Michigan Central Railway Tunnel

Michigan Central Railway Tunnel

Postcard picture, early 1900s
Overview
Location Detroit River
Coordinates 42°19′07″N 83°03′38″W / 42.31849°N 83.06049°W / 42.31849; -83.06049Coordinates: 42°19′07″N 83°03′38″W / 42.31849°N 83.06049°W / 42.31849; -83.06049
System Canadian Pacific Railway
Start Detroit, Michigan, US
End Windsor, Ontario, Canada
Operation
Work begun October 1906
Opened July 26, 1910 (1910-07-26)
Owner Canadian Pacific Railway and Borealis Transportation
Operator Detroit River Tunnel Company
Traffic Freight
Technical
Length 1.6 mi (2.6 km)
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Michigan Central Railway Tunnel is a railroad tunnel under the Detroit River connecting Detroit, Michigan, in the United States with Windsor, Ontario, in Canada. The US entrance is south of Porter and Vermont streets near Rosa Parks Boulevard. The Canadian entrance is south of Wyandotte Street West between Cameron and Wellington Avenues. It was built by the Detroit River Tunnel Company for the Canada Southern Railway, leased by the Michigan Central Railroad and owned by the New York Central Railroad. The tunnel opened in 1910 and is still in use today by the Canadian Pacific Railway. On the Detroit side, the area around the tunnel is off limits to the general public and is routinely patrolled by officers and agents of the US Department of Homeland Security, Canadian Pacific Police Service, CN Police, Detroit Police Department, and the security elements of the bridge company.

History

Postcard, early 1900s
Postcard, 1911

Prior to the construction of the tunnel, the Canada Southern Railway had several connections to Michigan at its west end, all train ferries. The northern one ran across the St. Clair River, connecting to the St. Clair and Western Railroad. The southern connection crossed the Detroit River south of Detroit, connecting to the Canada Southern Bridge Company at Grosse Ile. Additionally a branch (usually considered the main line) split from the line to Grosse Ile at Essex, running to the Detroit River at Windsor.

In 1891 the Grand Trunk Railway opened the St. Clair Tunnel at Port Huron, giving it an advantage over the Canada Southern and its car ferries. The Detroit River Tunnel Company was formed August 15, 1905 as a merger of the Michigan and Canada Bridge and Tunnel Company (in Michigan) and the Canada and Michigan Bridge and Tunnel Company (in Ontario). Construction began in October 1906 under the engineering supervision of The New York Central Railway's engineering vice president, William J. Wilgus. The Michigan Central Railway Tunnel opened for passenger service July 26, 1910. Freight service began September 15 and on October 16 all traffic began running via the tunnel, ending the use of a train car ferry. From opening it was operated by the Michigan Central Railroad under lease of December 19, 1906. It was the first immersed tube tunnel to carry traffic.

On the east (Canadian) side, the tunnel connected to the line that had served a train ferry at Windsor. On the west (U.S.) side, the tunnel connected to the Michigan Central Railroad main line west of downtown (later abandoned east of the junction), and the Michigan Central Station was built west of the junction, opening in 1913.

In 1968 the tunnel passed from the New York Central Railroad to Penn Central, and in 1976 to Conrail. In 1985, Conrail sold the tunnel to the Canadian National Railway and Canadian Pacific Railway, with each getting a half share.[1] In early 2000 CN agreed to sell its stake to Borealis Transportation Infrastructure Trust (a venture of the Ontario Municipal Employees Retirement System) and use only the St. Clair Tunnel.[2] CP and Borealis vested the tunnel into the new Detroit River Tunnel Partnership, and plans were announced to construct a new railway tunnel and convert the existing railway tunnel to a two-lane free flow truckway for transport trucks to alleviate pressure at the other nearby international border crossings (Ambassador Bridge, Detroit-Windsor Tunnel, and the Detroit-Windsor Truck Ferry).[3] In June 2009, CP announced the sale part of its interest in the Partnership, so that now Borealis holds 83.5% and CP holds 16.5%.[4]

In 2010, The Windsor Port Authority, Borealis Infrastructure, and Canadian Pacific announced plans to construct a new rail tunnel compatible with double stacked trains. The initiative is known as the Continental Rail Gateway. The project was scrapped in 2015, upon the approval of the proposed Gordie Howe International Bridge.[5]

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.