Cantonment MRT Station
Not to be confused with the Tanjong Pagar Railway Station, which is the former raliway station.
CC31 Cantonment 广东民 கெண்டோன்மண்ட் Cantonment | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Operated by | SMRT Trains (SMRT Corporation) (Circle Line) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Taxi | ||||||||||
Construction | |||||||||||
Structure type | Underground/Surface | ||||||||||
Platform levels | 2 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | CC31 | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Cantonment MRT Station (CC31) is a future Mass Rapid Transit station on the Circle Line in Bukit Merah planning area, Singapore. The station was announced as part of Stage 6 of the Circle Line in 2015 and slated to be completed in 2025. It will be located within the compound of the former Tanjong Pagar Railway Station.
History
This station was first announced on 29 October 2015.[1] It derives its name from the nearby Cantonment Road.
Cantonment station will be built in the vicinity of the Tanjong Pagar Railway Station, with its design inspired by the old train station.
The heritage building, which has been designated as a National Monument, will not be affected, the Land Transport Authority said. However, parts of the former railway station's platform will need to be removed for the new underground Cantonment station.
The former railways and platforms could also be used as terminating platforms. If so, the terminating platforms would be the only part of the Circle Line that is not underground.
The Land Transport Authority (LTA) has since decided to dismantle the old platforms and then reinstate it after construction of the station is completed.[2]
Station Layout
L1 | Street Level | Spottiswoode Park Estate, Cantonment Towers, Tanjong Pagar Distripark, Tanjong Pagar Railway Station |
B1 | Concourse | Faregates, Ticketing Machines, Station Control, Transitlink Counter |
B2 | Platform A | Circle Line (future service) anticlockwise ↺ via CC32 Prince Edward → |
Island platform, doors will open on the right | ||
Platform B | Circle Line (future service) clockwise ↻ via CC30 Keppel ← |
Exits
- A: Spottiswoode Park Estate
- B: Cantonment Towers
- C: Tanjong Pagar Distripark
- D: Tanjong Pagar Railway Station
References
- ↑ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Circle Line 6 - Becoming A Full Circle". Land Transport Authority. 29 October 2015.
- ↑ "With final 3 stations, Circle Line will come 'full circle' by 2025". Channel NewsAsia. 2015-10-29. Retrieved 2016-09-15.