Avtovo CHP-15

Avtovo TEC-15
Location of Avtovo CHP-15
Country Russia
Location Saint Petersburg
Coordinates 59°52′12.31″N 30°17′12.78″E / 59.8700861°N 30.2868833°E / 59.8700861; 30.2868833Coordinates: 59°52′12.31″N 30°17′12.78″E / 59.8700861°N 30.2868833°E / 59.8700861; 30.2868833
Status Operational
Owner(s) TGC-1
Thermal power station
Primary fuel Natural gas
Secondary fuel Fuel oil (backup fuel)
Type Gas turbine
Cooling source Air-cooled condenser
Power generation
Units operational 7
Make and model Power Machines
Nameplate capacity 321 MW (Electric)
1,833 MW (Warm)
Annual output 1,471.5 GWh (Electric),
3,682,320 Gcal (Warm)
All data is taken from an official site of station[1]

Avtovo CHP-15 provides electric and thermal energy to the Admiralteisky, Moskovsky, Kirovsky and Krasnoselsky Districts of St. Petersburg.

The director of station is Alexander Sidorov.[1]

History

It began operation on December 26, 1956.[1]

Initially the station used coal, but towards the end of the 20th century TGC-1 began converting to gas. In connection with development of a gas powered station, physical deterioration and equipment obsolescence, reconstruction began in 2000 at the station.[1]

On August 23, 2009 there was a fire in the repaired unit.[3]

References

  1. 1 2 3 4 5 Автовская теплоэлектроцентраль (ТЭЦ-15) [Avtovo TEC-15]. Generating capacities of TGC-1 (in Russian). TGC-1. Retrieved 2009-08-24. External link in |publisher= (help)
  2. 1 2 Мощности ТГК-1 выросли на 12% за год [Capacities TGC-1 have grown on 12 % for a year] (in Russian). dp.ru. 2008-02-13. Retrieved 2009-08-24. External link in |publisher= (help)
  3. В Петербурге горела ТЭЦ. Пострадал пожарный [Fire in Petersburg thermal power station] (in Russian). fontanka.ru. 2009-08-24. Retrieved 2009-08-24. External link in |publisher= (help)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.