Bandar Utama MRT station
SBK09 BK1 Bandar Utama | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
MRT and LRT station | |||||||||||
Platform 2 of the Bandar Utama station towards Sungai Buloh. | |||||||||||
Other names |
بندر اوتام (Jawi alphabet) 万达镇 (Chinese) பந்தர் உத்தாமாவில் (Tamil) | ||||||||||
Location |
Bandar Utama, Selangor Malaysia | ||||||||||
Coordinates | 3°8′47.92″N 101°37′7.49″E / 3.1466444°N 101.6187472°ECoordinates: 3°8′47.92″N 101°37′7.49″E / 3.1466444°N 101.6187472°E | ||||||||||
Owned by | MRT Corp | ||||||||||
Line(s) | 11 Bandar Utama-Klang Line (Under construction) | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | Future integrative station with BK1 . | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available with payment. 500 total parking bays. | ||||||||||
Other information | |||||||||||
Station code | SBK09 BK1 | ||||||||||
History | |||||||||||
Opened | SBK09 16 December 2016 | ||||||||||
Opening | BK1 Opening 2020 | ||||||||||
Services | |||||||||||
|
The Bandar Utama station is a mass rapid transit (MRT) station serving the suburb of Bandar Utama in Selangor, Malaysia. It is one of the stations on the Klang Valley Mass Rapid Transit (KVMRT) Sungai Buloh-Kajang Line which was opened on 16 December 2016 under Phase One operations of the line.[1]
This station will serve as an interchange station to the proposed LRT 3 line (tentatively named the Bandar Utama-Klang Line) which links Bandar Utama to Johan Setia in Klang. The station is located adjacent to Sri Pentas (the headquarters of Media Prima/TV3) and will in future be connected to the 1 Utama shopping centre.
Station Layout
The station is located beside the Damansara-Puchong Expressway directly behind the Sri Pentas Building in Bandar Utama. The station's support columns are located between the expressway and the water channel which runs parallel to the expressway.
The station adopts the standard elevated station design for the MRT Sungai Buloh-Kajang Line with two side platforms above the concourse level. However, unlike the other elevated stations, there are no escalators, lifts or staircases linking the station directly with the ground level. Neither are there any lay-bys for buses, taxis and cars at the ground level directly below the station. Commuters need to go via neighbouring buildings in order to access the station.
Access
Access to the station is via two pedestrian link bridges connecting the two entrances of the station with neighbouring buildings, namely the 1 Powerhouse Building and the 1 Utama Shopping Centre. The link from Entrance A to the second level of the 1 Powerhouse Building was opened on 16 December 2016 together with the start of Phase One operations of the MRT Sungai Buloh-Kajang Line but the link bridge from Entrance B to 1Utama Shopping Complex is still under construction as at 1 July 2017.
MRT passengers using the MRT feeder bus services also have to access the station via the 1 Powerhouse Building as the feeder bus stop is located at the ground level of the building. Taxi and private vehicle drop-off areas are also located here.
The 1 Powerhouse Building also houses the park and ride facility for the station and occupied two basement levels of the building.
Station layout
L2 | Platform Level | |
Platform 1 Sungai Buloh–Kajang Line 9 towards Kajang SBK35 (→) | ||
Platform 2 Sungai Buloh–Kajang Line 9 towards Sungai Buloh SBK1 (←) | ||
L1 | Concourse | Faregates to Paid Area, Escalators to Platforms, Ticketing Machines, Customer Service Office, Station Control, Shops, Entrance A to pedestrian link bridge to 1 Powerhouse Building, Entrance B (not operational) future link bridge to 1Utama Shopping Complex, Emergency staircase to ground level from back-of-house. |
G | Ground Level | Emergency services parking bays. |
Bus Services
Feeder buses
With the opening of the MRT Sungai Buloh-Kajang Line, feeder buses also began operating linking the residential areas in Taman Tun Dr Ismail, Bandar Utama and Kampung Sungai Penchala. The feeder buses operate from the station's feeder bus stop at the adjacent 1 Powerhouse building accessed via Entrance A of the station.
Route No. | Origin | Desitination | Via |
---|---|---|---|
T811 | SBK09 Bandar Utama station | Kampung Sungai Kayu Ara Bandar Utama BU12 |
Persiaran Bandar Utama Lebuh Bandar Utama Persiaran Tropicana Jalan Tropicana Selatan Jalan Masjid, Kampung Sungai Kayu Ara |
T812 | SBK09 Bandar Utama station | Taman Tun Dr Ismail Kampung Sungai Penchala |
Persiaran Bandar Utama Dataran Bandar Utama Lebuh Bandar Utama Jalan Burhanuddin Helmi Jalan Datuk Sulaiman Jalan Sungai Penchala Damansara-Puchong Expressway |
Other buses
Route No. | Origin | Desitination | Via |
---|---|---|---|
RapidKL 802 | KJ24 Kelana Jaya LRT | Kota Damansara | Damansara-Puchong Expressway Persiaran Bandar Utama SBK09 Lebuh Bandar Utama Persiaran Surian Jalan Camar |
Gallery
- View of the station from the MRT tracks over the Damansara-Puchong Expressway.
- Evening view of an MRT train crossing the Damansara-Puchong Expressway.
- The station is located near the 1Utama Shopping Complex.
- An electronic board at the entrance of the station.
- The pedestrian link bridge connecting the station with 1Utama Shopping Complex being constructed as at the end of June 2017.
External links
References
- ↑ "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Klang Valley MRT Project. Mass Rapid Transit Corporation Sdn Bhd. Retrieved 1 April 2017.