A10 motorway (Romania)
A10 motorway | |
---|---|
Autostrada A10 | |
Sebeș–Turda Motorway Autostrada Sebeș–Turda | |
Route information | |
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | |
Length: |
0.0 km (0.0 mi) 70.0 km (43.5 mi) planned 70.0 km (43.5 mi) under construction |
Major junctions | |
From: | Sebeș (junction with A1) |
To: | Turda (junction with A3) |
Highway system | |
Motorways in Romania |
The Sebeș–Turda Motorway (Romanian: Autostrada Sebeș–Turda) is a motorway under construction in the central-western part of Romania, that will connect the A1 and the A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is planned to be 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway is divided into four lots:[1] works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots they will begin in June or July.[2] It will reportedly have the A10 designation.[3]
Sections
The construction is split into the following four segments, the contracts for which have been awarded in December 2013:[4]
- Lot 1: 17.0 km, from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului, awarded to the building consortium of Impresa Pizzarotti & Pomponio Construcţii SRL, for a cost of 541.739.137 lei.
- Lot 2: 24.3 km, from Paraul Iovului to Aiud, awarded to building consortium of Aktor SA & Euroconstruct Trading’98 SRL for a cost of 549.332.493 lei.
- Lot 3: 12.5 km, from Aiud to the Decea interchange, awarded to the building consortium of Tirrena Scavi SpA and Societa Italiana per Condotte d'Acqua SpA, for a cost of 420,511,921 lei.
- Lot 4: 16.3 km, from the Decea interchange to the interchange with the A3 motorway near Turda, awarded to Porr Construct SRL and Porr Bau GmbH, for a cost of 470,004,894 lei.
Openings timeline
- Next scheduled opening: segment from Turda to Aiud, 28.8 km, in September 2017.
Exit list
Exits and buildings (Northbound) | ||||
Sebeș – Turda (70 km) | ||||
km 0 | Sebeș North | |||
km 4 | Parking | |||
km 8 | Alba Iulia | |||
km 17 | Alba Iulia North | |||
km 26 | Teiuş, Blaj | |||
km 41 | Aiud | |||
km 53 | Decea, Unirea, Ocna Mureş | |||
km 60 | Parking | |||
km 70 | Turda |
See also
References
- ↑ "Licitație pentru autostrada Sebeș-Turda. Proiectul a fost împărțit în patru loturi". Adevărul. 22 July 2013.
- ↑ "AUTOSTRADA SEBEȘ-TURDA: Au început lucrările pe loturile 3 și 4, faza de proiectare, de la intrarea în Aiud până la Turda". Alba24. 20 May 2014.
- ↑ "Toate ofertele depuse pentru autostrada Sebes-Turda". Hotnews. 5 November 2013.
- ↑ "Autostrada 10 Sebes-Turda" (in Romanian). 130km.ro. Retrieved 2013-12-24.
External links
- Collection of news articles about the motorway
- Map of the planned motorway route
- Detailed planning documentation