Ayrılık Çeşmesi railway station

AYRILIK ÇEŞMESİ
TCDD commuter rail station
Coordinates 41°00′01″N 29°01′49″E / 41.0003°N 29.0302°E / 41.0003; 29.0302Coordinates: 41°00′01″N 29°01′49″E / 41.0003°N 29.0302°E / 41.0003; 29.0302
Owned by Turkish State Railways
Line(s) Marmaray
Platforms 1 island platform
Tracks 2
Connections M4, İETT bus
Construction
Structure type At-grade
Disabled access Yes
History
Opened 29 October 2013
Electrified 25 kV AC
Traffic
Passengers (2017) 45,155 Average daily ridership

Ayrılık Çeşmesi is a railway station along the newly built trans-Bosphorus Marmaray tunnel. The station is located right outside the Asian portal of the tunnel and is the current eastern terminus of the line. The Turkish State Railways (TCDD) operates trains from Ayrılık Çeşmesi to Kazlıçeşme within 6- to 10-minute intervals. Connection to the M4 station of the Istanbul Metro is available.

Ayrılık Çeşmesi saw 1.2 million boardings in February 2017, making it the second busiest station on the Marmaray line. The station made up 26% of all passenger boardings of 2014.[1]

Layout

Track 1 Marmaray toward Kazlıçeşme
Island platform
Track 2 Marmaray toward Kazlıçeşme

Equipment

The railway station features following equipment:[2]

Services

Preceding station   Turkish State Railways   Following station
MarmarayTerminus

References

  1. Marmaray yolcu istatistiği - marmaray.gov.tr
  2. "Ayrılık Çeşmesi" (in Turkish). Marmaray. Retrieved 2014-12-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.