CSS Richmond

History
Name: Richmond
Ordered: 1862
Laid down: March 1862
Launched: 6 May 1862
Commissioned: July 1862
Fate: Burned and scuttled 3 April 1865
General characteristics
Length: 172 ft 6 in (52.58 m)
Beam: 34 ft (10 m)
Draft: 12 ft (3.7 m)
Propulsion: Steam engine
Speed: 5 to 6 knots
Complement: 150 officers and men
Armament: 4 rifled guns, 2 shell guns, 1 spar torpedo

CSS Richmond, an ironclad ram, was built at Gosport (Norfolk) Navy Yard to the design of John L. Porter with money and scrap iron collected by the citizens of Virginia, whose imagination had been captured by the ironclad CSS Virginia. Consequently, she was sometimes referred to as Virginia II, Virginia No. 2 or Young Virginia in the South and as Merrimack No. 2, New Merrimack or Young Merrimack by Union writers, months before the actual CSS Virginia II was ever laid down.

Begun in March 1862, Richmond was launched May 6 and towed up to the Confederate capital that very night to escape Federal forces again in possession of Norfolk Navy Yard and the lower James River. Richmond was thus finished at Richmond, Virginia in July 1862 and placed in commission by Commander Robert B. Pegram, CSN as part of the James River Squadron. Twenty-two inches of yellow pine and oak plus 4 inches of iron on her casemate protected her roof, and "she is ironed 3½ feet below her load lines," wrote Shipyard Superintendent John H. Burroughs.

During 1863 and early 1864 the James front was quiet, but from May 1864 momentous events followed in quick succession. The Confederate Navy had three new ironclads in Captain French Forrest's squadron there, and minor actions were frequent.

During 1864 Richmond, under Lieutenant William Harwar Parker, CSN, took part in engagements at Dutch Gap on August 13, Fort Harrison on September 29 – October 1, and Chaffin's Bluff on October 22. On January 23–24, 1865, she was under heavy fire while aground with Virginia II above the obstructions at Trent's Reach — at an angle that caused Federal projectiles to ricochet harmlessly off their casemates. But Richmond's unarmored tender, CSS Scorpion, being lashed alongside Richmond, was severely damaged by the explosion of CSS Drewry's magazine. The ironclads were forced to withdrew under the Confederate batteries at Chaffin's Bluff. A few weeks later, however, Richmond had to be destroyed to avoid capture by order of Rear Admiral Raphael Semmes, CSN squadron commander, prior to the evacuation of the Confederate capital on April 3.

Commanders

The commanders of the CSS Richmond were:[1]

Notes

  1. Coski (1996), John M. Capital Navy: The Men, Ships and Operations of the James River Squadron, Campbell, CA: Savas Woodbury Publishers. ISBN 1-882810-03-1.

References

Coordinates: 37°25′24″N 77°24′8″W / 37.42333°N 77.40222°W / 37.42333; -77.40222

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.