Vikrant-class aircraft carrier

INS Vikrant under construction.
Class overview
Name: Vikrant-class aircraft carrier
Builders: Cochin Shipyard Limited
Operators:

Indian Navy

Preceded by: INS Vikramaditya
In commission: Expected 2018 (INS Vikrant)[1]
Building: 1
Planned: 2[2][3][4]
General characteristics
Type: Aircraft carrier
Displacement:
  • INS Vikrant: 40,000 tonnes
  • INS Vishal: 65,000 tonnes[5]
Length: 262 metres (860 ft)
Beam: 62 metres (203 ft)
Draught: 8.4 metres (28 ft)
Depth: 25.6 metres (84 ft)
Decks: 2.5 acres (110,000 sq ft; 10,000 m2)
Propulsion:
Speed: 28 kn (52 km/h)
Range: 8,000 nmi (15,000 km)[6]
Complement: 1,400 (incl air crew)
Sensors and
processing systems:
Electronic warfare
& decoys:
C/D band early air-warning radar[6]
Armament:
Aircraft carried:

The Vikrant class (formerly Project 71 Air Defence Ship (ADS) or Indigenous Aircraft Carrier (IAC)) is a class of aircraft carrier being built for the Indian Navy. The class represents the largest warships and the first aircraft carriers to be designed and built in India. The lead ship of the class is also the first aircraft carrier designed and built in Asia featuring STOBAR and ski-jumps, and the first built to operate jet-powered aircraft.

Preparations for building the lead vessel of the class, INS Vikrant, started in 2008, and the keel was laid in February 2009. The carrier was floated out of its dry dock on 29 December 2011,[9] and launched on 12 August 2013.[10] The scale and complexity of the project caused problems which delayed the commencement and timeline of construction for the carrier. Technical difficulties, the cost of refitting the Russian-built carrier INS Vikramaditya, and billions in cost overruns[11] have delayed plans for the first of the vessels to enter service, with completion now planned for 2023.[12]

Background

A schematic representation of INS Vikrant.

In 1989 India announced a plan to replace its ageing British-built aircraft carriers, Vikrant and Viraat, with two new 28,000 ton Air Defence Ships (ADS) that would operate the BAe Sea Harrier aircraft. The first vessel was to replace Vikrant, which was set to decommission in early 1997. Construction of the ADS was to start at the Cochin Shipyard (CSL) in 1993 after the Indian Naval Design Organisation had translated this design study into a production model. Following the 1991 economic crisis, the plans for construction of the vessels were put on hold indefinitely.

In 1999, then Defence Minister George Fernandes revived the project and sanctioned the construction of the Project 71 ADS.[13] By that time, given the ageing Sea Harrier fleet, the letter of intent called for a carrier that would carry more modern jet fighters. In 2001, CSL released a graphic illustration showing the 32,000-ton STOBAR (Short Take-Off But Arrested Recovery) design with a pronounced ski jump.[14] The aircraft carrier project finally received formal government approval in January 2003. By then, design updates called for a 37,500 ton carrier to operate the MiG-29K. India opted for a three-carrier fleet consisting of one carrier battle group stationed on each seaboard, and a third carrier held in reserve, in order to continuously protect both its flanks, to protect economic interests and mercantile traffic, and to provide humanitarian platforms in times of disasters, since a carrier can provide a self-generating supply of fresh water, medical assistance or engineering expertise to populations in need for assistance.[15]

In August 2006, then Chief of the Naval Staff, Admiral Arun Prakash stated that the designation for the vessel had been changed from Air Defence Ship (ADS) to Indigenous Aircraft Carrier (IAC). The euphemistic ADS had been adopted in planning stages to ward off concerns about a naval build-up. Final revisions to the design increased the displacement of the carriers from 37,500 tons to over 40,000 tons. The length of the ship also increased from 252 metres (827 ft) to over 260 metres (850 ft).[16]

Design and description

INS Vikrant

The first ship of the class, Vikrant, displaces about 40,000 metric tons (39,000 long tons), is 262 metres (860 ft) long and has a tailored air group of up to thirty aircraft. The IAC-I features a STOBAR[17] (Short Take-Off But Arrested Recovery) configuration with a ski-jump. The deck is designed to enable aircraft such as the MiG-29K to operate from the carrier. It will deploy up to 30 fixed-wing aircraft,[18] primarily the Mikoyan MiG-29K, besides carrying 10 Kamov Ka-31 or Westland Sea King helicopters. The Ka-31 will fulfill the airborne early warning (AEW) role and the Sea King will provide anti-submarine warfare (ASW) capability.[19][20]

INS Vikrant during its launch in August 2013

The carrier is powered by four General Electric LM2500 gas turbines on two shafts, generating over 80MW of power. The gearboxes for the carriers were designed and supplied by Elecon Engineering.[9][21] [22]

Carrier air group

Naval variant of Tejas taking-off during test-flight from a shore-based ski-jump facility at INS Hansa, Goa

India considered a number of aircraft for operation from its INS Vikramaditya and the planned indigenous aircraft carrier. India evaluated the Russian Sukhoi Su-33, but chose the lighter Mikoyan MiG-29K as Vikramaditya was smaller and lacked an aircraft catapult.[23] On 18 January 2010, it was reported that India and Russia were close to signing a deal for 29 MiG-29K fighters to operate from IAC-I.[24] In addition, the navy signed a deal for six naval-variants of the HAL Tejas.[25] In June 2012, Flight Global reported that the Indian Navy was considering the use of Rafale M (Naval variant) on these carriers.[26]Hindustan Aeronautics have indicated that a Carrier based version of the HAL AMCA will be included in INS Vishal.[27]DRDO AURA might also be developed to meet the Navy's need.

In December 2016, the navy announced that the HAL Tejas is overweight for carrier operations, and other alternatives will be looked at.[28][29]

The Navy has indicated it prefers the Electromagnetic Aircraft Launch System (EMALS) on its second carrier Vishal.[30] INS Vishal may feature EMALS for operating larger fighter aircraft and UCAVs, and carry heavier airborne early-warning (AEW) system and aerial refuelers.[31]

Construction

INS Vikrant during its undocking in June 2015

Amongst the first construction problems experienced was the lack of supply of carrier-grade steel due to the inability of Russia to supply the AB/A grade steel. Finally, the Defence Metallurgical Research Laboratory (DMRL) worked with the Steel Authority of India Limited (SAIL) to create suitable production facilities for the steel in India.[9][19] The SAIL Steel Plants of the Steel at Bhilai, Rourkela, Durgapur and Bokaro manufactured 26,000 tonnes of three special steels being used for the hull, flight deck and floor compartments of the carrier.[32]

The keel for Vikrant was laid by Defence Minister A.K. Antony at the Cochin Shipyard on 28 February 2009.[33][34] The ship uses modular construction, with 874 blocks joined together for the hull. By the time the keel was laid, 423 blocks weighing over 8,000 tonnes had been completed.[35] The construction plan called for the carrier to be launched in 2010, when it would displace some 20,000 tonnes, as a larger displacement could not be accommodated in the building bay. It was planned that after about a year’s development in the refit dock, the carrier would be launched when all the major components, including underwater systems, would be in place. Outfitting would then be carried out after launch. As per the Cabinet Committee on Security (CCS), sea trials were initially planned to commence in 2013, with the ship to be commissioned in 2014.[36][37]

In March 2011, it was reported that the project had been affected by the delay in delivery of the huge main gearboxes for the carrier. The supplier, Elecon Engineering, had to work around a number of technical complexities due to the length of the propulsion shafts.[38] Other issues resulting in delays included an accident with a diesel generator and an issue with its alignment.[39] In August 2011, the defence ministry reported to the Lok Sabha that 75% of the construction work for the hull of the lead carrier had been completed and the carrier would be first launched in December 2011, following which further works would be completed until commissioning.[40][41] On 29 December 2011, the completed hull of the carrier was first floated out of its dry dock at CSL, with its displacement at over 14,000 tonnes.[21] Interior works and fittings on the hull would be carried out until the second half of 2012, when it would again be dry-docked for integration with its propulsion and power generation systems.[6][9]

In July 2012, The Times of India reported that construction of Vikrant has been delayed by 3 years, and the ship would be ready for commissioning by 2017. Then again in November 2012, NDTV reported that cost of the aircraft carrier had increased and the delivery has been delayed by at least five years and is expected to be with the Indian Navy only after 2018 as against the scheduled date of delivery of 2014.[42] Work has begun for next stage which includes installation of the integrated propulsion system. Italian defence company Avio is installing the integrated platform management system (IPMS).[43][44]

In July 2016, the Comptroller & Auditor General (CAG) published a 2014 project plan, supplied by the Cochin Shipyard, that shows an expected completion date in 2023, though the Navy hopes to partially commission the ship before this date.[12] Production of the HAL Tejas has also been rescheduled, with Chief Air Chief Marshal Arup Raha indicating only 20 IAF MK1 aircraft are now to be delivered by the end of 2018, 80 MK1a delivered between 2021 and 2027, with the MK2 naval variant entering production some time later[45][46] In December 2016, the navy announced that the HAL Tejas is overweight for carrier operations, and other alternatives will be considered.[28]

Vikrant's launch

In July 2013, Defence Minister A K Antony announced that Vikrant would be launched on 12 August at the Cochin Shipyard. After its launch, Vikrant would be re-docked for completion of rest of the work including the flight deck. According to Vice Admiral Robin Dhowan, about 83% of the fabrication work and 75% of the construction work has been completed. He said that 90% of the body work of the aircraft carrier had been designed and made in India, about 50% of the propulsion system, and about 30% of the fighting capability of the carrier was Indian. He also said that the ship will be equipped with a long range missile system with multi-function radar and a close-in weapon system (CIWS). The ship was launched by Elizabeth Antony, wife of Defence Minister A K Antony on 12 August 2013. Sea trials are expected to begin in 2019[47] with commissioning expected in 2020 [47]

Ships of the class

Name Pennant Tonnage Laid down Launched Sea trials Commissioning Details
Vikrant tbd 40,000 28 February 2009 12 August 2013[48] 2019 [47] 2020-2023[12][47] Under Construction, Conventional-powered STOBAR fleet carrier

See also

References

  1. "'Vikrant'- Navy's First Indigenous Aircraft Carrier Launched : Press Release". Indian Navy. Retrieved 2013-11-18.
  2. "'India speeds up the design of second domestic aircraft carrier".
  3. "Indian Navy seeks EMALS system for second Vikrant-class aircraft carrier".
  4. "India eyes US aircraft carrier technology as arms ties deepen".
  5. Rajat Pandit (6 July 2010). "Navy crosses fingers on LCA rollout". Times of India.
  6. 1 2 3 "India Floats out Its First Indigenous Aircraft Carrier 'INS Vikrant' From Cochin". defencenow.com.
  7. "List of Aircraft Carriers Under Construction: 2013". World Defense Review. Retrieved 17 May 2015.
  8. "Indians Discuss Future Carrier Plans". Aviation International News.
  9. 1 2 3 4 "Navy floats out first Indigenous Aircraft Carrier". The Hindu. 30 December 2011. Retrieved 31 December 2011.
  10. India launches first indigenous aircraft carrier INS Vikrant Times of India 12 August 2013
  11. "Should India Be Building Another Carrier?". Defense News.
  12. 1 2 3 Pandit, Rajat. "India without aircraft carrier for 8 months". Times of India. Retrieved 17 November 2016.
  13. "Indian Aircraft Carrier (Project-71)". Bharat Rakshak. Archived from the original on 17 February 2012.
  14. John Pike. "Air Defense Ship". Globalsecurity.org. Retrieved 1 February 2011.
  15. "India’s Future Aircraft Carrier Force and the Need for Strategic Flexibility". idsa.in.
  16. "Antony lays keel of first Indigenous Aircraft Carrier". Pib.nic.in. Retrieved 1 February 2011.
  17. "Comparison of Chinese Aircraft Carrier Liaoning and Indian INS Vikrant". The World Reporter. 25 August 2013. Retrieved 25 August 2013.
  18. "Force Projection and Modernization of Indian Navy". SP's Naval Forces. Retrieved 4 May 2014.
  19. 1 2 "Keel-laying of indigenous aircraft carrier in December". Hindu.com. 29 September 2008. Retrieved 1 February 2011.
  20. Rakesh Krishnan Simha (5 December 2012). "Vikramaditya and Liaoning - forces of the future". Russia & India Report. Retrieved 12 May 2015.
  21. 1 2 "Elecon to supply gears for India's first aircraft carrier". Business Standard. 26 December 2011. Retrieved 5 January 2012.
  22. "Vikramaditya and Liaoning - forces of the future". IndRus. Retrieved 5 August 2012.
  23. "MiG-29 Shuts Down The Su-33". 13 October 2009. Retrieved 31 December 2011.
  24. Pandit, Rajat (18 January 2010). "India, Russia to ink $1.2 bn deal for 29 more MiG-29Ks". The Times Of India.
  25. Sandeep Unnithan (2 December 2009). "First indigenous aircraft carrier to be launched next year: Navy chief: LATEST HEADLINES: India Today". Indiatoday.intoday.in. Retrieved 1 February 2011.
  26. "IAC enters trial as navy eyes Rafale". Flight magazine. Retrieved 1 August 2012.
  27. HAL AMCA (Advanced Medium Combat Aircraft) 5th Generation Fighter Concept (2025) Military Factory 26 February 2015
  28. 1 2 "Navy rejects Tejas, says 'overweight' fighter does not meet its requirements". Times of India. Retrieved 22 December 2016.
  29. "Navy rules out deploying ‘overweight’ Tejas on aircraft carriers". indianexpress.com. 2 December 2016. Retrieved 22 December 2016.
  30. "Indian Navy seeks EMALS system for second Vikrant-class aircraft carrier". Naval Technology. 30 May 2013. Retrieved 17 May 2015.
  31. "US defence secretary to visit India in May to push aircraft carrier technologies". The Times of India. 5 April 2015. Retrieved 17 May 2015.
  32. "INS Vikrant's first victory: being built from Indian steel". Business Standard. 7 August 2013. Retrieved 7 August 2013.
  33. "India overhauls coastal security, Navy gets charge". NDTV.com. 28 February 2009. Retrieved 1 February 2011.
  34. "India to lay keel of new aircraft carrier on Saturday | World | RIA Novosti". En.rian.ru. 26 February 2009. Retrieved 1 February 2011.
  35. "India joins elite warships club". Deccan Herald. 1 March 2009. Archived from the original on 2012-07-15. Retrieved 15 July 2012.
  36. Sandeep Unnithan (18 February 2009). "Keel laying of indigenous aircraft carrier next week". Indiatoday.intoday.in. Retrieved 1 February 2011.
  37. "Indigenous Aircraft Carrier’s nucleus ready - India - DNA". Dnaindia.com. 7 October 2010. Retrieved 1 February 2011.
  38. "Indigenous aircraft carrier a year behind schedule". The Hindu. 12 March 2011. Retrieved 31 December 2011.
  39. "INS Arihant on track". The Hindu. 3 December 2011. Retrieved 31 December 2011.
  40. "‘Indigenous aircraft carrier launch this Dec’". Zee News.
  41. First indigenous aircraft carrier to be completed by Dec: Govt, IBN Live News Archived 7 November 2012 at the Wayback Machine.
  42. Sudhi Ranjan Sen (20 November 2012). "Indian aircraft carrier: More costly, already delayed". NDTV.com.
  43. From 12th Langkawi International Maritime and Aerospace Exhibition (LIMA 2013) Between March 26 & 30
  44. "Indian Carrier Sails from Russia for Final Sea Trials". July 8, 2013.
  45. "Tejas Light Combat Supersonic Fighter, India". Retrieved 17 November 2016.
  46. "India to Start Production of Its Tejas Mark 1A Fighter Jet by 2021". Sputnik News. Retrieved 17 November 2016.
  47. 1 2 3 4 "Hopeful of getting INS Vikrant by 2020, says Navy chief". The Indian Express. Express News Service. June 1 2017. Check date values in: |date= (help);
  48. "Indigenous aircraft carrier to be launched in August: AK Antony". CNN-IBN. Retrieved 2013-11-18.

Videos

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.