and reverse direction; it was later used as the first segment of a light rail extension to Capitol Hill that opened in 2016. The downtown transit tunnel is planned to lose its bus service during the permanent closure of Convention Place station in 2019; from that point on, the tunnel will be used only by light rail trains.

Route and stations

A train in a large, cavernous underground station. A bus can be seen in the background heading the opposite direction.
Pioneer Square station, located near the tunnel's southern terminus

The 1.3-mile-long (2.1 km), 18-foot-diameter (5.5 m)[3] twin tunnels serve the Central Link light rail line, which uses the tunnel between Westlake and International District/Chinatown stations,[4] and seven bus routes for King County Metro and Sound Transit Express, which run between Convention Place station and International District/Chinatown station.[5] Entrances at the three middle stations are built into nearby buildings with variable-message signs over the stairs and elevators leading to the mezzanines. There is a total of 11 wheelchair-accessible elevators to the tunnel stations, as mandated by Title II of the Americans with Disabilities Act and the United States Department of Transportation.[6][7] As part of the city's public art program that began in 1973, the Downtown Seattle Transit Tunnel and its stations were furnished with $1.5 million in artwork by 25 artists commissioned by King County Metro.[8][9] All tunnel stations, except Convention Place, are 60 feet (18 m) below street level and consist of two side platforms, two pickup lanes, and a passing lane in the middle.[10][11]

The northern portal, accessible to buses at street level from Olive Way, and from Interstate 5 via an express lane ramp, is Convention Place Station at the intersection of 9th Avenue and Pine Street near the Washington State Convention Center. Convention Place is the only bus-exclusive station in the tunnel, and consists of four sheltered platforms in a sunken, open-air layover space below street level.[12] Buses enter the tunnel under 9th Avenue, passing under the historic Camlin Hotel, before joining the University Link Tunnel used by light rail trains headed north for three blocks under Pine Street to Capitol Hill station.[13][14]

The DSTT enters Westlake station under Pine Street between 3rd and 6th avenues, located between the Westlake Center shopping mall and Westlake Park. The station features a two-block-long mezzanine with exits to Pine Street and several retailers, including the Westlake Center, Macy's in the former The Bon Marché flagship store, and the headquarters of Nordstrom, as well as the King County Metro customer service center.[15] The area around the station is known as the Westlake Hub, with connections to the South Lake Union Streetcar and the Seattle Center Monorail as well as the King County Metro and Sound Transit buses.[16] Leaving Westlake Station, the tunnel turns south under Century Square to follow 3rd Avenue and its transit mall through the central business district, parallel to the shoreline of Elliott Bay.[14]

Three blocks south of Pine Street, buses and trains enter University Street station, located between Union and Seneca streets adjacent to Benaroya Hall and 1201 Third Avenue in the financial district. The station has a split mezzanine, with entrances to 2nd Avenue and University Street accessible from the north half, and an entrance to Seneca Street from the south half.[17] From University Street, the tunnel continues under 3rd Avenue for five blocks, entering the Pioneer Square neighborhood and historic district. At this point, 3rd Avenue passes several of Seattle's skyscrapers, including the historic Seattle Tower, Safeco Plaza, the Fourth and Madison Building and the Wells Fargo Center.[14] Within University Street station, the tunnel passes over the century-old Great Northern Tunnel with a clearance of 15 feet (5 m).[18]

Pioneer Square station is located between Cherry Street and Yesler Way, with four entrances to nearby streets and Prefontaine Place serving two mezzanines. The station serves the administrative centers of the Seattle and King County governments, located within walking distance of Seattle City Hall, the Seattle Municipal Tower, the King County Courthouse and the King County Administration Building, as well as other major buildings, including Smith Tower, Columbia Center and the Alaska Building.[19] The Seattle Civic Square project at the northeast side of the station, proposed to include integrated entrances from the intersection of 3rd Avenues and James Street,[20] has been on hold since 2009.[21] From Pioneer Square, the tunnel travels down a 5.5% grade to cross 4.5 feet (1.4 m) under the Great Northern Tunnel at a 45-degree angle near the intersection of 4th Avenue South and South Washington Street, briefly descending below sea level,[22] before turning cardinal south into the International District neighborhood.[14][18][23]

International District/Chinatown station, the southernmost tunnel station, is partially open-air and located immediately below a public plaza at Union Station. The station has connections to Amtrak and Sounder commuter rail at King Street Station a block to the west, accessible through the Weller Street Bridge, as well as the First Hill Streetcar on Jackson Street, stopping east of 5th Avenue South.[24][25] Other attractions near the station include CenturyLink Field to the west and Uwajimaya a block to the southeast.[14][26] South of the station, the light rail tracks, and bus lanes are separated by railway signals at an underground bus layover and staging area next to the tunnel comfort room for bus drivers.[27] The southern portal of the tunnel is located under the intersection of Airport Way and 5th Avenue South at the western terminus of the Interstate 90 express lanes for high-occupancy vehicles.[28] Light rail trains and southbound buses continue from the tunnel in separated lanes on the SODO Busway, while eastbound buses use a ramp that merges with the Interstate 90 express lanes that will be retrofitted for the East Link light rail service in 2023.[29]

Service

A green bus pulling up to the curb of an underground station, pictured alongside a white train heading in the opposite direction.
A King County Metro bus and Sound Transit Link light rail train at University Street station, one of the shared bus–rail stations.

The Downtown Seattle Transit Tunnel is part of the "Third Avenue Transit Spine," the busiest transit corridor in Seattle, serving a combined average of 54,000 weekday riders with bus stops on the surface.[30] The tunnel has a theoretical capacity of 40 trains per hour per direction with a minimum of 90-second headways, carrying 22,000 passengers per hour per direction,[31] but is only able to carry 12,000 per hour per direction in 4-car light rail vehicles with current systems in place.[32] Prior to the start of Link light rail service, the DSTT could serve up to 145 buses during the afternoon rush hour.[33] As of 2012, the DSTT carries 52,600 daily riders, of which 10,000 are on light rail.[34] The tunnel carries a segment of the Central Link light rail line, which runs from the University of Washington station through Downtown Seattle and the Rainier Valley to Seattle–Tacoma International Airport. Trains serve all downtown tunnel stations, excluding Convention Place station,[12] 20 hours a day every day; during regular weekday service, trains run roughly every six to 10 minutes during rush hour and midday operation, respectively, with longer headways of 15 minutes in the early morning and 20 minutes at night. During weekends, Central Link trains arrive every 10 minutes during midday hours and every 15 minutes during mornings and evenings. Light rail service from Westlake to International District/Chinatown takes approximately seven minutes.[4][35]

As of September 2016, the DSTT is served by seven bus routes, stopping at all five tunnel stations. At each station, bus routes are divided into three bays labeled with their general direction. Bay A is served by three routes heading north toward Northgate and the University District and east to Kirkland via State Route 520; Bay C is served by three routes heading south through the SODO Busway toward the Rainier Valley and Renton; and Bay D is served by a single route, Sound Transit Express route 550, heading east to Mercer Island and Bellevue via Interstate 90.[36][37] Since June 2012, inbound buses have been allowed to drop off and pick up passengers at the front end of the platform, enabled after the elimination of the Ride Free Area to speed up boarding times.[38]

During closures of the Downtown Seattle Transit Tunnel, tunnel buses are rerouted onto 2nd and 4th Avenues between Yesler Way and Pine Street, and Stewart Street and Olive Way between 2nd and Boren Avenues. Metro also runs a special route, the Route 97 Link Shuttle, between all Link light rail stations during service disruptions.[39]

Operations

The DSTT is open for 20 hours on weekdays and Saturdays, from 5:00 am to 1:00 am the following day, and for 18 hours on Sundays, from 6:00 am to midnight.[5] At the time of its opening in 1990, the Metro Bus Tunnel only operated from 5:00 am to 7:00 pm on weekdays and 10:00 am to 6:00 pm on Saturdays, with no Sunday service;[40] the operating hours were temporarily extended into weekday nights from 1998 to 2000 at the request of the Seattle Seahawks and Seattle Mariners,[41] but were cut after the passage of Initiative 695 and subsequent loss of motor vehicle excise tax revenue.[42] Preparations for Link light rail service restored late-night and full weekend hours for the tunnel, introduced in June 2009 after Sound Transit Express route 550 moved all of its trips into the tunnel.[43]

Coordination between buses and trains in the tunnel is managed by the Link Light Rail Operations Control Center (OCC), located at the King County Metro Communication and Control Center in SoDo. The OCC controls vehicle separation between buses and trains by using on-board radio-frequency identification tags installed on tunnel buses and light rail vehicles, with their locations tracked by passing over induction loops embedded in the tunnel roadway. Railway signals at each station indicate when a driver can proceed through the tunnel.[44] Within the DSTT, bus speed limits are set at 15 miles per hour (24 km/h) in stations and staging areas and 30 miles per hour (48 km/h) between stations.[45] Light rail trains and buses are required to wait in the tunnels between stations until the platform is cleared of vehicles ahead;[46] buses are mandated to keep a minimum of six seconds of separation between each other.[27]

King County Metro and Sound Transit, the joint operators of the tunnel, use two types of vehicles in the Downtown Seattle Transit Tunnel: Kinkisharyo-Mitsui light rail vehicles and New Flyer diesel-electric hybrid buses.[47] The buses, dubbed "tunnel buses" by King County Metro, were ordered in 2004 to replace a fleet of Breda dual-mode electric trolleybuses whose overhead wire was to be removed in the tunnel's renovation for light rail;[48] 59 of the dual-mode Breda coaches were converted into fully electric trolleybuses between 2004 and 2007 and moved to surface routes,[49][50] where they continued to operate for more than a decade before being fully replaced in 2016.[51] The New Flyer low-floor, 61-foot-long (19 m) articulated buses feature a "hush mode" that allows buses to operate solely on stored electric power within the tunnel, minimizing emissions and noise.[52]

History

Previous subway proposals

Several proposals for a cut-and-cover subway tunnel under 3rd Avenue in Downtown Seattle were presented to the City of Seattle by predecessors of the Seattle Planning Commission throughout the 20th century. The first major proposal was part of urban planner Virgil Bogue's "Plan for Seattle" in 1911, as Route 1 of a proposed rapid transit network. Route 1 ran southeast on 3rd Avenue from a circular ring around a proposed civic center in the Denny Regrade neighborhood to King Street Station, paralleled to the west by a subway on 1st Avenue known as Route 17; stations on the line would have additional entrances from department stores and other major businesses on 3rd Avenue.[53][54] The plan was supported by City Engineer Reginald H. Thomson and the Municipal League among others, while opposed by businesses fearing it would shift the commercial district further north, and by the three daily newspapers published in Seattle. A special municipal election for the comprehensive plan was held on March 5, 1912, in which Seattle voters rejected it by a 10,000-vote margin.[55][56]

Although Bogue's proposal was ultimately rejected, some elements of the plan were independently studied by others, including a rapid transit subway in Downtown Seattle. In 1920, City Engineer Arthur H. Dimmock published a report recommending a rapid transit system for the city of Seattle, centered around a cut-and-cover subway tunnel under 3rd Avenue from Virginia Street to Yesler Way. The line would be connected to surface and elevated lines at Dexter Avenue, Olive Way and South Jackson Street, serving the neighborhoods of Fremont, Eastlake, Capitol Hill, and North Delridge in West Seattle.[57][58] The proposal, which was expected not to be acted upon for at least 15 years, gained little support, and was called a project of "purely academic interest" by Mayor Hugh M. Caldwell, who doubted that any rapid transit proposal would be seriously considered during his term.[59] The Seattle City Planning Commission proposed its own rapid transit system in 1926, centered on an elevated line over Western Avenue with a possible parallel subway under 3rd Avenue from Yesler Way to Pike Street.[60] The Seattle Traffic Research Commission published a report in 1928 recommending a subway under 2nd Avenue from King Street Station to Pike Street as part of a longer rapid transit line serving the University District and Fremont.[61] In the late 1950s, the Seattle Transit Commission proposed building a rapid transit system on the existing right-of-way used by Interstate 5 between Tacoma, Seattle and Everett, with a two-station subway under 5th Avenue in Downtown Seattle.[62]

The most significant rapid transit proposal came as part of the Forward Thrust initiatives of the late 1960s, which was centered around a downtown subway under 3rd Avenue. The subway was to be fed by lines from Ballard, Lake City, the University District, Capitol Hill, Bellevue, and Renton, combining for a planned minimum headway of 1 .5 minutes at rush hour, 2 .5 minutes during midday, and five minutes at all other times.[63] The stations on 3rd Avenue were to be situated at South Jackson Street and 5th Avenue South, James and Cherry streets, Seneca and Spring streets, and Pike and Pine streets, all planned to open by 1985 and operated by the Municipality of Metropolitan Seattle.[64] Seattle voters were asked to provide $385 million (equivalent to $2.65 billion in 2016 dollars),[65] to supplement a $765 million grant (equivalent to $5.27 billion in 2016 dollars)[65] from the Urban Mass Transportation Administration (UMTA), during a municipal election on February 13, 1968, narrowly passing the bond by 50.8%, but falling short of the required 60 percent supermajority.[66] A second attempt on May 19, 1970, with an adjusted $440 million local contribution (equivalent to $2.71 billion in 2016 dollars)[65] and $881 million federal grant (equivalent to $5.43 billion in 2016 dollars),[65] failed to pass with only 46% approval amid a local recession caused by layoffs at Boeing; the earmarked funds intended for the Forward Thrust rapid transit project were instead allocated to Atlanta, Georgia to build their rapid transit system.[67]

Bus tunnel proposal and approval

The concept of a downtown bus tunnel was first proposed in 1974 during discussions between Governor Dan Evans and Seattle Mayor Wes Uhlman about regional transportation projects in response to the proposed extension of Interstate 90 into Seattle via a third floating bridge crossing Lake Washington.[68] Metro Transit later commissioned a study into the bus tunnel,[69] released the following July, which determined that it would not be able to adequately meet the rush hour demand of downtown bus ridership by 1980. The study suggested that a double-decked tunnel with automated guideway transit to complement bus service, running from Union Station to the Seattle Center, would be able to meet projected demand at an estimated cost of $450 million.[70] Ultimately, the plan was rejected because of the high cost of ventilation for diesel buses that would use the tunnel.[71] The bus tunnel proposal resurfaced in 1979, outlining a tunnel from South Jackson Street to Pine Street that would carry 200 buses an hour in each direction at a cost of up to $350 million with the option of conversion for electric rail transit in the future. It was suggested by Metro officials and engineering consultants Parsons Brinckerhoff as part of a series of proposals from a task force on studying solutions to downtown traffic were unable to find suitable alternatives.[71] The proposal gained further support from Metro Transit in their long-term "Metro 1990" plan, adopted in 1981, in which a transit mall or tunnel under 3rd Avenue carrying buses to be converted for a light rail system was suggested by the Puget Sound Council of Governments (PSCOG).[72]

The Metro Transit Committee debated the inclusion of the bus tunnel in the environmental impact assessment of the Downtown Seattle Transit Project well into 1983, with Seattle members opposing the tunnel in favor of a transit mall and suburban members supporting a bus tunnel that would be converted to a light rail system connecting Seattle to Snohomish County proposed by the PSCOG.[73][74][75] On September 22, UMTA requested that a preferred alternative be declared by the end of November, which prompted the Metro Council to expedite their decision. Metro Council Executive Director Neil Peterson favored the tunnel alternative, while the Seattle City Council and Mayor Charles Royer preferred a car-free street mall, but stated that a tunnel would be a long-term solution to downtown congestion.[76] The Seattle City Council reversed its decision on their preferred alternative, voting unanimously on October 17 in favor of an electric-only transit tunnel. Along with Mayor Royer, they were willing to compromise on Peterson's proposed dual-mode buses to serve suburban commuters where trolleybuses were not feasible.[77] The Metro Council approved the downtown bus tunnel by a unanimous vote on November 3, 1983, estimating a cost of $300 million to build a five-station tunnel under 3rd Avenue and Pine Street to be completed in 1989 along with the conversion of 3rd Avenue into a landscaped transit mall.[78]

Planning, funding and design

Metro unveiled its preliminary plans for the bus tunnel in January 1984, selecting five sites for stations along 3rd Avenue and Pine Street: at Union Station, the King County Courthouse, between Seneca and Union streets, at the Westlake Mall, and near the Washington State Convention Center. The Burlington Northern Railroad opposed Metro's preference for the tunnel to cross the existing Great Northern Tunnel by going under it, with the agency stating that passing over would require a cut-and-cover tunnel that would disrupt City Hall Park.[79] The following month, Metro announced that it would use a fleet of 200 dual-mode buses for the first decade of tunnel operations, with an eventual switch to subway trains. The bored tunnel would be able to carry 180 buses an hour in each direction, serving either a wide island platform or two smaller side platforms that would be dug out from the surface.[80][81] In April, Metro published the draft environmental impact statement for the tunnel project, estimating a cost of $387 million (equivalent to $892 million in 2016 dollars)[65] and a completion date of June 1989.[82] The cost of the project drew criticism at public hearings for using a significant portion of Metro's capital budget, a total of $840 million from sales tax revenue approved by voters in 1980, as well as potential disruption to business during the cut-and-cover construction of the stations and Pine Street segment of the tunnel.[83][84]

UMTA ranked Metro's bus tunnel project as first among transit projects favored to receive federal funding in 1985, despite its reliance on unproven dual-mode buses. Metro tested a prototype Renault PER 180 dual-mode trolleybus in 1983, describing it as problematic after finding it exceeded freeway axle load limits by 2 short tons (1.8 t) and having to replace several parts after several mechanical failures.[85] Congress later appropriated $20 million to the City of Seattle for the bus tunnel project in October 1984, allowing for right-of-way acquisition to begin,[86] but the funds were withheld until restrictions on new transit projects were lifted by the United States Senate the following May.[87]

The Downtown Transit Project subcommittee unanimously approved Metro recommendations that would reduce the number of bus tunnel stations from six to five, saving $35 million, as well as opting for tunnel boring machines for the 3rd Avenue segment to minimize surface-level disruptions that would be present from cut-and-cover excavation.[88] Stations would be located at Union Station south of Jackson Street, under 3rd Avenue and James Street, under 3rd Avenue and University Street, at the Westlake Mall and at 9th Avenue and Pine Street near the Washington State Convention Center.[89] The Metro Council approved the station sites and use of tunnel-boring machines in July 1985, proceeding with final design by approving a $25.9 million contract with Parsons Brinckerhoff for engineering work related to the project.[90][91]

In March 1986, the federal government offered Metro a contract committing $195 million in UMTA funding toward the bus tunnel, requiring that a decision on whether to move forward with the project be made by December 31.[92] A month later, the King County Council asked Metro to consider delaying construction of the bus tunnel while waiting for assurance on federal funding being able to cover half of the $395 million cost of the project; the council was scheduled to begin awarding contracts for utility relocation along 3rd Avenue and Pine Street in preparation for tunnel construction.[93] On May 15, the Reagan administration signed a contract with Metro to commit $197 million of the $395 million required for the bus tunnel project, assuming re-authorization of a mass transit grant program by Congress, while also extending the deadline for a final decision to September 1987.[94] Hours later, the Metro Council awarded the first construction contract for utility relocation, with construction set to begin in July.[95] The Metro Council accepted the UMTA contract during their June 5 meeting, allowing for bidding on tunnel construction to begin.[96] The tunnel construction contract was awarded to the joint venture of Guy F. Atkinson Construction and Dillingham Construction in late September for $44.16 million, beating seven competing bids with an estimate far lower than the approximately $61 million predicted by Metro engineers.[97][98] The contract for the dual-mode trolleybuses was awarded by the Metro Council to Breda Costruzioni Ferroviarie in October, consisting of an order for 236 buses at a cost of $133 million (equivalent to $291 million in 2016 dollars);[65][99] it was approved by UMTA in November.[100]

Construction

A white bus with raised poles stopped at the curb of an underground station. The granite-tiled floors reflect bright lanterns placed above the platform, adjacent to an upper level walkway.
A dual-mode bus at Westlake station in 1990, operating as an electric trolleybus while in the tunnel.

Construction on the bus tunnel project began with partial closures of 3rd Avenue in July 1986 for utility relocation, narrowing traffic to one lane in either direction and restricting traffic to buses and emergency vehicles during rush hour.[101] To prepare for extended periods of service disruption on 3rd Avenue, Metro Transit also moved its electric trolleybus routes onto 1st Avenue.[102]

Excavation of the 3rd Avenue tunnel segment began with the ceremonial launch of the "Mighty Mole", a 140-short-ton (130 t), 129-foot-long (39 m) tunnel boring machine (TBM), on March 6, 1987.[10][103] The TBM, designed by Robbins Company of Kent, Washington, and built by Nicholson Manufacturing in Seattle, began digging the western tunnel from Union Station the following May.[104] A second, identical "Mighty Mole" TBM began digging the parallel eastern tunnel on June 29.[105] During tunnel boring under 3rd Avenue between Spring Street and Madison Street on October 21, a small earthflow damaged a water main and caused pavement on 3rd Avenue to drop 8 inches (20 cm), shutting down water in the nearby Seattle City Light and 1001 Fourth Avenue Plaza buildings.[106] While repairing the broken water main, electricians working on damaged high-voltage cables caused a small power outage that affected eight downtown buildings on the night of October 28, but were able to restore power by the following morning.[107] Work on the western tunnel was briefly interrupted in November, when the TBM hit an unexpectedly large pocket of loose sand under Madison Street that had to be stabilized with grout to prevent damage to the adjacent Seattle City Light building.[108] Boring on both tunnels was stopped in early January 1988, when a pocket of wet sand was encountered 300 feet (91 m) before the planned 90-degree turn onto Pine Street.[109] Metro and tunnel contractors Atkinson/Dillingham, who had scheduled tunnel excavation for completion in mid-January, closed 3rd Avenue between Pike and Pine streets and installed 40 drilled wells to remove water from the sand pocket in February.[110] Digging resumed on the western tunnel on March 14,[111] and the TBM reached Westlake station on April 9, completing the first of the two tunnels.[112] The eastern tunnel was completed a month later on May 18, allowing for parts of the TBMs to be salvaged and the steel outer shells to be buried in the tunnel.[113]

The Pine Street segment of the tunnel was planned to be dug cut-and-cover from the surface. In preparation for utility relocation work on Pine Street, Metro moved 36 bus routes serving the corridor to other east–west streets in February 1987.[114] On April 27, excavation of the tunnel began with the closure of Pine Street, and its offramp to I-5, to automobile traffic between 3rd Avenue and Boren Avenue.[115] Workers finished digging in late August, allowing the project to progress to concrete pouring for the roadway.[116] Pine Street was briefly re-opened for the Christmas shopping season beginning November 1 at the request of downtown merchants, with a temporary surface laid over backfill for automobiles and pedestrians.[117] On January 4, the street was closed to automobile traffic once again, along with the intersection of 5th Avenue and Pine Street and the Pike Street offramp of I-5, to install utility lines and a permanent roadway.[118] Pine Street was fully reopened to traffic on November 1, 1988, coinciding with the completion of Westlake Park and Westlake Center, a year ahead of schedule.[119]

By October 1988, Metro reported that 53% of major construction was complete and anticipated that the tunnel would be completed in May 1990 and opened for service in September 1990.[120] Mayor Norm Rice and Seattle City Council members Paul Kraabel and George Benson recommended a limited opening of the tunnel for the 1990 Goodwill Games to be held in July,[121] but Metro rejected the proposal in order to adequately test the safety systems of the tunnel before service began.[122] Testing in the bus tunnel began with a ceremonial first run on March 15, 1989, first with a diesel bus and then one of the Breda dual-mode trolleybuses[123] operating in diesel mode, as the overhead trolley wires had not yet been installed.[124] Wooden planks and steel plates covered slots in the concrete roadway where rails would be installed later.[123][124] Local media were given a tour the next day.[124] By January 1990, the tunnel stations were declared "nearly complete", with only minor work left to complete.[125] Murals and other interactive art installations were placed in the nearly complete stations from December 1989 onward, as part of a $1.5 million arts program.[126] Tunnel construction was declared complete on June 7, 1990, leaving Metro to test safety systems and train personnel for regular service to begin in September.[127]

The initial cost of the tunnel project was estimated in 1984 to be $334.6 million, but the final costs rose 56% over budget to a total of $468.7 million (equivalent to $859 million in 2016 dollars);[65][128][129] the project's cost overruns were blamed on unanticipated soil conditions on the approach to Pine Street from 3rd Avenue, complaints and payouts to downtown businesses disrupted by tunnel construction, and the death of an electrician during construction.[10] Excavated dirt from the project was used as fill for runway expansion at Paine Field in nearby Everett.[130]

South African granite scandal

A minor scandal involving the bus tunnel project emerged in late 1988, over the discovery that granite to be used by Metro in the tunnel's stations had been sourced from South Africa. The Verde Fontaine granite was quarried in South Africa, which had been under Apartheid rule at the time, but was cut and finished in Italy, allowing for it to be approved despite the Metro Council's ongoing boycott of South African goods.[131][132] The Verde Fontaine granite was selected for use as benches and interior walls in Westlake and Pioneer Square stations by architecture firm TRA; Metro was unaware that Verde Fontaine was only quarried in South Africa. The granite's origin was discovered by an activist from the Black Contractors Coalition in late 1988, who notified Metro and members of the Metro Council. Metro determined that replacing the 24,000 square feet (2,200 m2) of granite would cost $500,000 and delay both stations, but would not affect the overall budget or anticipated beginning of service in 1990.[133]

Metro Director Alan Gibbs confirmed that the granite was quarried in South Africa during a press conference on January 25, 1989, while preparing an investigative report for the Metro Council Transit Committee scheduled for February 2.[134] The announcement was met with calls from King County Councilman Ron Sims to fire the responsible Metro officials who knowingly allowed the purchase.[135] Metro's ban on South African goods was stricter than the federal sanctions, which only prohibited importation of specific materials such as steel, coal, uranium and agricultural products, and was used by the Urban Mass Transportation Administration to threaten to pull its funding for the bus tunnel project.[136]

A report by the Metro Council Rules Committee delivered in March stated that the granite's origin was discovered in the spring of 1988, and was authorized by tunnel superintendent David Kalberer with the assumption that only a small amount would be used to furnish University Street station.[137] Kalberer, who received praise for his work on the project before the scandal, admitted that the failure to consult the Metro Council's tunnel subcommittee before signing off on the deal was his mistake.[138] Metro Director Alan Gibbs resigned on February 23 as a result of the scandal and was succeeded by technical director Richard Sandaas in September.[139][140]

Before this discovery, in September 1987, African-American rights groups forced tunnel contractor Atkinson/Dillingham to return 36 steel beams from South Africa used for temporary shoring at Pioneer Square station. This led Metro Director Alan Gibbs to propose a ban on South African materials by Metro for its projects, which was adopted by a resolution of the Metro Council on September 17.[141][142]

Opening and bus-only operation

Regular service in the bus tunnel began on September 15, 1990, on five routes serving the University District, North Seattle, and Renton.[1][40] The limited service was the result of delays in the manufacturing of dual-mode buses from Breda, which were fully delivered in 1991.[143][144] The opening was preceded by soft openings of each individual station, beginning with Westlake station in August 1989, and ending with Convention Place station the day before the beginning of service.[145][146] A ceremonial walk and run was held on September 9, 1990, and attracted 5,000 participants.[147][148]

In its first year of operations, the bus tunnel carried 28,000 daily passengers on 688 scheduled bus trips. The tunnel reduced the number of buses operated on 3rd Avenue at peak hours from 190 to 86, with 20 Metro routes using the tunnel.[149] The Seattle Times called it a "qualified success", commenting that the tunnel was like a "mini-subway system". The paper's editorial board also requested that Metro expand tunnel hours to keep buses running for late-night workers and entertainment events held on weekends.[150] On December 9, 1991, the SODO Busway opened, extending bus service from the tunnel into SODO and moving southbound routes off Interstate 5.[151] Direct access from Interstate 90 to the bus tunnel was opened in February 1992 as part of a reversible express lane system for the new floating bridge.[152]

Renovation for light rail

A parking lot filled with buses, seen from above. A station with several blue-roofed platforms can be seen towards the bottom, with lanes for buses and tracks for trains.
Aerial view of Convention Place station, the northern terminus of the tunnel and the only station not served by Link light rail trains

The bus tunnel was originally intended to be converted for use by light rail trains at some point in the future.[153] Metro approved the addition of tracks to the bus tunnel in 1988, appropriating half of the $5 million used to install them during construction, the remainder coming from federal sources.[154][155] To save $1.5 million in costs, Metro eliminated most of the rail's electrical insulation, a move that would later make them unusable for rail service.[156]

A regional transit authority was formed in the early 1990s to build and operate a light rail system that would use the bus tunnel within Downtown Seattle. The authority, later named Sound Transit, gained voter approval in November 1996 to build a $3.9 billion system between Seattle–Tacoma International Airport, Downtown Seattle, and the University District.[157] In 1998, Sound Transit found that the rails in the tunnel would need to be replaced at a cost of up to $110 million and require a full closure for two years. The plan would also require the purchase of new hybrid electric buses to replace the Breda fleet, as the electrical systems were incompatible. Convention Place station would have to be abandoned as it was too shallow to support a northern extension under Interstate 5.[158][159]

Sound Transit approved its route for the light rail project, named Central Link, in November 1999, including four of the five stations in the downtown transit tunnel (excluding Convention Place).[160] King County Executive Ron Sims proposed transferring ownership of the tunnel, along with $130 million in debt and liabilities for maintenance and operations, from King County Metro to Sound Transit in 2004.[161] The two agencies signed an agreement in May 2000 that formally transferred ownership and responsibility for the tunnel to Sound Transit, in exchange for $195.6 million paid to King County Metro. Metro would retain ownership of Convention Place station and other assets, while Sound Transit would convert the tunnel to rail operation after 2004.[162][163]

Sound Transit underwent a funding crisis in 2001 after the Central Link light rail project was found to be over budget and would not be able to open until 2009, three years later than planned.[164] The light rail project was truncated to Westlake station in Downtown Seattle and to Tukwila, with the sections north of downtown and south to the airport deferred to a later date.[165] The King County Council called for a new agreement to be negotiated with Sound Transit adding requirements for an adopted plan for light rail service to Northgate, and for a study into new riders that light rail would bring to the tunnel over a conventional bus network.[166] In early 2002, Sound Transit also explored, and ultimately rejected, a proposal to build a parallel, rail-only tunnel under 5th Avenue that would cost $1 billion.[167]

Sound Transit and the King County Council signed a new joint-operations agreement in June 2002, leaving King County Metro as owners of the tunnel while Sound Transit would pay for part of the tunnel's debt service at an estimated cost of $65 million. The agreement would allow for buses and light rail trains to share the tunnel and its stations beginning in 2009, after a two-year closure for renovations.[168][169] A separate agreement signed in May 2003 selected King County Metro as the operator of the light rail line.[170]

Metro began testing a fleet of new hybrid diesel-electric buses in 2002, intending to use them in the bus tunnel before and after the conversion to joint bus-rail operations.[171] The first few of a planned fleet of 235 hybrid diesel-electric articulated buses began operating on tunnel bus routes in June 2004.[172] The Breda dual-mode trolleybuses were removed from the tunnel in January 2005 and would later be refurbished into electric-only trolleybuses for use on the city's trolleybus network.[49] The last day of trolleybus operation in the tunnel was January 24, 2005, with only a single dual-mode bus in service on the final day.[173][174]

In February 2004, Sound Transit announced that it would begin the closure and renovation of the bus tunnel in September 2005, two years earlier than scheduled, to save money and reduce construction delays.[175] Construction of a stub tunnel under Pine Street near Convention Place station, to be used for light rail train storage and turnback, as well as a future extension to Capitol Hill, began in January 2005.[176] The bus tunnel was closed on September 24, 2005, moving the tunnel's 21 routes and 140 buses per hour to surface streets.[177] 3rd Avenue was converted to a "transit-priority corridor" during peak periods, restricting general traffic to one-block travel.[178]

The $82.7 million construction contract for the transit tunnel renovation was awarded to Balfour Beatty in August 2004, 12 percent below Sound Transit's estimates.[179][180] The majority of the cost was paid by Sound Transit and supplemented by $8.1 million from King County Metro.[177] As part of the renovations, the tunnel's roadway was lowered by eight inches (20 cm) to allow for level boarding, required by the Americans with Disabilities Act; as a result, Metro added strobe lights to bus mirrors, which were lowered to head height, and added warning signs. New electrical, mechanical, and emergency systems were installed, along with a new communications system connecting to a joint-operations center.[156] The project ended up costing $94 million in total, 3.4 percent over the budget set in 2004.[181] During the closure, Metro found that average travel time through downtown increased only 11 percent during the afternoon peak period, and ridership on popular routes only dropped slightly.[182]

Joint bus and train operations

The tunnel reopened to service on September 24, 2007, with tunnel routes modified to group common destinations together.[183][184] Stations were given new entrance signs, lighting fixtures, electronic passenger information signs, and restored paint.[185] The peak bus-only restrictions on 3rd Avenue remained in place after the reopening, along with the skip-stop service that Metro implemented on the street.[186] The tunnel was temporarily closed for nine days in December after a computer glitch disrupted the tunnel's new emergency-control system, which was repaired and replaced.[187]

Simulated light rail testing in the tunnel began on May 20, 2009, with two-car trains operating alongside in-service buses, making it the first joint bus and rail tunnel with stations in the United States.[188] Service on the Central Link light rail line began on July 18, 2009, operating from Westlake station in the tunnel to Tukwila International Boulevard station near the airport.[189][190] Light rail service was extended north from Westlake to University of Washington station (via Capitol Hill station) on March 19, 2016,[191] coinciding with the moving of several bus routes out of the tunnel to accommodate increased train frequencies.[192][193]

Future

In November 2015, King County Metro agreed to sell Convention Place station to the Washington State Convention Center in a $147 million deal. The convention center plans to build a new expansion on the property, necessitating the closure of the station and transit tunnel to buses earlier than planned.[194] In 2017, Sound Transit and the Seattle Department of Transportation announced that the tunnel would become rail-only in 2019,[195] two years sooner than the planned switch in 2021 to coincide with the opening of the Northgate Link Extension.[196]

See also

References

  1. 1 2 Crowley, Walt (October 1, 2000). "Bus service begins in downtown Seattle transit tunnel on September 15, 1990.". HistoryLink. Archived from the original on October 19, 2016. Retrieved September 30, 2014.
  2. Middleton, William D. (April 1, 2006). "Sound Transit builds for LRT: Projected growth over the next 25 years is driving the Seattle region's rapid push to expand light rail.". Railway Age. Chicago, Illinois: Simmons-Boardman Publishing: 43–45. ISSN 0033-8826. OCLC 1586268. Archived from the original on May 2, 2006. Retrieved May 27, 2017.
  3. Crowley, Walt (January 1, 2000). "Workers complete primary excavation of downtown Seattle transit tunnel on April 8, 1988.". HistoryLink. Archived from the original on October 19, 2016. Retrieved September 30, 2014.
  4. 1 2 "Link light rail schedule". Sound Transit. September 10, 2016. Archived from the original on August 9, 2015. Retrieved September 11, 2016.
  5. 1 2 "Downtown Seattle Transit Tunnel". King County Metro. Archived from the original on October 16, 2016. Retrieved September 11, 2016.
  6. Downtown Seattle Accessible Map and Transit Guide (PDF) (Map). King County Metro, Sound Transit. Archived (PDF) from the original on July 27, 2014. Retrieved September 30, 2014.
  7. Gilje, Shelby (September 27, 1990). "Looking Out For Rights Of The Disabled". The Seattle Times. Archived from the original on March 4, 2016. Retrieved April 25, 2015.
  8. "Take time to experience the art of bus riding". King County Metro. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  9. Mathieson, Karen (September 12, 1990). "Tunnel Visions – Bus Labyrinth Beneath Seattle Spawns Gallery". The Seattle Times. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  10. 1 2 3 Crowley, Walt (October 1, 2000). "Metro Transit begins excavating downtown Seattle transit tunnel on March 6, 1987.". HistoryLink. Archived from the original on October 19, 2016. Retrieved April 17, 2011.
  11. "Seattle, Washington Brief: Metro Bus Travel". TCRP Report 90: Bus Rapid Transit, Vol. 1: Case Studies in Bus Rapid Transit (PDF) (Report). Transportation Research Board. 2004. OCLC 52902995. Archived (PDF) from the original on February 2, 2017. Retrieved January 23, 2017.
  12. 1 2 Transit Tunnel: Convention Place Station (PDF) (Map). King County Metro Transit. September 2007. Archived (PDF) from the original on April 21, 2015. Retrieved September 30, 2014.
  13. "Pine Street Stub Tunnel" (PDF). Sound Transit. November 30, 2012. Archived (PDF) from the original on September 9, 2015. Retrieved September 30, 2014.
  14. 1 2 3 4 5 Downtown Seattle Transit Tunnel (PDF) (Map). King County Metro Transit. Archived (PDF) from the original on October 6, 2014. Retrieved September 30, 2014.
  15. "Metro Customer Services". King County Metro. January 1, 2013. Archived from the original on February 14, 2015. Retrieved September 30, 2014.
  16. Transit Tunnel: Westlake Station (PDF) (Map). King County Metro Transit. September 2007. Archived (PDF) from the original on February 21, 2015. Retrieved September 30, 2014.
  17. Transit Tunnel: University Street Station (PDF) (Map). King County Metro Transit. September 2007. Archived (PDF) from the original on April 12, 2015. Retrieved September 30, 2014.
  18. 1 2 Mapes, Lynda V. (December 10, 2011). "Tunnels: Seattle's boring past filled with thrills". The Seattle Times. Archived from the original on February 2, 2017. Retrieved September 30, 2014.
  19. Transit Tunnel: Pioneer Square Station (PDF) (Map). King County Metro Transit. September 2007. Archived (PDF) from the original on December 22, 2014. Retrieved September 30, 2014.
  20. Finance & Administrative Services. "Civic Square". City of Seattle. Archived from the original on March 2, 2016. Retrieved January 23, 2017.
  21. "2 towers long on ice show signs of thaw". The Seattle Times. February 9, 2013. Archived from the original on February 2, 2017. Retrieved September 30, 2014.
  22. "Pioneer Square Station-the Pioneering Spirit". King County Metro. Archived from the original on February 1, 2015. Retrieved January 2, 2015.
  23. Lane, Bob (September 14, 1987). "Mechanical Moles". The Seattle Times. p. D1. Retrieved September 30, 2014 via NewsBank. (Subscription required (help)).
  24. Seattle Department of Transportation (July 2013). "Seattle Streetcar: First Hill Line" (PDF). Seattle Streetcar. Archived (PDF) from the original on December 18, 2013. Retrieved September 30, 2014.
  25. Lindblom, Mike (July 11, 2009). "International District/Chinatown Station is switching point for many commuters". The Seattle Times. Archived from the original on February 2, 2017. Retrieved September 30, 2014.
  26. Transit Tunnel: International District/Chinatown Station (PDF) (Map). King County Metro Transit. September 2007. Archived (PDF) from the original on November 23, 2015. Retrieved September 30, 2014.
  27. 1 2 The Book: Transit Operating Handbook (PDF). King County Metro. February 2011. pp. 726–729. Retrieved July 17, 2017 via Seattle Transit Blog.
  28. I-90 Express Lanes Map (Map). Washington State Department of Transportation. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  29. "East Link Light Rail Segment A: Seattle, Mercer Island via I-90" (PDF). Sound Transit. November 2010. p. 1. Archived from the original (PDF) on October 6, 2014. Retrieved September 30, 2014.
  30. "Third Avenue Transit Corridor Improvement and RapidRide Facilities Project Description Information" (PDF). Puget Sound Regional Council. 2012. Archived (PDF) from the original on January 4, 2015. Retrieved January 3, 2015.
  31. "Technical Appendix F: Capacity Calculations". Regional Transit Long-Range Plan Draft Supplemental Environmental Impact Statement (PDF) (Technical report). Sound Transit. December 2, 2004. p. F-3. Archived from the original (PDF) on June 16, 2010. Retrieved September 30, 2014.
  32. Lindblom, Mike (December 4, 2015). "Would voters dig another transit tunnel?". The Seattle Times. Archived from the original on January 22, 2016. Retrieved December 7, 2015.
  33. "Chapter 3: Transportation Impacts and Mitigation" (PDF). North Link Final Supplemental Environmental Impact Statement (Report). Sound Transit. March 2006. Retrieved August 18, 2016.
  34. Limargo, Irin (August 1, 2012). "Operational Strategies to Prepare the Downtown Seattle Tunnel for Pay on Entry" (PDF). American Public Transportation Association. p. 6. Archived (PDF) from the original on October 6, 2014. Retrieved September 30, 2014.
  35. "Expanded Metro bus service coming; Link light rail ramps up in downtown tunnel" (Press release). King County Metro. September 16, 2015. Archived from the original on November 20, 2015. Retrieved December 7, 2015.
  36. "Metro Transit Service Change: September 10, 2016". King County Metro. March 2016. Archived from the original on September 4, 2016. Retrieved September 11, 2016.
  37. Downtown Metro Service: Frequent Routes to Help You Get Around Downtown (PDF) (Map). King County Metro. June 2014. Archived (PDF) from the original on October 6, 2014. Retrieved September 30, 2014.
  38. "Ride Free Area (discontinued Sept. 2012) Questions & Answers". King County Metro. Archived from the original on December 1, 2015. Retrieved December 7, 2015.
  39. Surface Street Bus Stops When the Downtown Seattle Transit Tunnel is Closed (PDF) (Map). King County Metro. Archived (PDF) from the original on October 7, 2014. Retrieved September 30, 2014.
  40. 1 2 "Seattle Briefly: New bus schedules effective tomorrow". The Seattle Times. September 14, 1990. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  41. Schaefer, David (May 29, 1998). "Bus-tunnel hours extended to 11 p.m. – fares to go up 15 cents a ride". The Seattle Times. p. B1. Retrieved September 30, 2014 via NewsBank. (Subscription required (help)).
  42. Gilmore, Susan (June 2, 2002). "Bumper to Bumper: The story behind the gridlock". The Seattle Times. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  43. "New trains, new bus trips bring big changes in June" (Press release). Seattle, Washington: Sound Transit. May 21, 2009. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  44. Central Link Operations Plan: Initial Segment and Airport Link (PDF) (Report). Sound Transit. July 29, 2008. pp. 26–28. Archived (PDF) from the original on September 24, 2015. Retrieved September 30, 2014.
  45. Eckhardt, Katherine, ed. (June 7, 2011). "King County Metro Transit Operations Policies and Procedures #68: Downtown Seattle Transit Tunnel and SODO Busway Operations Procedure" (PDF). Amalgamated Transit Union Local 587. Retrieved September 30, 2014.
  46. Lindblom, Mike (May 28, 2015). "State finally getting satellite-based train controls, 20 years after fatal crash". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  47. "Link Light Rail Vehicle Statistics" (PDF). Sound Transit. December 2006. Archived from the original (PDF) on October 6, 2014. Retrieved September 30, 2014.
  48. "New Flyer Articulated Low Floor Hybrid Bus". Metro Vehicles. King County Metro. Archived from the original on July 4, 2015. Retrieved August 16, 2015.
  49. 1 2 "Breda Articulated Trolley Bus". Metro Vehicles. King County Metro. Archived from the original on October 7, 2014. Retrieved September 30, 2014.
  50. "Metro to partner with New Flyer on next generation of electric trolley buses" (Press release). Seattle, Washington: King County Metro. June 17, 2013. Archived from the original on March 21, 2017. Retrieved March 27, 2015.
  51. Gutierrez, Scott (October 28, 2016). "Farewell to Metro’s Breda trolleys". King County Metro. Archived from the original on November 20, 2016. Retrieved May 31, 2017.
  52. "Downtown Seattle Transit Tunnel and Changing Bus Technology". Metro Vehicles. King County Metro. Archived from the original on October 6, 2014. Retrieved September 30, 2014.
  53. Bogue, Virgil (1911). "Appendix No. III—Proposed Rapid Transit System". Plan of Seattle: Report of the Municipal Plans Commission. Seattle, Washington: Lowman & Hanford. p. 180. OCLC 1440455. Archived from the original on August 19, 2014. Retrieved August 16, 2015 via Google Books.
  54. "Municipal Plans Embrace Great Third Avenue Improvements". The Seattle Times. November 12, 1911. p. 25.
  55. Crowley, Walt (September 17, 1972). "Virgil Bogue's plan: Seattle that might have been". The Seattle Times. pp. 8–9.
  56. "Single Tax And City Paper Are Voted Down: All Bond Issues Receive Approval of People and Voters Decide to Have a Look at Plans for Municipal Telephone System.". The Seattle Times. March 6, 1912. p. 2.
  57. Dimmock, Arthur H.; Henderson, D. W.; Reeves, Carl H. (December 16, 1920). Report on Proposed Rapid Transit System for the City of Seattle. City of Seattle. OCLC 46418921.
  58. "2008 Find of the Month Archive: 1920 rapid transit plan". Seattle Municipal Archives. June 2008. Archived from the original on September 24, 2015. Retrieved August 16, 2015.
  59. "Rapid Transit Sought; Plans Submitted to Members of City Council; Proposals for Seattle Would Cost Millions, Not Yet Officially Estimated". The Seattle Daily Times. December 21, 1920. p. 2.
  60. Trimble, William Pitt (1926). Seattle Rapid Transit Report to the City Planning Commission. Seattle Planning Commission. OCLC 14264109.
  61. Pollock, C. D.; Seattle Traffic Research Commission; Clearing House Association of Seattle (December 1928). Report of the Seattle Traffic Research Commission, 1928. Seattle Traffic Research Commission. p. 25. OCLC 11052336.
  62. Kennett, John J. (March 1, 1957). Rapid Transit on Freeway, Tacoma-Seattle-Everett. Seattle Transit. OCLC 13297486.
  63. De Leuw, Cather & Company (March 19, 1970). "Figure 7-2: Rapid Transit Average Travel Times and Assumed Headways" (Map). The Rapid Transit Plan for the Metropolitan Seattle Area: Technical Appendix. Municipality of Metropolitan Seattle. p. 7-33. OCLC 36627361 via Flickr.
  64. De Leuw, Cather & Company (February 19, 1970). "Chapter 1: Recommended Public Transportation Plan". The Rapid Transit Plan for the Metropolitan Seattle Area. Municipality of Metropolitan Seattle. p. 15. OCLC 120953.
  65. 1 2 3 4 5 6 7 Federal Reserve Bank of Minneapolis Community Development Project. "Consumer Price Index (estimate) 1800–". Federal Reserve Bank of Minneapolis. Retrieved January 2, 2017.
  66. McRoberts, Patrick (January 1, 1999). "King County voters on Forward Thrust bonds approve stadium and aquarium and nix transit on February 13, 1968.". HistoryLink. Archived from the original on October 2, 2016. Retrieved August 16, 2015.
  67. "Voters reject rail transit plan and three other Forward Thrust bond proposals on May 19, 1970.". HistoryLink. September 19, 2002. Archived from the original on October 2, 2016. Retrieved August 16, 2015.
  68. Lane, Bob (December 19, 1974). "Downtown bus tunnel, third bridge in Evans-Uhlman plan". The Seattle Times. p. A1.
  69. "Metro Transit planning firm is hired". The Seattle Times. December 22, 1974. p. A11.
  70. "Study weighs solutions to busways jam". The Seattle Times. July 25, 1975. p. A6.
  71. 1 2 Lane, Bob (July 29, 1979). "Metro takes new look at bus tunnel". The Seattle Times. p. A22.
  72. Lane, Bob (March 22, 1981). "'Light rail' system might solve transit problems, says study". The Seattle Times. p. A16.
  73. Gough, William (June 3, 1983). "Bus-tunnel proposal debated by Metro committee". The Seattle Times. p. B6.
  74. Gough, William (June 10, 1983). "Debate on tunnel vs. transit mall continues". The Seattle Times. p. B2.
  75. Gough, William (December 5, 1982). "Rapid-transit system studied for Seattle, Snohomish County". The Seattle Times. p. B31.
  76. Gough, William (October 3, 1983). "Metro chief urges a city tunnel for electric buses". The Seattle Times. p. B1.
  77. Schaefer, David (October 18, 1983). "City Council would approve electric buses in downtown tunnel". The Seattle Times. p. B1.
  78. Gough, William (November 4, 1983). "Metro Council OK's downtown transit tunnel". The Seattle Times. p. B1.
  79. Nogaki, Sylvia; Gough, William (January 14, 1984). "Metro chooses bus-station sites, hits snag over downtown tunnel". The Seattle Times. p. A8.
  80. Gough, William (January 26, 1984). "Bus tunnel, transit plan would cost $400 million". The Seattle Times. p. C1.
  81. Nogaki, Sylvia (February 18, 1984). "Metro envisions city bus subway in 5 years". The Seattle Times. p. A6.
  82. Parker, Laura (April 15, 1984). "Underground: Metro wants bus tunnel". Seattle Post Intelligencer, The Seattle Times. pp. A26–A27.
  83. Nogaki, Sylvia (April 24, 1984). "Hearing to study downtown bus tunnel". The Seattle Times. p. B1.
  84. Nogaki, Sylvia (April 26, 1984). "Metro's plan for buses draws fire". The Seattle Times. p. B1.
  85. Nogaki, Sylvia (May 18, 1984). "Metro project gets edge for federal funding". The Seattle Times. pp. A1, A12.
  86. "Seattle wins $20 million for building downtown bus tunnel". The Seattle Times. United Press International. October 12, 1984. p. B5.
  87. Anderson, Ross (May 15, 1985). "Federal funds to be freed for bus tunnel". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  88. Nogaki, Sylvia (September 13, 1984). "Panel urges boring of Metro tunnel — and 5 stations". The Seattle Times. p. B2.
  89. "Panel picks sites for tunnel stations". The Seattle Times. November 1, 1984. p. C6.
  90. "Metro OK's contract for design for bus tunnel". The Seattle Times. July 19, 1985. p. B5. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  91. Lane, Bob (August 30, 1985). "Metro driving forward with tunnel". The Seattle Times. p. B2. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  92. Lane, Bob (March 21, 1986). "Metro ironing out bus-tunnel contract". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  93. Lane, Bob (April 3, 1986). "Metro asked to study bus-tunnel delay". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  94. Pryne, Eric (May 15, 1986). "Administration gives Metro 'full-funding' contract for bus tunnel". The Seattle Times. p. A9. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  95. Lane, Bob (May 16, 1986). "Metro awards bus-tunnel contract – go-ahead given after U.S. agrees to assist". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  96. Gilmore, Susan (June 6, 1986). "$23.6 million freed for transit tunnel – 'full-funding contract' OK'd". The Seattle Times. p. B4. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  97. "Around the Sound: First contract given for Metro's bus tunnel". The Seattle Times. September 19, 1986. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  98. "Bus-tunnel bid so low that engineers gasp". The Seattle Times. September 12, 1986. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  99. Lane, Bob (October 25, 1986). "Italian company submits low bid to build 236 Metro 'tunnel buses'". The Seattle Times. p. D8. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  100. Lane, Bob (November 3, 1986). "Metro gets OK to buy Italian-made buses". The Seattle Times. p. B12. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  101. Gilje, Shelby (July 11, 1986). "Third Avenue work disrupts mail". The Seattle Times. p. E5. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  102. Updike, Robin (January 27, 1987). "Downtown merchants move, add promotion tax in their efforts to survive city's new construction". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  103. Lane, Bob (March 2, 1987). "'Mighty Mole' is a giant pest – Metro Tunnel is headache for merchants". The Seattle Times. p. B1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  104. Lane, Bob (May 15, 1987). "Big 'Mole' to gnaw through downtown – exotic white machine displayed, christened". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  105. Lane, Bob (June 26, 1987). "'Mole' is burrowing bus tunnel – 140-ton 'creature' digging its way under downtown". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  106. Blater, Joni (October 21, 1987). "Water taps run dry on Third Avenue". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  107. "Seattle Briefly: Power restored to 8 downtown buildings". The Seattle Times. October 27, 1987. p. D1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  108. Lane, Bob (November 6, 1987). "Loose sand delays work on bus tunnel". The Seattle Times. p. B2. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  109. Lane, Bob (January 20, 1988). "Ice Age sand trap halts machine age bus-tunnel project". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  110. Lane, Bob (January 23, 1988). "Extraction of water may delay bus tunnel digging 6–8 weeks". The Seattle Times. p. A8. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  111. Lott, Jimi (March 14, 1988). "Looking over the down under". The Seattle Times. p. B1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  112. "One bus-tunnel tube excavated". The Seattle Times. April 9, 1988. p. C16. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  113. Lane, Bob (May 18, 1988). "Light at the end of Metro's tunnel – breakthrough day downtown for Seattle's Mighty Mole". The Seattle Times. p. D1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  114. Lane, Bob (February 3, 1987). "Big dig will close Pine St. to buses". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  115. Lane, Bob (April 25, 1987). "Pine Street in downtown area to be off limits to most traffic – tunnel construction forces closure for at least a year". The Seattle Times. p. A8. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  116. Lane, Bob (August 25, 1987). "Pouring begins: Thick concrete for tunnel beneath Pine Street". The Seattle Times. p. C3. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  117. Lane, Bob (November 2, 1987). "Pine St. reopens – for the shoppers". The Seattle Times. p. B3. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  118. Lane, Bob (December 31, 1987). "Jackhammers will take over Pine Street again". The Seattle Times. p. E3. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  119. "Northwest Briefly: Ramp, Street opening to help speed traffic". The Seattle Times. November 1, 1988. p. B2. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  120. Lane, Bob (October 8, 1988). "Tunnel job going out of sight – 'Sidewalk superintendents' losing view". The Seattle Times. p. A1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  121. Lane, Bob (January 21, 1990). "Safety officials oppose opening tunnel for games". The Seattle Times. Archived from the original on March 4, 2016. Retrieved August 16, 2015.
  122. "Games here too soon for tunnel, says staff". The Seattle Times. February 15, 1990. Archived from the original on March 4, 2016. Retrieved August 16, 2015.
  123. 1 2 Lane, Bob (March 16, 1989). "First run: Buses roll through the tunnel". The Seattle Times. p. A1 via NewsBank. (Subscription required (help)).
  124. 1 2 3 Bailey, Gil (March 17, 1989). "Fasten your seat belts ... Metro bus takes the press on a bumpy ride through the tunnel". Seattle Post-Intelligencer. p. B3 via NewsBank. (Subscription required (help)).
  125. "End is near for work on city's bus tunnel". The Seattle Times. January 2, 1990. Archived from the original on March 4, 2016. Retrieved August 16, 2015.
  126. Lane, Bob (December 21, 1989). "Art Tunnel: Metro installs murals, fancy fixtures to make bus stations a visual treat". The Seattle Times. p. C1. Retrieved August 16, 2015 via NewsBank. (Subscription required (help)).
  127. Lane, Bob (June 7, 1990). "Deafening silence: Bus tunnel's done". The Seattle Times. Archived from the original on March 3, 2016. Retrieved August 16, 2015.
  128. Office of Planning and Environment (September 2007). "Appendix 1: Project Profiles". Contractor Performance Assessment Report (PDF) (Report). Federal Transit Administration. p. 156. Archived from the original (PDF) on March 4, 2016. Retrieved August 16, 2015.
  129. Gutierrez, Scott (October 17, 2009). "Report: Other Seattle-area tunnels have been over-budget". Seattle Post-Intelligencer. Archived from the original on June 12, 2015. Retrieved August 16, 2015.
  130. Bergsman, Jerry (March 22, 1989). "Here's inside dirt on dealings between Metro and Paine Field". The Seattle Times. p. H2.
  131. Crowley, Walt (January 1, 2000). "Metro Director Alan Gibbs resigns on February 23, 1989, in scandal over use of South African granite in bus tunnel.". HistoryLink. Archived from the original on October 19, 2016. Retrieved July 20, 2016.
  132. Williams, David B. (2000). The Seattle Street-Smart Naturalist: Field Notes from the City. Westwinds Press. ISBN 9781558688599. OCLC 277040822. Retrieved July 15, 2017 via Google Books.
  133. Lane, Bob; Pryne, Eric (January 6, 1989). "South African stone blocks bus tunnel – Metro rejection means $500,000 increase in cost, delay in completing two stations". The Seattle Times. p. B1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  134. Lane, Bob (January 25, 1989). "S. African granite flap: Metro's story – Gibbs concedes error in buying stone but says public wasn't misled". The Seattle Times. p. B2. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  135. Pryne, Eric (January 27, 1989). "Firings sought over purchase from S. Africa – Sims demands Metro tell who OK'd using the granite in new bus tunnel". The Seattle Times. p. E1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  136. Pryne, Eric (February 7, 1989). "Agency may force Metro to keep granite – No decision made yet on S. African stone". The Seattle Times. p. B1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  137. Lane, Bob (March 10, 1989). "Report to Metro finds no cover-up on granite – Committee tries to heal wounds over South African stone in tunnel". The Seattle Times. p. C1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  138. Lane, Bob (February 26, 1989). "The man who OK'd S. African granite – Kalberer got high marks for bus tunnel project before ugly episode". The Seattle Times. p. D1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  139. Pryne, Eric; Lane, Bob (February 23, 1989). "Metro chief Gibbs resigns – S. African granite dispute is cause". The Seattle Times. p. A1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  140. Lane, Bob (September 8, 1989). "Sandaas named to head Metro". The Seattle Times. p. C4. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  141. Lane, Bob (September 4, 1987). "Metro bans South African steel from bus-tunnel project – complaints from officials, black groups". The Seattle Times. p. B2. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  142. Pryne, Eric (February 2, 1989). "Metro staff put loophole into ban – Council unaware of flaw in action on South Africa". The Seattle Times. p. C1. Retrieved July 20, 2016 via NewsBank. (Subscription required (help)).
  143. Winfield, Phyllis (September 16, 1990). "It's tunnel time: Bus riders check it out". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 22, 2017.
  144. Lane, Bob (September 11, 1990). "The Metro Mission: Easy riders". The Seattle Times. p. A4.
  145. Lane, Bob (August 12, 1989). "Tunnel station opens to raves". The Seattle Times. p. A11. Retrieved January 22, 2017 via NewsBank. (Subscription required (help)).
  146. Macdonald, Patrick (September 14, 1990). "Bochinche goes underground for Metro bus tunnel". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 22, 2017.
  147. Smith, Craig (August 31, 1990). "Runners with tunnel vision can check out Metro route". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 22, 2017.
  148. Gillman, Joel (September 10, 1990). "After 411-miler, runner wins short one in tunnel". The Seattle Times. Archived from the original on February 2, 2017.
  149. Lane, Bob (September 16, 1991). "Bus tunnel rolls into second year–despite problems, downtown project is proving to be an underground hit". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 22, 2017.
  150. Seattle Times editorial board (September 17, 1991). "Happy anniversary: Tunnel can work harder". The Seattle Times. p. A10.
  151. Lane, Bob (December 7, 1991). "New busway to help south end commuters". The Seattle Times. Archived from the original on November 28, 2016. Retrieved January 22, 2017.
  152. Johnston, Steve (February 17, 1992). "Reversible car-pool lane debuts on I-90". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 22, 2017.
  153. Lane, Bob (March 18, 1988). "Metro staff to advocate rails in tunnel". The Seattle Times. p. E3. Retrieved January 23, 2017 via NewsBank. (Subscription required (help)).
  154. Lane, Bob (April 22, 1988). "Metro makes tracks for tracks for future". The Seattle Times. p. B1. Retrieved January 23, 2017 via NewsBank. (Subscription required (help)).
  155. Pryne, Eric (May 25, 1988). "Panel OK's $1 million for bus-tunnel rails". The Seattle Times. p. D2. Retrieved January 23, 2017 via NewsBank. (Subscription required (help)).
  156. 1 2 Pryne, Eric (October 13, 2005). "Bus-tunnel error years ago is costly in shutdown today". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  157. Schaefer, David (November 6, 1996). "Voters back transit plan on fourth try". The Seattle Times. p. A1. Archived from the original on March 3, 2016. Retrieved January 23, 2017.
  158. Varner, Lynne K. (September 25, 1998). "Plan to convert tunnel for trains wins support". The Seattle Times. p. B3. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  159. Schaefer, David (September 29, 1998). "Light-rail chief says new track in tunnel won't break budget". The Seattle Times. p. B1.
  160. Fryer, Alex (November 19, 1999). "A milestone for light rail: regional board selects station sites, alignment". The Seattle Times. p. A1. Archived from the original on December 22, 2015. Retrieved January 23, 2017.
  161. "Sims' light in the tunnel". The Seattle Times. November 11, 1999. p. B6.
  162. Garber, Andrew (April 26, 2000). "Sound Transit set to acquire bus tunnel". The Seattle Times. p. B1.
  163. "Transfer of tunnel to Sound Transit approved". The Seattle Times. May 23, 2000. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  164. "Light-rail cost soars $1 billion". The Seattle Times. December 13, 2000. p. A1. Archived from the original on January 14, 2016. Retrieved January 23, 2017.
  165. Pryne, Eric (November 30, 2001). "Sound Transit adopts 14-mile route; light-rail construction could start in summer". The Seattle Times. p. A1. Archived from the original on January 6, 2017. Retrieved January 23, 2017.
  166. Pryne, Eric (September 25, 2001). "Bus-tunnel transfer to face a new curve". The Seattle Times. p. B3.
  167. Pryne, Eric (May 16, 2002). "Separate transit tunnel could cost $1 billion". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  168. Pryne, Eric (June 25, 2002). "Sound Transit, county agree to bus-tunnel plan". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  169. Pryne, Eric (May 12, 2002). "The bus tunnel tug-of-war". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  170. "Sound Transit reaches proposed agreement for Metro to operate Central Link light rail" (Press release). Sound Transit. May 12, 2003. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  171. Lindblom, Mike (February 2, 2003). "Metro impressed by hybrid buses". The Seattle Times. p. B1.
  172. Lindblom, Mike (May 28, 2004). "Metro to roll out hybrid buses June 5". The Seattle Times. p. B3. Archived from the original on July 21, 2016. Retrieved January 23, 2017.
  173. "Trolleynews [regular news section]". Trolleybus Magazine. Vol. 41 no. 261. UK: National Trolleybus Association. May–June 2005. p. 72. ISSN 0266-7452. OCLC 62554332.
  174. "Retried – Breda 5000 dual mode bus". King County Metro. Retrieved July 15, 2017.
  175. Pryne, Eric (February 13, 2004). "Downtown bus tunnel to close in '05, ahead of plan". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  176. Pryne, Eric (January 6, 2005). "Digging is 1st sign light rail coming to town". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  177. 1 2 "Whats, whys of $82.7 million tunnel project". The Seattle Times. September 23, 2005. p. A15. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  178. Gilmore, Susan (September 23, 2005). "Bus tunnel shuts down tonight for 2 years". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  179. "Sound Transit Motion No. M2004-78" (PDF). Sound Transit. August 12, 2004. Archived (PDF) from the original on February 2, 2017. Retrieved January 23, 2017.
  180. Pryne, Eric (June 26, 2004). "Sound Transit bid comes in 12% lower than estimate". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  181. Gilmore, Susan; Lindblom, Mike (September 18, 2007). "Seattle gets a glimpse of its transit future". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  182. Gilmore, Susan (March 11, 2006). "Metro delays shorter than feared". The Seattle Times. p. B1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  183. Gilmore, Susan (September 24, 2007). "Reopening of downtown Seattle bus tunnel goes smoothly". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  184. Brown, Charles E. (September 17, 2007). "Bumper to Bumper: Tunnel outcasts want in". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  185. "What's new in the tunnel?". SeattleTunnel.org. Archived from the original on December 17, 2007. Retrieved January 23, 2017.
  186. Gilmore, Susan (July 28, 2007). "Third Ave. to keep its rush-hour restrictions". The Seattle Times. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  187. "Local Digest: Bus service resumes in downtown tunnel". The Seattle Times. December 27, 2007. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  188. Lindblom, Mike (May 21, 2009). "Tunnel two-step: It may take buses longer to clear shared tunnel". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  189. "Link light rail launches new era of mobility for central Puget Sound" (Press release). Seattle, Washington: Sound Transit. July 18, 2009. Archived from the original on March 3, 2016. Retrieved January 23, 2017.
  190. Lindblom, Mike (July 20, 2009). "Light-rail trains run smoothly, if not to capacity, on first day". The Seattle Times. Archived from the original on November 28, 2016. Retrieved January 23, 2017.
  191. Beekman, Daniel (March 19, 2016). "Capitol Hill, UW light-rail stations open to big crowds". The Seattle Times. Archived from the original on January 1, 2017. Retrieved January 23, 2017.
  192. "Linked up: Transit agencies working together on bus changes as Link expands to Husky Stadium" (Press release). Seattle, Washington: King County Metro. March 6, 2015. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  193. "Metro Transit Service Change: March 26, 2016". King County Metro. March 2016. Archived from the original on February 2, 2017. Retrieved January 23, 2017.
  194. Bhatt, Sanjay (November 18, 2015). "King County Metro, convention center reach $147M deal on site's sale". The Seattle Times. p. B1. Archived from the original on February 22, 2017. Retrieved January 23, 2017.
  195. Lindblom, Mike (June 25, 2017). "Reprieve for tunnel riders, but cascading projects to multiply Seattle's traffic woes". The Seattle Times. p. B1. Archived from the original on June 25, 2017. Retrieved June 26, 2017.
  196. Lindblom, Mike (September 16, 2015). "Light-rail trains to run every 6 minutes between Seattle and Sea-Tac". The Seattle Times. Archived from the original on October 11, 2016. Retrieved January 23, 2017.