Boardman River

Boardman River

Boardman River between downtown Traverse City and Grand Traverse Bay
Basin features
Main source Union Township, Grand Traverse County, Michigan
1,090 ft (330 m)
44°40′31″N 85°23′45″W / 44.67528°N 85.39589°W / 44.67528; -85.39589[1]
River mouth Grand Traverse Bay, Lake Michigan
580 ft (180 m)
44°45′55″N 85°36′46″W / 44.76527°N 85.61285°W / 44.76527; -85.61285Coordinates: 44°45′55″N 85°36′46″W / 44.76527°N 85.61285°W / 44.76527; -85.61285
Basin size 295 sq mi (760 km2)
Physical characteristics
Length 28 mi (45 km)

The Boardman River is a 28.2-mile-long (45.4 km)[2] river that flows into the west arm of Grand Traverse Bay in Traverse City, Michigan. The Boardman's upper tributaries rise near Kalkaska, Michigan, and its watershed drains an area of 295 square miles (760 km2) through 130 miles (210 km) of river and tributaries. The Boardman River is considered one of the top ten trout streams in Michigan.[3] Before entering the Grand Traverse Bay, it becomes Boardman Lake, a natural lake that was originally 259 acres (1.05 km2) in size and increased to 339 acres (1.37 km2) after the Union Street Dam was constructed in 1867.

After flowing through Boardman Lake, the river descends through downtown Traverse City, following a hairpin-shaped course to Grand Traverse Bay. This Traverse City section of the Boardman River is accessible by motorboat from the lakeshore up to a weir upstream from the lakeshore. A short distance upstream from the weir is the Union Street Dam, a small decommissioned mill dam located between Cass and Union Streets.

The other three dams on the river are being removed: Sabin, Boardman and Brown Bridge.[4] On October 6, 2012, a temporary structure put in place to facilitate drawdown at Brown Bridge Dam was breached, flooding the river valley.[5] In June 2014 the Michigan DEQ issued a report identifying erosion around the temporary drawdown structure as the likely cause of the failure.[6]

Brown Bridge Dam removal was completed in January 2013 and resulted in the reestablishment of 2.5 miles of river channel.[7] Revegetation and restoration work in the project area is ongoing. In preparation for the removal of the Boardman and Sabin Dams, both spillways have been opened and the impoundments have been drawn down as low as permitted by the permanent structures in place today. Deconstruction and removal of the Boardman Dam is scheduled to be complete by October, 2017. Plans for the removal of the Sabin Dam are pending.

In March 2016, Grand Traverse County Road Commission Officials announced the closure of the One-Lane Cass Road Bridge near Keystone Road in Southern Garfield Township. This would lead to the demolition and reconstruction of a new modern-style bridge arch-bridge over the channel between Keystone and Sabin ponds. On March 28, the bridge closed for good, creating a detour along South Airport, U.S. 31, and Beitner Roads to Keystone Road.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.