Canton Junction (MBTA station)
CANTON JUNCTION | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Canton Junction station in April 2016 | ||||||||||||||||
Location |
Beaumont Street at Sherman Street Canton, Massachusetts | |||||||||||||||
Coordinates | 42°09′46″N 71°09′13″W / 42.1628°N 71.1537°WCoordinates: 42°09′46″N 71°09′13″W / 42.1628°N 71.1537°W | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms |
2 side platforms 1 island platform | |||||||||||||||
Tracks |
2 (Northeast Corridor) 2 (Stoughton Branch) | |||||||||||||||
Construction | ||||||||||||||||
Parking |
764 spaces ($4.00 fee) 11 accessible spaces | |||||||||||||||
Disabled access | Yes | |||||||||||||||
Other information | ||||||||||||||||
Fare zone | 3 | |||||||||||||||
History | ||||||||||||||||
Opened | 1892 | |||||||||||||||
Previous names | Canton | |||||||||||||||
Traffic | ||||||||||||||||
Passengers (2013) | 1,008 (daily inbound average)[1] | |||||||||||||||
Services | ||||||||||||||||
|
Canton Junction is a commuter rail station on the MBTA Commuter Rail Providence/Stoughton Line, located slightly north of the Canton Viaduct and west of downtown Canton, Massachusetts.
At Canton Junction, the Stoughton Branch of the Providence/Stoughton Line splits from the Northeast Corridor and runs southeast to Stoughton, Massachusetts. The Providence section of the line follows the Northeast Corridor south to Providence, Rhode Island and beyond.
History
Canton Junction opened with the Boston and Providence Railroad in 1835; the Stoughton Branch Railroad opened in early 1845. The current station building was designed by Bradford Lee Gilbert in the Richardsonian Romanesque style and built by the Old Colony Railroad in 1892. It became part of the New York, New Haven and Hartford Railroad a year later in 1893.[2]
The massive footbridge, built around 2000, showed significant rust and damage to concrete by 2015.[3] Keolis (the commuter rail contract operator) begin major repairs on the footbridge in 2016; however, the company failed to obtain the proper building permits. Construction was suspended in March 2017 with the western ramp and stairs still closed; passengers had to detour on foot over the Spaulding Street bridge to access the Providence-bound platform and the Jackson Street parking lot.[4][5] Construction resumed in July 2017, with completion expected in August.[6]
References
- ↑ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ↑ Existing Railroad Stations in Norfolk County, Massachusetts
- ↑ Turner, Jay (August 7, 2015). "Frustrations mount over conditions at Canton Junction". Canton Citizen. Retrieved March 25, 2017.
- ↑ "Commuter Rail Service Alerts: Providence/Stoughton Line". Massachusetts Bay Transportation Authority. March 18, 2017. Archived from the original on March 25, 2017.
- ↑ "Canton Junction Ramp". Town of Canton. June 10, 2017. Archived from the original on June 10, 2017.
- ↑ "Commuter Rail Service Alerts: Providence/Stoughton Line". Massachusetts Bay Transportation Authority. July 20, 2017. Archived from the original on July 22, 2017.
External links
Media related to Canton Junction (MBTA station) at Wikimedia Commons