Chaoshan Railway Station
Location |
Chao'an District, Chaozhou, Guangdong China | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Operated by |
Guangzhou Railway (Group) Corp., China Railway Corporation | ||||||||||
Line(s) | Xiashen Railway | ||||||||||
History | |||||||||||
Opened | 28 December 2013 | ||||||||||
Services | |||||||||||
|
Chaoshan Railway Station (Chinese: 潮汕站) is a railway station located in Shaxi Town (沙溪镇) in the Chao'an District of Chaozhou City, Guangdong Province, China, on the Xiashen Railway operated by the Guangzhou Railway (Group) Corp., China Railway Corporation.
Structure
The station serves Shantou, Jieyang and Chaozhou, and is located in the geometric centre of these cities, approximately 20 to 30 kilometres (12 to 19 mi) from each.
The station is divided into two, with a north and south station house, which can accommodate a total of 2000 passengers, covering an area of 10,000 square metres (110,000 sq ft).[1]
Service
As of January 2014, Chaoshan station is a major station on the Xiamen-Shenzhen Railway, and is a terminus station for the G-series Guangzhou-Chaoshan route, starting at Guangzhou South Railway Station.[2] The station also operates D-series trains, with destinations including Shenzhen, Xiamen, Hangzhou and Shanghai.[3] It is expected that there will be connections to Hong Kong and Meizhou.[4][5]
The table below takes effect since 14 April 2017 (meanwhile regarding some occasional minor changes later on), and will partially fall into disuse since 1 July 2017.
Ownership of trains | Origin | Terminus | Trains Numbers (Those in italics do not operate daily) | Train Types |
---|---|---|---|---|
D7401 D7403 D7405 D7407 D7409 | CRH1A-A | |||
D7402 D7404 D7406 D7408 D7410 | CRH1A-A | |||
D7411 D7415 D7417 D7421 D7423 D7425 | CRH1A | |||
D7414 D7416 D7418 D7422 D7424 D7426 | CRH1A | |||
G6303/6302 G6307/6306 G6311/6310 G6315/6314 G6319/6318 G6323/6322 G6327/6326 G6331/6330 G6343/6342 G6347/6346 | CRH380B | |||
G6301/6304 G6305/6308 G6309/6312 G6313/6316 G6317/6320 G6321/6324 G6325/6328 G6329/6332 G6345/6348 G6341/6344 | CRH380B | |||
D7507/7506 D7523/7522 D7527/7526 | CRH1A | |||
D7521/7524 D7525/7528 D7529/7532 | CRH1A | |||
D7503/7502 D7511/7510 D7515/7514 D7519/7518 | CRH1A-A | |||
D7501/7504 D7509/7512 D7513/7516 D7517/7520 | CRH1A-A | |||
G6339/6338/6339 | CRH380B | |||
G6340/6337/6340 | CRH380B | |||
D7413 | CRH1A | |||
D7412 | CRH1A | |||
D7531/7530 | CRH1A | |||
D7505/7508 | CRH1A | |||
D2319 | CRH1A | |||
D2318 | CRH1A | |||
D683 D685 D2317 D2333 D2335 D2337 | CRH1A | |||
D682 D684 D2316 D2334 D2336 D2338 | CRH1A | |||
D2315 | CRH1A | |||
D2320 | CRH1A | |||
D681 | CRH1A | |||
D686 | CRH1A | |||
D2307 D2309 | CRH1A | |||
D2308 D2310 | CRH1A | |||
D2293 | CRH1A | |||
D2294 | CRH1A | |||
D2329 | CRH2A | |||
D2332 | CRH1A | |||
D673 D2305 | CRH1A | |||
D674 D2302 | CRH1A | |||
D2313 | CRH2A | |||
D2314 | CRH2A | |||
D2351 | CRH1A | |||
D2354 | CRH1A | |||
D2355 | CRH2A | |||
D2356 | CRH2A | |||
D2357 | CRH2A | |||
D2358 | CRH2A | |||
D671 D2295 D2303 D2311 D2323 D2327 D3337 D3339 D3333 D3335 | CRH1A | |||
D672 D2298 D2306 D2324 D2328 D3338 D3340 D3334 D3336 | CRH1A | |||
D2297 | CRH1A | |||
D2296 | CRH1A | |||
D2301 | CRH1A-A | |||
D2326 | CRH1A-A | |||
D2331 | CRH1A | |||
D2330 | CRH2A | |||
D2353 | CRH2A | |||
D2352 | CRH2A | |||
D2325 | CRH1A-A | |||
D2304 | CRH1A-A | |||
D2321 | CRH2A | |||
D2322 | CRH2A | |||
D2347 | CRH1E | |||
D2348 | CRH1E | |||
D2343 | CRH1E | |||
D2344 | CRH1E | |||
D3111 | CRH1B | |||
D3112 | CRH1B | |||
G1601 | CRH380B | |||
G1602 | CRH380B | |||
D908 (overnight train) | CRH1E | |||
D2283 D2285 D2287 D3107 | CRH2A | |||
D2284 D2286 D2288 D3108 | CRH2A | |||
D2281 D3125 | CRH2B | |||
D2282 D3126 | CRH2B | |||
D959 D2341 D2345 D2349 | CRH2E | |||
D960 D2342 D2346 D2350 | CRH2E | |||
History
The station began operations on 28 December 2013.
Gallary
- Information board of Train D2312, the only non-overnight train that passes Chaoshan Railway Station.
- Information board of Train D7425, operating on weekends (incl. Friday) and peak periods.
- Train G6313/6316, a CRH380B staffed by Guangzhou Railway (Group) Corp., Ltd.
- G6327/6326 (left) and D3112 (right) meeting at Chaoshan Railway Station (Platforms 1 & 2).
- Train D7405, a CRH1A staffed by Guangzhou Railway (Group) Corp., Ltd. (now changed to CRH1A-A).
- D7404 having arrived at Chaoshan, its terminus, with the trainset about to run D7405 back to Shenzhen North.
- Info board of CRH1A-A-1174 (staffed by Guangzhou Railway (Group) Corp., Ltd.) which was about to run D7405.
References
Wikimedia Commons has media related to Chaoshan Railway Station. |
- ↑ "潮汕站区路规划 厦深铁路首个南北双向候车站" [Chaoshan area planning Xiamen-Shenzhen Railway Station]. Fang.com (in Chinese). 24 December 2014. Archived from the original on 28 December 2013.
- ↑ Yangcheng Evening News (26 December 2014). "厦深铁路28日开通运营 广州南坐动车可直达潮汕" [Xiamen-Shenzhen Railway on the 28th opening and operation of the Guangzhou South take the motor car can reach Chaozhou]. ycwb.com (in Chinese).
- ↑ "厦深首发动车为深圳至上海" [Xiashen first launch vehicle for Shenzhen to Shanghai]. sina.com.cn (in Chinese). 26 December 2013.
- ↑ MTR. "Connections to Mainland". MTR Express Rail Link.
- ↑ http://en.meizhou.gov.cn/government/meizhou_news/t20140522_976.htm
Coordinates: 23°32′35″N 116°35′08″E / 23.54306°N 116.58556°E