Brampton Gateway Terminal

Brampton Gateway Terminal
Location 501 Main Street South, Brampton, Ontario
Canada
Coordinates 43°39′57″N 79°44′01″W / 43.66583°N 79.73361°W / 43.66583; -79.73361Coordinates: 43°39′57″N 79°44′01″W / 43.66583°N 79.73361°W / 43.66583; -79.73361
Owned by City of Brampton
Bus stands 17
Bus operators Brampton Transit & Züm
MiWay
Construction
Structure type Terminal building with an enclosed waiting area
Bicycle facilities bike rack/shelter
Disabled access Yes
History
Opened November 26, 2012 (2012-11-26)

Brampton Gateway Terminal is a Brampton Transit bus station serving the south-central and western areas of Brampton, Ontario. It is located on the north-west corner of Steeles Avenue and Main Street adjoining the Shoppers World Brampton shopping centre. The terminal opened on 26 November 2012 to replace the Shoppers World Terminal on the south-west side of the shopping centre.

History

In 2009, the manager of Land Use Policy recommended that, with the addition of Acceleride (later Züm) and a proposed Hurontario-Main Street LRT, there was a "demonstrated need" to move the terminal to the corner of Hurontario and Steeles. Such a move would allow less diversion time from the route to the station, and for a larger station.[1]

As a stop on the potential LRT, the terminal is considered part of the Hurontario Higher Order Transit corridor.[2] Expropriations were made to allow for the terminal to be moved;[3] this stands in contrast to the previous location which was leased from Shoppers World Brampton.[4] As of spring 2010, the terminal redesign and relocation was scheduled to coincide with the Zum Main Street launch in fall 2011;[5] it was listed as a 2011 service initiative in the agency's 2011 Current and Capital Budget.[6]

Contract 2011-095, for the construction of the new terminal, its amenities, plus road and intersection improvements was awarded to Graham Construction and Engineering. The lowest tender, the contract was worth $10,190,340.[7] Earlier estimates presumed an $8.3 million cost. A City report placed the "higher actual costs" on a limited construction time-line and tendering the contract during the summer.[8]

The terminal is on the proposed light rail corridor along Main and Hurontario, from the Brampton Downtown Terminal (including the Brampton GO Station) to Port Credit GO Station, passing the Cooksville GO Station.[9]

Routes

This terminal has 15 bus bays with several of them being on the streets.[10]

Legend
2 Regular Service
103 Miway
104 Express Service
502 Züm
Route Direction Destination Destination Bay
2 Main NB Downtown Brampton Terminal Heart Lake Terminal 9
SB Hurontario and 407 GO Park and Ride 14
3 McLaughlin NB Heart Lake Terminal 6
3A Flower City Community Campus Heart Lake Terminal
4/4A Chinguacousy NB Sheridan College Mount Pleasant GO Station 3
8 Centre EB Bramalea Terminal 12
11 Steeles WB Sheridan College Lisgar GO Station 1
EB Bramalea GO Station Humber College 7
11A
51 Hereford WB Sheridan College Hereford Street 1
52/52A McMurchy NB Downtown Brampton Terminal Peel Memorial Hospital 11
SB Ray Lawson Boulevard Brampton Gateway Terminal 13
53 Ray Lawson WB Sheridan College James Potter Road 2
57 Charolais NB Flower City Community Campus Major William Sharpe Drive
103 Hurontario Express SB Port Credit GO Station 15
104 Chinguacousy Express NB Sheridan College Mount Pleasant GO Station TBD
199 UTM Express SB University of Toronto at Mississauga 5
502 Züm Main NB Downtown Brampton Terminal Sandalwood Loop 10
SB Mississauga City Centre Transit Terminal 15
511 Züm Steeles WB Sheridan College Lisgar GO Station 1
EB Bramalea GO Station Humber College 8
511A
Drop-off Area 4

† In service starting in September, 2017